• Title/Summary/Keyword: Safety hook

Search Result 38, Processing Time 0.021 seconds

Magnetic Field Simulation and Analysis for Monitoring Safety Hook Fastening (안전고리 체결 감지를 위한 자기장 시뮬레이션 및 분석)

  • Lee, Hoo-Sung;Heo, Jun;Park, Yong-Bae
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.15 no.6
    • /
    • pp.1169-1174
    • /
    • 2020
  • In this paper, in order to prevent a fall accident that occurs while working without fastening the safety hook at a construction site, a method to detect whether the safety hook is fastened using two coils is proposed. Ansys' Maxwell, an electromagnetic wave analysis simulator, was used to analyze the magnetic field before and after the safety hook fastening, and the possibility of confirming the fastening of the safety hook using the difference in the mutual inductance change and the resulting current induced in the receiving coil was shown.

Product Design and Manufacture on Safety Hook and X-jog for application in Hoist and Crane (호이스트 및 크레인에 적용 가능한 안전후크와 X-jog 제품 설계 및 제작)

  • Na, Hyun-Ho;Kim, Do-Jung;Choi, Ju-Seok;Oh, Woo-Jun;Park, Jae-Woong;Lee, Chon-Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.1
    • /
    • pp.91-96
    • /
    • 2015
  • In this study, we performed a study on prevention of the escape hoist heavy objects on the basis of the case of a disaster occurring during crane operations. A safety hook of the automatic fastening and coupling method by the conventional coupling method, the weight of the outside consisting of a combination of a safety ring structure was designed and manufactured. The main mechanism three-dimensional detail design and structural analysis confirmed the structure and stability of small strain than the allowable stress of the Safety Hook with X-jog through. Safety factor was confirmed to represent the average 1.5 to 1.2 higher than the safety factor to be considered in the general design structure. Therefore, Safety Hook and X-jog in the present study is to be operated upon structural stability is a structure attached to the hoist and crane are considered sufficient.

Influence of Semi-active Suspension on Running Safety of Vehicles

  • Liu, Hong-You;Yu, Da-Lian
    • International Journal of Railway
    • /
    • v.3 no.2
    • /
    • pp.68-72
    • /
    • 2010
  • Railway vehicles equipped with semi-active suspension system can improve the ride quality of car bodies. Semi-active suspension system is usually applied onto high speed train, and therefore higher running safety requirement is desirable. The influence of semi-active suspension system on safety of vehicles running on straight line and curve line is studied, and the influences of sky hook damping coefficient and system time-delay on operational safety of cars fitted with semiactive suspension system is analyzed. The results show that in vehicles equipped with semi-active suspension system, while the vibration of car body is decreased, the running safety of cars is not affected to any significant degree. As a result, the ride quality is much improved with negligible deterioration of the running safety of cars.

  • PDF

Influence of Semi-Active Suspension on Running Safety of Vehicles

  • Liu, Hong-You;Yu, Da-Lian
    • International Journal of Railway
    • /
    • v.2 no.4
    • /
    • pp.147-151
    • /
    • 2009
  • Railway vehicles equipped with semi-active suspension system can improve the ride quality of car bodies. Semi-active suspension system is usually applied onto high speed train, and therefore higher running safety requirement is proposed. The influence of semi-active suspension system on safety of vehicles running on straight line and curve line is studied, and the influences of sky hook damping coefficient and system time-delay on operation safety of cars fitted with semiactive suspension system is analyzed. The results show that the vehicles equipped with semi-active suspension system, not only the vibration of car body is decreased, it can also give little influence on running safety of cars, as a result, it will not endanger the running safety of cars.

  • PDF

Assessment of Bicycle Left-turn Traffic Control Strategies at Signalized Intersections (신호교차로의 자전거 좌회전 운영방안 평가에 관한 연구)

  • Lee, Chung Min;Lee, Sang Soo;Cho, Hanseon;Nam, Doohee
    • Journal of Korean Society of Transportation
    • /
    • v.32 no.6
    • /
    • pp.579-588
    • /
    • 2014
  • In this study, three signal control strategies such as Bike box, Hook-turn, and 6-phase were assessed for various traffic conditions at signalized intersections incorporating bicycle left-turn traffic. Results showed that the size of a waiting zone mainly affected the performance of signal control in both Bike box and Hook-turn. Both Bike box and Hook-turn yielded an identical vehicle delay, but Bike box produced less bicycle delay than Hook-turn by 2.5~29.9 sec/veh for undersaturated traffic conditions. For saturated traffic condition, Bike box produced less vehicle delay than Hook-turn and 6-phase strategies, but bicycle delay was found to increase at the 700 vph of bicycle traffic compared to 6-phase. Bicycle delay was greatly increased under Hook-turn and Bike box strategies when bicycle traffic was greater than 300 vph and 500 vph, respectively. It was also shown that bicycle delay could be significantly reduced by providing appropriate size of queueing space. In addition, Bike box was likely to yield less vehicle and bicycle delay than Hook-turn for traffic volume patterns investigated in this study.

A Case Study on Engineering Failure Analysis of Link Chain

  • Kim, Tae-Gu;Lee, Seong-Beom;Lee, Hong-Chul
    • Safety and Health at Work
    • /
    • v.1 no.1
    • /
    • pp.43-50
    • /
    • 2010
  • Objectives: The objective of this study was to investigate the effect of chain installation condition on stress distribution that could eventually cause disastrous failure from sudden deformation and geometric rupture. Methods: Fractographic method used for the failed chain indicates that over-stress was considered as the root cause of failure. 3D modeling and finite element analysis for the chain, used in a crane hook, were performed with a three-dimensional interactive application program, CATIA, commercial finite element analysis and computational fluid dynamic software, ANSYS. Results: The results showed that the state of stress was changed depending on the initial position of the chain that was installed in the hook. Especially, the magnitude of the stress was strongly affected by the bending forces, which are 2.5 times greater (under the simulation condition currently investigated) than that from the plain tensile load. Also, it was noted that the change of load state is strongly related to the failure of parts. The chain can hold an ultimate load of about 8 tons with only the tensile load acting on it. Conclusion: The conclusions of this research clearly showed that a reduction of the loss from similar incidents can be achieved when an operator properly handles the installation of the chain.

CCD방법을 기초로 한 headed reinforcement bar의 거동 연구

  • 임원석;김용곤
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2001.11a
    • /
    • pp.209-212
    • /
    • 2001
  • 현재 설계법에서는 최대인장력이 작용되는 지점에서부터의 정착길이(development length)나 갈고리(hook)를 통해 철근과 콘크리트의 거동을 확보하지만, 갈고리나 정착길이를 확보하기 위하여 어려움을 겪고 있다. 특히, 주근의 갈고리 정착으로 인하여 과밀 배근으로 콘크리트의 충진성을 저하시킨다.(중략)

  • PDF

The Evaluation of Stability for Hook-type Bonding Method of Pile Foundation and Cap (훅타입 말뚝두부보강 기초의 안정성 평가)

  • Lee, Heunggil;Oh, Sewook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.8 no.3
    • /
    • pp.41-49
    • /
    • 2007
  • The typical bonding methods which connect steel pipe pile and spread footing is bolted bonding method using +type cover plate for reinforcing a head of steel pipe pile. In this paper, stability of spread footing in pile foundation have been evaluated by loading test of +type cover plate for reinforcing a head of pile and hook type bonding method. The presents results from a series of pilot model test on vertically loaded piles foundation of bolted bonding method and hook type bonding method, pile foundation is identified to safety due to pile foundation exceed 8.5~21% which more than yield stress of steel pipe pile. As the results of horizontal loading tests, peak load of piles foundation of hook type bonding method has estimated in 41.1tonf and it was exceed about 33% which more than pile foundation of bolted bonding method.

  • PDF