The Evaluation of Stability for Hook-type Bonding Method of Pile Foundation and Cap

훅타입 말뚝두부보강 기초의 안정성 평가

  • Received : 2007.03.15
  • Accepted : 2007.05.11
  • Published : 2007.06.01

Abstract

The typical bonding methods which connect steel pipe pile and spread footing is bolted bonding method using +type cover plate for reinforcing a head of steel pipe pile. In this paper, stability of spread footing in pile foundation have been evaluated by loading test of +type cover plate for reinforcing a head of pile and hook type bonding method. The presents results from a series of pilot model test on vertically loaded piles foundation of bolted bonding method and hook type bonding method, pile foundation is identified to safety due to pile foundation exceed 8.5~21% which more than yield stress of steel pipe pile. As the results of horizontal loading tests, peak load of piles foundation of hook type bonding method has estimated in 41.1tonf and it was exceed about 33% which more than pile foundation of bolted bonding method.

강관말뚝과 확대기초를 연결하는 대표적인 두부보강공법은 +자 보강 덮개판을 이용한 볼트식 말뚝두부 보강방법이다. 본 논문에서는 실물 크기의 +자 보강 덮개판을 이용한 말뚝머리 보강방법과 훅타입의 새로운 말뚝 두부보강공법을 적용한 실물크기의 확대기초를 제작하여 연직재하시험과 수평재하시험을 수행하여 말뚝두부 결합부의 안정성을 평가하였다. 실물모형 기초의 연직재하 시험결과 볼트타입 및 훅타입으로 보강된 말뚝기초는 강관말뚝 재료의 항복내력을 8.5~21% 초과하는 것으로 나타나 압축력에 대해 충분한 안전성을 확보하고 있는 것으로 확인되었다. 수평재하 시험결과 훅타입 두부보강장치의 최대 파괴하중은 41.1tonf으로 볼트타입 두부보강 시험체에 비해 약 33%정도 크게 나타났다.

Keywords