Metro subway construction is a field that requires a great deal of professional manpower. The aging of professionals has a negative impact on both productivity and health, owing to poor working environments, heavy lifting, underground work, and other factors. To address this issue, the government is progressively revising and enforcing health management law and regulation in the construction industry. Thus, the job stress and work ability of many professional subway construction workers, who are rapidly aging, are being analyzed to ensure their safety and improve their health. In this study, the Macpa stress index of Busan Metro Subway construction workers from Sasang to Hadan line was measured by using a Macpa measurement machine, and a work ability survey was conducted by using the questionnaire that was developed by the FIOH. The independent variables were age, years of service, job position, employment type, and occupation. While, the dependent variables were the Macpa stress index and work ability. The Kruskal-Wallis test was used because it was difficult to assume that the statistics of this study represented a normal distribution. The results showed that age, job position, and employment type affected Macpa stress index and revealed that as the age of the workers increased, their stress levels increased as well. Additionally, job position and employment type affected the work ability of the metro subway construction workers. In terms of job position, the technical engineers were under a lot of stress, and whereas the managers had the best work ability. The technical engineers were more stressed than the other workers because of a poor working environment. In terms of employment type, daily workers were under more stress and lower work ability than others.
Urban rail transit offers target performance and function because various lower part system such as rolling-stock, signal, power and trackis consisted as complex. In order to function properly an urban rail transit which is complicated system to work as safety and reliability, System must secure safety with structure, design, manufacture, install and verification and it is important to establish a safety standard follows it procedures, establish what step all it is important to operate. Safety standard of urban transit infrastructure is minimum standard necessary to secure safety of signal, power and track. Urban rail transit standard business leads to make many requirements. Recently, many types of equipment have applied to manage requirements and standards for system efficiently in part of universal, airline and car accordingly applied equipments use to manage a pursuit(Trace) between standard of system. Especially importance of management is emphasized more become more. Importance of standard management which usesa computing support tool recently in transit filed is embossed and is predicted to be more such forward. Therefore we propose the effective method of management with infrastructure system by constructed data-base system.
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.32
no.4
/
pp.393-401
/
2022
Objectives: OHSMS, which was introduced by Serious Accident Punishment Act as a means for safety and health management at work place, but it is not effective according to recent statistical data. Therefore, I intend to compare the OHSMS regulations of SAPA based on ISO 45001, the international standard of OHSMS, and examine the differences and problems. Methods: The OHSMS regulation of Serious Accident Punishment Act was compared and analyzed using the content standard of ISO 45001, the international standard of OHSMS. The construction and operation aspects and differences in key concept definitions of OHSMS were analyzed in depth. Results: ISO 45001 aims to provide OHSMS with an autonomous framework to manage risks and opportunities in safety and health management, whereas Serious Accident Punishment Act aims for safety and health management through an interest and effort in safety and health management on the premise of legal responsibilities of corporations and CEO. As a result, comparing to ISO 45001 in construction and operation aspects and differences in key concept definitions of OHSMS, the OHSMS of Serious Accident Punishment Act do not cover the entire business in concept definition and construction. Conclusions: In order for Serious Accident Punishment Act to achieve its original purpose of preventing serious accidents through systemic safety and health management, it is necessary to correctly understand the contents of ISO 45001 and to revise the OHSMS regulations in a direction that can ensure predictability and feasibility.
This study identified the actual conditions for safe anticancer drug management among nurses and the relationship between level of awareness and performance of anticancer drug safety regulations in terms of preparation, administration, and disposal. The respondents were 236 nurses working with chemotherapy in wards and outpatient clinics in five hospitals in and near Seoul. Safety regulations provided for the anticancer drug the Occupational Safety Health Administration (OSHA, 1999), as modified for an earlier study, were used. The results showed that the level of awareness and performance on the anticancer drug safety regulations indicate their preparation ($3.38{\pm}0.55$, $2.38{\pm}0.98$), administration ($3.52{\pm}0.46$, $3.17{\pm}0.70$), general handling and disposal ($3.33{\pm}0.54$, $2.42{\pm}0.90$) on a scale 0 to 5. Also, there were significant differences in job positions, work experience, type of preparation, and continuing education and a positive relationship between the level of awareness and nursing performance. Thus, nurses should receive continuing education on the handling of anticancer drugs to improve the level of performance following safety regulations.
Objective: The purpose of this study is to measure the workload of Korea coastal ship crew members, to investigate whether they are following work-break time regulations and to identify the main causes of their workload. Background: According to the US Coast Guard, about 33% of human casualties are reported to be due to fatigue, and 30% of marine casualties reported by the British Marine Accident Investigation Agency (MAIB) are attributed to crew fatigue. But the coastal ship are not managed for business hours and breaks despite the harsh environment. Method: The workload of duty crew members on the 100 domestic coastal vessels was measured. It was also investigated whether they are following domestic and international work-break time regulations. Finally, the marine accidents resulted from the fatigue of the crew was analyzed. Results: As a result of workload analysis, the workload on the 42~62% of the vessels exceeded the standard of working time on the related regulation. The workload increased with the number of inbound and outbound ports. Especially, in the system where there are two seafarers, the workload exceeded the working time requirement. As a result of the marine accidents analysis on 100 vessels, it was found that collision and grounding occurred due to fatigue, workload and drowsiness in 7 marine accidents out of 30 marine accidents. Conclusion: It is necessary for the shipping companies to introduce an operation management manual for the management of the crews' workload and reasonable crew arrangement. It is also required for crew members to easily record work times and for shipping companies to manage the record. It would be possible to prevent many marine accidents by providing adequate rest to the crews and flexibly adjusting their working hours. Application: The results of this study can be used as fundamental data to manage crews' fatigue and to make job management manuals.
In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.22
no.2
/
pp.164-173
/
2012
Objectives: Epichlorohydrin is a material that has been predicted to have high volatility and strong toxicity and is used normally in working area. Therefore, the hazardous and dangerous level and the foreign management system about epichlorohydrin should be invested at home and abroad and through hazard assessment for occupational environment measurement and exposure status of industrial workers in domestic working area. Methods: To assess risk and to suggest Development and Adoption to prevent health damage of workers owing to the epichlorohydrin exposure, the hazardousness and dangerousness of epichlorohydrin and its practical examples and regulation level for domestic and abroad health impairment are researched on the base of various references. Results: The epichlorohydrin caused skin and mucus membrane irritation, respiratory paralysis, kidney and live damage under the influence of acute toxicity and in animal study, it was confirmed as a doubtful carcinogenic substance to trigger reducement of sperm number and reproduction ability, abnormal spermatogenesis, mutagen, increase of forestomach epithelium and occurrence of papilloma and so on, as well as it induced stimulus asthma and allergic contact dermatitis for exposure workers. Conclusions: Epichlorohydrin was found to occur allergic contact dermatitis, carcinogenesis doubt and reproduction toxicity and was verified as a material which would be established reinforcement of management level to care health of handlers, such as denotement dangerousness of skin absorption.
International conference on construction engineering and project management
/
2015.10a
/
pp.232-235
/
2015
Defect data contains experiential knowledge about specific work conditions. And the number of projects performed by a company is too limited for an individual to experience the various defects under the current complex construction environment. Therefore, in order to manage and prevent a reoccurrence of defects, a proper data feedback mechanism is required. However, most defect data are stored in unstructured ways, resulting in the fundamental problem of data utilization. In this paper, a new framework is proposed by using linked data technologies to improve defect data utilization. The target of this framework is to convert defect data to the ontology-based linked data format for sharing defect data from different data sources. To demonstrate it, some technical solutions are implemented by using real cases. The proposed approach can reduce data search time and improve the accuracy of search results as well. Moreover, the proposed approach can be applied to other domains that need to refer to external sources such as safety, specification, product, and regulation.
This study was carried out to establish the database system by using the safety inspection and in-depth inspection results for infrastructures such as bridges, tunnels, dams, and water supplies. A classification system of each facility was proposed by standardizing items for inspection & diagnosis in order to automatize work process. Also, it justifies data structure based on database from pre-investigation to field survey, evaluation of facilities, and report making. In addition to this, it suggests improvement plans of relative regulations and guidelines such as Facility Management System(FMS), operational regulation, and inspection detailed guideline to make inspection result database of infrastructures which can be used effectively.
According to 'The Analysis of Industrial Accidents in 2016' by Ministry of Employment and Labor, the number of deaths caused by accidents in the construction field is 391, accounting for 47% of 826 industrial fatalities in all industries. The breakdown of the 391 fatalities of the construction industry shows that 'struck by an object' accident had 30 fatalities, the 3rd in frequency following falling (235) and crashing (32) accidents. This study aims to explore ways to reduce the 'struck by an object' accident with emphasis on safety education and certificate system for rigging and slinging works. This study reviews literature on rigging and slinging works and analyzes 'struck by an object' accidents. The rules and regulation on the rigging and slinging works are also reviewed both for Korea and other countries with best practices in construction safety such as Singapore, Japan, U.K., and U.S. The rigging and slinging certificate systems of those countries are also reviewed to find any advantage in the construction safety management. In addition, a pilot rigging and slinging certificate system was executed in one of domestic construction site followed by two surveys: one on the riggers who participated in the pilot operation and the other on general managers in domestic construction sites. Based on the analysis of the 'struck by an object' accidents and pilot operation, this study proposes a rigging and slinging certificate system to reduce accidents, enhancing safety condition of construction sites. The certificate system was proposed in a way to accommodate working practice of construction sites. Depending on rigging careers and a crane load capacity, riggers are eligible to apply either basic or master certificate which makes difference in the level of rigging works. The safety condition of rigging and slinging work could be substantially enhanced if workers, managers, supervisors, administrators, and policy makers work together consistently.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.