• Title/Summary/Keyword: Safety plan

Search Result 2,292, Processing Time 0.034 seconds

A Study on Development Plan of Domestic City Gas Safety Management (국내 도시가스 안전관리제도의 발전방안에 관한 연구)

  • 정원익;양광모;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.5-8
    • /
    • 2004
  • Domestic city gas is supplying in an about 10 million household on present 34 city gas companies because is begun to supply regularly after two 1980 years middle. But, result that focus on city gas supply spread and stable supply for supply area and neglects about safety problem, hundreds casualties such as Ahyun explosion accident and Deagu city gas explosion accident were reached in situation that occurred large size calamity occurs it is dizzliness. In the case of advanced nation, can see that accomplish system and progress that in technology after experience major accident. Therefore, grasp problem investigating safety actual conditions for city gas institution and study about solvable plan is required this. Also, must guide reform and level elevation of a domestic company safety technology through induction and development of safety technology that is suitable in supply, domestic real condition etc. Must help in power positivity that is full text executing high-quality safety education about step High firing mechanism safety technology than present safety education.

  • PDF

A Case Study on Safety Case for the Verification of Railway Safety (철도시스템의 안전운영 검증을 위한 Safety Case 사례연구)

  • Kwak Sang-Log;Kim Sang-Ahm;Wang Jong-Bae;Cho Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.618-622
    • /
    • 2005
  • Railway safety case is an important measure for demonstrates operating company's capability, commitment and competence in accordance with Railway Regulation 2000 in UK. Safety case describes the scope of operation, definition and boundary of activity, risk analysis, system safety activity, annul safety plan. Relationships between' these components and company's policy, organization, human resource, control measure, investment plan are also included. A case study for Network Rail (infrastructure manager)'s safety case is described in this paper for the construction of safety rule and safety planning.

  • PDF

A Study on the Actual Condition Analysis and Activation Plan of Smart Construction Safety Technology by the Survey (설문조사를 통한 스마트 건설안전기술의 실태분석 및 활성화 방안에 대한 연구)

  • Kim, Y.S.;Oh, T.K.;Kim, C.S.;Lee, N.E.;Hong, C.S.;Lee, S.Y.;Yoon, Y.G.
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.1
    • /
    • pp.30-40
    • /
    • 2022
  • The death rate in the construction industry, which is more than twice that of other industries, increases the need to solve chronic safety problems. In a situation in which the safety management measures that have been maintained thus far are unable to reduce construction accidents, the introduction of smart construction safety technology (SCST) that reflects the 4th industrial technology is required for the safety management of workers. Large corporations or public institutions have introduced SCST and are operating pilot sites, but SCST is still in its infancy and there have yet to exist field data regarding necessity and effectiveness. In this study, the concept of SCST, which has still to be established, is defined, and the actual condition of SCST was analyzed through a survey. Through the analysis of the necessity of SCST introduction, convenience, and effectiveness before and after its application, problems such as problems from the field point of view as well as other factors hindering the introduction of such technology are derived in detail. In addition, an effective combination of technologies for safety management at the current level is determined and an activation plan is presented.

Human Factors Design Review of CFMS for Improving the Safety of Nuclear Power Plant (원전의 안전성 제고를 위한 CFMS의 인간공학적 설계 검토)

  • 이용희;정광태
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.201-208
    • /
    • 1997
  • In order to improve the safety of nuclear power plant, we performed a human factors review for the CFMS(Critical Function Monitoring system) design of nuclear power plant. Three works were performed in this study. In first work, we developed human factors engineering program plan(HFEPP) and human factors engineering verification and validation plan (HFE-V & V plan) to effectively perform CFMS design and review. In second work, we identified human engineering discrepancies(HEDs) for CFMS design through human factors design review and proposed those resolutions. In the third work, we developed the evaluation and management methodology for identified KEDs. Methodology developed in this study can be used in other complex system as well as in CFMS design review.

  • PDF

A study on the Activation Plan Using public purchase system of the Disability Firm manufactured product (장애인기업 생산제품의 공공구매제도를 통한 활성화 방안에 관한 연구)

  • Song, Soo-Jeong;Won, Joon-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.145-151
    • /
    • 2010
  • The research which sees the disability firm led and public procurement market penetration the base will be able to grow prepared and with the petal of the disability firm for a support disability firm manufactured product public purchase activation plan of the government offices groped. disability firm manufactured products purchase promotion plan and policy of the government offices presents the fact that with the aim.

Range Safety Activities for the Launch of an Earth Observation Satellite

  • Im, Jeong-Heum
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.194.2-194.2
    • /
    • 2012
  • Korea Aerospace Research Institute has developed an earth observation satellite and it was launched into its orbit in 2012 by using a foreign commercial launch vehicle. The launch site authority has imposed safety requirements to the spacecraft developer to ensure the safety of the personnel and to protect launch vehicle, spacecraft and facilities from accidents associated with the satellite operation at the launch site. This paper describes the range safety activities implemented for the satellite and supporting equipments during the whole phase of their design, manufacturing/test and operation at the launch site. To ensure the integrated requirements for safety management and design, system safety program plan has been developed. And based upon the plan, spacecraft developer conducted hazard analysis to identify and establish safety requirements to reflect in designs, procedures, operations. The result of the hazard analysis has been complied into safety data packages and it was reviewed by launch site review board at the safety reviews and finally it was approved to launch.

  • PDF

A Study on Practical Method of Utility Curve for Deciding Priority Order of the Improvements in Traffic Safety Audit (교통안전진단 개선방안들의 우선순위 산정 연구)

  • Choi, Ji Hye;Kang, Soon Yang;Hong, Ji Yeon;Lim, Joon Beom
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.3
    • /
    • pp.143-155
    • /
    • 2016
  • Recently, a massive loss of life and property is occurring in Korea due to traffic accidents, with the rapid increase in cars. For improvement of traffic safety, the Korea Transportation Safety Authority intensively analyzes accident data in local governments with low traffic safety index, performs a field investigation to extract problems and offers local governments improvements for problems, by conducting the 'Special Survey of Actual Conditions of Traffic Safety' each year, starting 2008. But local governments cannot strongly push forward the improvement projects due to the limited budget and the uncertainty of the improvement plan effects. Therefore, this study suggested a model which applied the Utility concept to the AHP theory, in order to efficiently decide a priority of the improvement plans in accident black spots in consideration of the limited budget of local governments. The number of accidents in each spot for improvement and accident severity, traffic volume, pedestrian volume, the improvement project cost and the accident reduction effect were chosen as evaluation factors for deciding a priority, and data about the improvement plan costs and the accident reduction effects, traffic accidents and traffic volume in the spots to undergo the special research on the real condition of traffic accident in the past were collected from the existing studies. Then, regression analysis was carried out and the Utility Curve of each evaluation factor was computed. Based on the AHP analysis findings, this study devised a priority decision method which calculated the weight and the utility function of each evaluation factor and compared the total utility values. The AHP analysis findings showed that among the evaluation factors, accident severity had the biggest importance and it was followed by the improvement plan cost, the number of accidents, the improvement effect, traffic volume and pedestrian volume. The calculated utility function shows a rise in utility, as the variables of the 5 evaluation factors; the number of accidents, accident severity, the improvement plan effect, traffic volume and pedestrian volume increase and a fall in utility, as the variables of the improvement plan cost increase, since the improvement plan cost is included in the budget spent by a local government.

Analysis of earthquake countermeasure for electrical facility at building (건축물에 시설되는 수변전설비의 지진 대책에 대한 조사 분석)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Jean, Hyun-Jae;Bae, Suk-Myong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.359-362
    • /
    • 2008
  • Middle domestic the occurrence size which stews recently from the Korean Peninsula circumference country is augmenting on a large scale about earthquake about safe countermeasure part from the existing Natural Countermeasure Law 2008. Refers with the Earthquake Disaster Countermeasure Law to be new standard contents establishment by law and strengthened in March. Consequently the research is propelled about electric equipment earthquake-proof plan and countermeasure. The present paper investigated an equipment by domestic facility present condition about the change disappointment electric equipment which can supply all the member in the building an investigation analysis about problem point and improvement fact. Also about overseas electric equipment investigated about earthquake-proof plan relation system and facility present condition. Investigated the electric equipment earthquake-proof plan pertinent data which is advanced from like this existing nation and the equipment and application direction must apply to domestic presented. With character presents following the guide about electric equipment earthquake-proof plan becomes feed with the fact that will be able to use.

  • PDF

The Research on the Real-time Emergency Response Plan for the Company based on Consequence Analysis for Chemical Accidents (화학사고 발생 시 피해예측 모델과 연계된 사업장의 실시간 비상대응 체계에 관한 연구)

  • Jun Ho Ha;Chang Jun Lee
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.2
    • /
    • pp.28-37
    • /
    • 2024
  • The recent surge in the production and handling of hazardous materials in Korea necessitates developing and implementing robust emergency response plans. These plans are crucial in safeguarding the well-being of workers and residents in the event of an incident. The consequence analysis methodology outlined in the KOSHA guidelines provides a foundation for designing emergency response plans in the event of chemical accidents. However, the consequence analysis is evaluated based on assumed accident cases or worst-case scenarios. Consequently, the emergency response plan based on the consequence analysis may overestimate the damage area, complicating rescue efforts and unnecessarily increasing costs. More information and parameters become available after an accident, enabling more accurate consequence analysis. This implies that the results of consequence analysis based on this detailed information provide more realistic results than those based on assumed accidents. This study attempts to optimize the resource allocation and cost-effectiveness of emergency response plans for chemical accidents. Existing procedures and manuals are revised to elucidate the proposed model and conduct real-time consequence analysis. The existing emergency response plan is compared to verify the proposed model's efficacy. The obtained results indicate that the proposed model can exhibit better performance.

Identification of Railway Safety Issue for Mid and Long Term Safety Plan (중장기 철도안전계획 수립을 위한 철도시스템 문제점 도출 연구)

  • Kwak Sang-Log;Park Joo-Nam;Wang Jong-Bae;Cho Vun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.32-37
    • /
    • 2005
  • Many developed countries use risk based safety management system. Currently many research efforts are made for the application of risk concept in safety management within the boundary of the railway safety act 2005. But results of these efforts can be applied around 2008 due to many background data and analysis techniques. For the prompt and efficient construction of mid and long term safety plan$(2006\~2010)$ various reports on safety issues and expert opinions are analysed in this study without risk analysis. Identification of railway safety issues are summarized and effective measure are proposed in this study.

  • PDF