• Title/Summary/Keyword: Safety operation

Search Result 4,470, Processing Time 0.027 seconds

Development of Regulatory Technology on Aging for Continued Operation of Wolsong Unit 1 (월성1호기 계속운전 경년열화 규제기술 개발)

  • Kim, Hong Key;Song, Myung Ho;Nho, Seung Hwan;Kim, Se Chang
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.4
    • /
    • pp.57-62
    • /
    • 2011
  • As NPPs' operating times increase, the integrity of nuclear components is continually degraded due to aging effects of systems, structures and components. In addition, for the case of continued operation beyond design life, additional aging effects occurred during the extended operating period lead to more degradation of the integrity of nuclear components. Therefore, it is very important to mange and evaluate the aging to secure the safety of NPPs. Wolsong unit 1 is approaching to its design life of 30 years in 2012. The license renewal documents for continued operation of Wolsong unit 1 Is under reviewing now. In this paper, regulatory technologies for continued operation of Wolsong unit 1 developed by KINS will be introduced. That technologies include the safety review guidelines, regulatory guides for aging management program and regulatory program for audit calculation.

A Case Study on PL Management in Small and Medium-Sized Firms of Gangwon-Do Province (강원도 중소기업의 제조물책임법 대책에 대한 연구)

  • Park, Roh-Gook;Lee, Sung-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.3
    • /
    • pp.99-107
    • /
    • 2008
  • Product liability(PL) is the producer's compensation to customers for damage incurred by product defects. This paper studies on the organizational culture, promotion process, system construction, system level, product safety review, product safety assurance, system operation, and its effectiveness and necessity of recognition for the PL system of small and medium-sized firms in Gangwon-Do province. The results show that the firms have product safety regulations, but the number of firms which its employees understand the regulations is less than the number of firms which do not understand. Also the number of firms which is preparing PL prevention and insurance, and counterplan for accidents seems to be not in large numbers.

A study on the safety management method based on the risk assessment of KORAIL's level-crossing accidents (선진 위험도 평가 기반의 건널목사고 안전관리 전략 연구)

  • Jung, Do-Won;Wang, Jong-Bae;Lhim, Jea-Eun
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1732-1750
    • /
    • 2010
  • Operation of KORAIL's level crossing is in charge of KORAIL. As taking over existing level crossing to KORAIL, they do not conduct risk assessments, so we do not know about any possibilities of inner risk. And present operation of safety of the level crossing is just regular checking of reaction and functions of safety equipments physically, we need to react to the changes of what's going on around of level crossing and incestigation of traffic flow and surrounding conditions more spontaneously. So, we have to prepare the strategies against accidents of level crossing cost-effectively based on regular risk assessments for sustainable safety improvements and overcome operational problems of present level crossing's safety. Here, we're going to investigate the level of safety level and present risk factors of the level crossing using risk assessments for accidents/error of the equipments to show operational strategies of level crossing based on risk assessments.

  • PDF

A Basic Study on the Improvement of Software Reliability of Signaling Safety System (신호보안시스템의 소프트웨어 신뢰성 향상에 관한 기초연구)

  • 김종기;이종우;정의진;조봉관
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.319-326
    • /
    • 2001
  • Railway signaling safety system organizes equipments and facilities of railway, increases transport efficiency and assures safe operation of railway. In the early days of signaling system railway managers made sure of safety by using relay logic technology based on fail-safe concept. But the development result of computer and science having been introduced to railway industry, railway signaling equipments begin to be operated through micro electronic control system. Accordingly high speed and high density operation of train became possible. Software reliability and safety technology that controls important systems of railway was highlighted. In the middle of 1990s the standard or guideline of railway reliability and safety were studied and established, and are being reviewing in Europe, Japan etc. Our reliability and safety technology have depended largely on foreign countries. In this study we performed a basic study about the reliability of software that controls the railway signaling system.

  • PDF

An Industrial Psychological Study On Labor Accidents (노동재해에 대한 산업심리학적 고찰)

  • 현영기
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.3 no.3
    • /
    • pp.41-48
    • /
    • 1980
  • Industrial Psychology is to study and analyze human behavior or working at operation, both to look into the rules in that and to make analysis of rules made from theological basis adapted to reality, wi th methods and knowledges that Psychology gives, by methods that are observation, experiment , investigation and so on, to contribute to improving the production efficiency and promoting the Laborer's welfare, In this paper, the side of Psychology in labor accidents will be studied as follows. 1.The Presentation of Problems 1.1. Concept prescription of Industrial Psychology 1.2. Relation between Industrial psychology and accidents 2.The Theorical approach of Industrial Psychology for accident study 2.1 Industrial Psychology in approach of accident study 2.2. Cooperative effort from other corvelative science 3. Industrial Psychologic observation on important safety policy 3.1. Study of accident origin 3.2. Safety of material equipment 3.3. Safety of work condition 4. Industrial psychological subject on safety instruction development 4.1. Safety instruction and attitude of laborers 4.2. Operation of safety rules 4.3. Safely counselling 4.4. Measures for the injured 5. Conclusion.

  • PDF

A Study on MORT Application for Safety in the Industrial Robot Operation (산업용 로봇작업시 안전을 위한 MORT기법적용에 관한 연구)

  • 이윤원;이동경;신용백
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.3
    • /
    • pp.13-23
    • /
    • 2002
  • The use of industrial robots has been one of the most important innovations in production technology in recent years. It is true that robotic techniques, as applied to hazardous operation in industry, have reduced the risk of injury and occupational disease among workers. However, new types of occupational safety and health risks, associated with unpredictable motion patterns and erratic idle times and serious injuries and deaths have occurred due to operator misperception of these robot design and performance characteristics. This paper provides an overview of ergonomic and safety issues which are important in the design of robotic workspaces. Particularly, this study uses MORT(Management oversight and risk tree analysis)as the system's safety technique applied to robotics.

Development of a Supporting Program for the Emergency Preparedness Plan (사고대비물질 취급자의 비상대응계획 작성 프로그램 연구)

  • Kim, Sung-Bum;Noh, Hye-Ran;Seok, Gwang-Seol;Park, Jae-Deuk
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.5
    • /
    • pp.54-58
    • /
    • 2011
  • Emergency preparedness plan(EPP) is the systematic management of activities that involve a material degree of risk of loss or other damage to the surroundings(people, property and environment), and the boundary of accident recovery plan(ARP). The main purpose of the program is to provide a safety management system to each facility in order to enable to prevent accident and to control accident immediately. The EPP includes not only typical safety-related documentations such as material safety data sheet(MSDS), standard operation procedure(SOP), emergency response plan(ERP). EPP is established basis of the preliminary safety analysis involving risk identification, assessment and prevention plans. The program is also helpful for government or related agencies to control a number of accidents in small-scale companies in the whole country.

A Study on Development Plan of Design and Operation for Education Training of Disaster & Safety Field Workers with the Amendment of Framework Act on the Management of Disasters and Safety (재난 및 안전관리기본법 개정에 따른 재난안전분야 종사자 교육훈련 설계 및 운영 발전 방안 연구)

  • Nam, Sangwhun;Park, HaeJung
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.4
    • /
    • pp.484-492
    • /
    • 2013
  • The purpose of this study is to propose development plan for systematic design and management of disaster and safety education curriculum in accordance with the revision of Framework act on the management of disasters and safety. The curriculum is intended for current disaster management professionals. Prior to analysis, disaster and safety professionals were classified into three categories: disaster practitioner, disaster manager, and disaster higher manager. And based on 24 disaster safety functions and 13 disaster management competence items, priorities of their task ability were derived. Considering practical effect of disaster and safety education, the course curriculum is divided to target groups of disaster practitioner, disaster manager, and disaster higher manager. Disaster management education curriculum and its design are based on the results of disaster prevention education contents development planning to reflect the elements of advanced disaster management education and to consider brand making of the curriculum and operation pattern.

Damage Pattern and Operation Characteristics of a Thermal Magnetic Type MCCB according to Thermal Stress (열동전자식 MCCB의 열적 스트레스에 따른 소손 패턴 및 작동 특성)

  • Lee, Jae-Hyuk;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.69-73
    • /
    • 2013
  • The purpose of this paper is to analyze the carbonization pattern and operation characteristics of an MCCB. The MCCB is consisted of the actuator lever, actuator mechanism, bimetallic strip, contacts, up and down operator, arc divider or extinguisher, metal operation pin, terminal part, etc. When the actuator lever of the MCCB is at the top or the internal metal operation pin is in contact with the front part, the MCCB is turned on or off. It means trip state if the actuator lever or the internal metal operation pin moves to back side. In the UL 94 vertical combustion test, white smoke occurred from the MCCB when an average of 17~24 seconds elapsed after the MCCB was ignited and black smoke occurred when an average of 45~50 seconds elapsed. It took 5~6 minutes for the MCCB surface to be half burnt and took an average of 8~9 minutes for the MCCB surface to be entirely burnt. In the UL 94 test, the MCCB trip device operated when an average 7~8 minutes elapsed. If the MCCB trip has occurred, it may have been caused by an electrical problem such as a short-circuit, overcurrent, etc., as well as fire heat. From the entire part combustion test according to KS C 3004, it was found that the metal operation pin could be moved to the MCCB trip position without any electrical problems.