• 제목/요약/키워드: Schedule Hierarchy

검색결과 32건 처리시간 0.026초

AN EXAMPLE OF REPRESENTING THREE LEVEL'S SCHEDULES WITHIN SCHEDULE HIERARCHY BY BDM TECHNIQUE

  • Seon-Gyoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.445-452
    • /
    • 2011
  • The schedule hierarchy in construction project is generally composed of three levels. The highest level is a milestone schedule and represented by Bar Chart format. The middle level is an integrated project schedule (IPS) and represented by CPM (Critical Path Method) format. The lowest level is a detail working schedule and usually represented by Bar Chart. The traditional scheduling techniques such as ADM (Arrow Diagramming Method) or PDM (Precedence Diagramming Method) cannot represent all kinds of schedule within schedule hierarchy as identical schedule format. However, the BDM (Beeline Diagramming Method) technique can represent all kinds of schedule within schedule hierarchy as identical CPM format. This paper describes the basic concept, principle, interpretation methods, and schedule computation methods of the BDM as a new networking technique that can represent all kinds of overlapping relationships between activities, and then presents an example of representing three level's schedules within schedule hierarchy by the BDM technique.

  • PDF

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • 제47권3호
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

BDM 네트워크 공정 및 비용 진도율 통합관리 개념 (The Concept of Schedule and Cost Progress Integrated Management on the BDM Network)

  • 김선규;이용현;노성범;고대규
    • 한국건설관리학회논문집
    • /
    • 제12권6호
    • /
    • pp.54-64
    • /
    • 2011
  • 국내 건설산업에 CPM(critical path method) 공정관리기법이 도입된 지 거의 40년 가까이 경과하고 있다. 그러나 국내건설현장의 대부분은 CPM 공정표를 작성하지 않거나, 발주처의 요구에 의해 수동적으로 작성한 후 운영 및 관리는 거의 하지 않고, 아직도 바차트(bar chart)기법에 의존하여 공정관리를 하고 있는 실정이다. 이러한 원인중 하나는 CPM 공정계획이 건설현장의 업무를 정확히 반영하지 못하고 있으며, 공사 진척현황을 시각적으로 명확하게 인식하기 어렵고, 작업들의 일정중심의 공정진도와 기성금액 중심의 비용진도를 효율적으로 통합 관리하지 못하기 때문이다. 본 논문은 새로운 CPM 공정관리기법인 BDM기법을 통해 공정계층체계 내에서 CPM 공정계획이 자동으로 요약되면서 동일한 CPM 형식을 유지하는 기능을 통해, CPM기법의 장점을 그대로 유지하면서도 일정중심의 공정진도율과 기성중심의 비용진도율을 통합 관리할 수 있는 새로운 진도율 관리 개념을 제안한다. 이러한 개념을 통해 국내 건설사업에 CPM 공정관리기법이 실질적으로 적용되고 활성화되어, 공사관리의 효율성이 향상되는 동시에 국내 건설사업관리의 발전에도 일조 할 수 있기를 기대한다.

착공전 단계에서의 철근콘크리트 공사 공정리스크 관리 방안 (Schedule Risk Management of Reinforced Concrete Construction at the Preconstruction Phase)

  • 류한국;김선국;이현수
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.119-127
    • /
    • 2005
  • 최근의 건설시장 축소와 주 5일 근무제도, 공기단축형 입찰제도의 도입, 후분양제도의 도입 등의 제도적 변화에 따라 건설 수주 경쟁은 더욱 치열해지고 있다. 그러나 건설공사는 공기지 연을 유발하는 수많은 공정리스크가 존재하고 있으며 이러한 공정리스크에 대한 인식과 그에 따른 체계적인 관리가 부진한 경우 건설공사의 경쟁력을 확보하는 데 여러 어려움이 존재한다. 이러한 문제점을 해결하기 위한 기존 연구는 공정리스크의 분류, 공정 리스크의 관리, 리스크 관리를 위한 시스템 개발에 치중하였다. 이에 본 연구는 전체 공정에 영향력이 크며, 위험발생 확률이 높은 철근콘크리트공사를 대상공종으로 선정하고 기존연구를 바탕으로 수차례의 전문가 면담과 난상토론을 실시하여 현실적인 리스크 요인과 관리방안을 제시하였다.

군용항공기 연구개발 사업의 리스크 관리 (Risk Management for R&D Projects in the Military Aircraft Systems)

  • 김성훈;이현철
    • 산업경영시스템학회지
    • /
    • 제44권4호
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

클라우드 컴퓨팅에서 Analytic hierarchy process를 활용한 작업 스케줄링 기법 (A Job Scheduling Scheme based on Analytic Hierarchy Process in Cloud Computing)

  • 김정원
    • 한국컴퓨터정보학회논문지
    • /
    • 제18권8호
    • /
    • pp.9-15
    • /
    • 2013
  • 클라우드 컴퓨팅을 구성하는 자원은 이질적인 자원으로 구성되므로 다양한 요구사항의 작업을 이질적인 자원에 할당하는 것은 중요한 문제이다. 이는 다수의 판단 기준하에 다수의 선택 문제로 정의할 수 있는데 본 연구에서는 AHP (Analytic hierarchy process) 기법을 통해 이 문제를 해결하고자 한다. 본 연구에서는 작업의 특성을 고려한 우선순위기반 스케줄링 기법을 제안하는데 1단계에서는 작업의 중요도에 의해 우선순위를 부여하고 2단계에서는 응답시간, 시스템 이용율, 그리고 비용을 판단기준으로 하여 AHP알고리즘에 의해 최적의 자원에 작업을 할당한다. 제안하는 알고리즘의 분석과 실험을 통해 제안 기법의 효율성을 제시하고자 한다.

Smalltalk 패러다임을 이용한 객체지향 시뮬레이션기반 전문가시스템 (Object-Oriented Simulation-Based Expert System Using a Smalltalk Paradigm)

  • 김선욱;양문희
    • 산업경영시스템학회지
    • /
    • 제24권66호
    • /
    • pp.1-10
    • /
    • 2001
  • Simulation-Based Expert System(SIMBES) is a very effective tool to solve complex antral hard problems. The SIMBES model includes a simulator, a feature extractor, a machine learning system, a performance evaluator, and a Knowledge-Based Expert System(KBES). Since SIMBES depends on Problem domains, a schedule-based material requirements planning problem, which is NP-hard, was selected to exemplify the SIMBES model. To implement the SIMBES application in Smalltalk paradigm, a system class hierarchy was constructed. The hierarchy consists of five large classes such as Job Generator, Job Scheduler, Job Evaluator, Inference Engine, and Executive System. Several classes inside these classes were identified. Additionally, instance protocols about all classes have been described in terms of messages and pseudo methods. These protocols can be implemented easily by any other object-oriented languages. Furthermore, these results may be used as a skeletal system to develop a new SIMBES efficiently, especially when the application is related to other scheduling problems.

  • PDF

인천국제공항 배전계통의 신뢰도 평가에 관한 연구 (A Study on the Reliability Evaluation for Inchon International Airport Distribution System)

  • 김용하;이범;최상규;정영식;문정호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권10호
    • /
    • pp.1198-1205
    • /
    • 1999
  • This study is focused on the reliability evaluation for distribution system based on deterministic evaluation technique. Average failure rates, average outage time, and average annual outage time of electrical parts and load points are calculated through network reduction method and failure mode & effective analysis method. And reliability indices of distribution system are calculated. Finally, by employing analytic hierarchy process method, unique index which evaluates and improves the distribution system is calculated. As a result, finding weak points and expansion schedule of the system is possible. The usefulness of this method is verified by applying it to the Inchon International Airport.

  • PDF

수리모형 기반의 계층적 열차경합관리 설계 및 구현 (Design and Implementation of Mathematical Model based Hierarchical Conflict Detection and Resolution)

  • 김경민;홍순흠
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.687-694
    • /
    • 2008
  • 일반적으로 열차경합은 사고나 인프라고장(선로, 신호기, 선로전환기 등) 등의 외란 발생으로 인하여 본래의 스케줄에 따라 열차운영을 할 수 없는 상황으로 정의 되어진다. 열차경합관리의 주요 목적은 열차 운영 중에 발생하는 열차경합을 사전에 검지하고 해소하는 것이다. 경합의 검지 방법은 선후행 열차간 운행시격과 최소 열차운행시격, 허용가능 지연시간초과, 선로 폐쇄상태의 시스템 자동검지 등 다양하며 해소 방안 역시 속도조절, 대기시간변경, 교행/대피 순서변경, 플랫폼 사용 변경 등 여러 가지가 복합적으로 적용된다. 현재 대부분의 열차운행제어체계는 중앙집중방식이며 소규모 역에서의 경합관리역시 원격으로 중앙에서 하고 있으나 CTC 차원에서 모든 역 상황을 최적으로 통제하는 것은 무리가 있다. 또한, 입환과 같은 구체적인 작업들은 CTC차원에서 파악조차 힘들기 때문에 로컬에서 수행하고 있는 실정이다. 본 연구에서는 경합관리를 계층적으로 라인경합관리, 역경합관리 2가지로 구분하고 경합검지 및 해소에서 각각의 역할분담 및 협조체계를 설계하였다. 또한, 각각의 경합관리에서는 수리모형에 기반한 최적화모델을 적용하여 현실적이고 합리적인 경합관리모델 구현방법을 제시한다.

  • PDF