• 제목/요약/키워드: Safety Step System

Search Result 412, Processing Time 0.025 seconds

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

Durability Evaluation of Platform Safety Step System (승강장 안전발판 시스템의 내구성 평가)

  • Park, Min Heung;Kwak, Hee Man;Kim, Min Ho
    • Journal of Applied Reliability
    • /
    • v.16 no.2
    • /
    • pp.125-133
    • /
    • 2016
  • Purpose: The purpose of this study is to evaluate durability of platform safety step system in railway. Method: We performed finite element analysis & durability analysis of platform safety step system with VPD (Virtual Product Development) techniques and examined the durability standard & qualification life through the rig test during no failure test time in reliability qualification test. We continued to test 1 million cycles in KRS (Korea Railway Standard) for system's robust design performance. Result: FEM analysis results are 14.9MPa & 14.7MPa of pin-joint, pivot and durability analysis result is above 1 million cycles. we calculated theoretically no failure test time 855,000 cycles and through the 1 million cycles durability rig test in KRS standard we confirmed product quality. Conclusion: This platform safety step system was designed very safe in terms of a mechanical strength & durability.

Study on Measurement Error Reduction Technique when Measuring Touch and Step Voltage of Grounding System (접지시스템의 접촉전압 및 보폭전압 측정오차 감소 기법에 관한 연구)

  • Kim, Dong-Woo;Lim, Young-Bea;Lee, Sang-Ick;Choi, Myeong-Il;Moon, Hyun-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.188-195
    • /
    • 2015
  • This paper presents measurement error reduction technique of touch and step voltage of grounding system based on numerical analysis. When measuring touch and step voltage of grounding system, auxiliary current probes should be located at suitable places. However, the auxiliary probes can not be located at suitable places in such cases as there are buildings and pavements. Therefore, in this paper, we provided measurement error reduction technique of touch and step voltage of grounding system according to the positions of auxiliary probes and angle between auxiliary probes. Also, measurement error analyses of touch and step voltage of grounding system have been conducted using more than one current probe. Based on these analyses, recommended positions of auxiliary probes within allowable measurement errors were presented.

Design of Vender Selecting System Application to Expert System (전문가 시스템을 응용한 외주 업체 선정 시스템 설계)

  • Kim, Young-Min
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.4
    • /
    • pp.181-193
    • /
    • 2006
  • The purpose of this thesis addresses a development of an expert system to support a decision making of the vender selection. The researches related to the vender selection problems have been studied and they provide 23 criteria to select proper venders. In this thesis, 8 criteria have been used to construct a knowledge base of the expert system. The system in this thesis consists of 6 steps in its procedure. Step 1 decides a specification that satisfies customer's needs and Step 2 chooses a part supplied by a vender. The type of an outside order is decided in Step 3 and some venders satisfying the customer's needs are selected in Step 4. Some of the venders chosen from step 4 which do not satisfy the fatal cirteria(that is Quality, Delivery, Price) can be deleted in Step 5. In the last step, 8 cirteria is used to select 3 venders according to their ranking. Consequently, this program provides for a man, who does not have the experiances, an efficient way to select appropriate venders in the vender selection problems.

A Study on Safety Step for Advanced Electric Multiple Unit (차세대전동차 안전스텝 개발에 관한 연구)

  • Joung, Eui-Jin;Kim, Gid-Dong;Lee, Ki-Yeol;Lim, Bong-Che;Park, Sang-Kyu;Lee, Weon-Dae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.475-480
    • /
    • 2010
  • The safety step has been developed to ensure the passengers' safety including the disabled and the weak by eliminating gap between vehicle and platform. The type of safety step is divided according to the position that the safety step is installed. The type of safety step attached platform is the rubber type that is previously attached to a platform. The installed rubber can reduces the gap between vehicle and platform by a fixed distance. If the safety step is installed on the vehicle, it is possible to respond to the various platform typed such as straight or curved form. It is also flexible to the height of riding depends on number of passenger and platform conditions and does not require crew's additional operation. We have been developed vehicle attached safety step for advanced electric multiple unit. We hope to increase the use of safety step for the disabled and the weak to expand the convenience use of railway transportation system.

  • PDF

A Study on the Reliability Analysis of Platform Safety Step System in Urban Railway (도시철도 승강장 안전발판 시스템 신뢰도 분석에 관한 연구)

  • Park, Min-Heung;Lee, Jeong-Hun;Kwak, Hee-Man;Kim, Min-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.3685-3691
    • /
    • 2015
  • We developed the platform safety step system for the passenger to avoid misstep accident and secure the pedestrian safety. In this study, we classify platform safety step system into hierarchy system and predict the failure rate of each part and calculate the failure rate & MTBF(Mean Time Between Failure) of each module(sub-system) by means of RBD(Reliability Block Diagram) & FTA(Fault Tree Analysis). Finally, we will propose the reliability analysis results for RAMS analysis of platform safety step system.

A Study on the Productivity Increment through Construction of Lean Production System for Automobile Plant in China (중국 자동차 공장의 린 생산 체계 구축을 통한 생산성 향상에 관한 연구)

  • Jang, Jung-Hwan;Zhang, Jing-Lun;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.117-122
    • /
    • 2012
  • This paper deals with the productivity increment through construction of lean production system for automobile factory in China. This lean production system has been progressed according to 5 steps. Step 1 is the work preparation. Step 2 is the process design. Step 3 is the establishment of method to count production quantity. Step 4 is the establishment of measuring method for input and output. Finally, step 5 is the construction of flexible production system able to adapt for environment change. This lean production system is expected to obtain the productivity increment by 50% for plastic plant and reduction by 50% in inventory quantity.

How to Use an Optimization-Based Method Capable of Balancing Safety, Reliability, and Weight in an Aircraft Design Process

  • Johansson, Cristina;Derelov, Micael;Olvander, Johan
    • Nuclear Engineering and Technology
    • /
    • v.49 no.2
    • /
    • pp.404-410
    • /
    • 2017
  • In order to help decision-makers in the early design phase to improve and make more cost-efficient system safety and reliability baselines of aircraft design concepts, a method (Multi-objective Optimization for Safety and Reliability Trade-off) that is able to handle trade-offs such as system safety, system reliability, and other characteristics, for instance weight and cost, is used. Multi-objective Optimization for Safety and Reliability Trade-off has been developed and implemented at SAAB Aeronautics. The aim of this paper is to demonstrate how the implemented method might work to aid the selection of optimal design alternatives. The method is a three-step method: step 1 involves the modelling of each considered target, step 2 is optimization, and step 3 is the visualization and selection of results (results processing). The analysis is performed within Architecture Design and Preliminary Design steps, according to the company's Product Development Process. The lessons learned regarding the use of the implemented trade-off method in the three cases are presented. The results are a handful of solutions, a basis to aid in the selection of a design alternative. While the implementation of the trade-off method is performed for companies, there is nothing to prevent adapting this method, with minimal modifications, for use in other industrial applications.

Hazard and Operability Method of the LP Mud System (LP Mud System에 대한 위험과 운전분석 방안)

  • Lee, Sang-Mok;Kim, Nam-Ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.404-406
    • /
    • 2016
  • Due to the localization process of offshore drilling system, ensuring safety has emerged as an important. Therefore, step by stem safety analysis about each development process of offshore drilling system is becoming compulsory. Hazard and operability analysis is a method that was successfully used for system safety analysis in industries such as chemical plants. Through this hazard and operability analysis study, to conduct step by step safety analysis accorsing to process, the study conducted hazard and operability analysis in Lp mud system, an area of offshore drilling system.

  • PDF

A study on the safety improvement and productivity's increase through continuous preventive maintenance (지속적 계획보전을 통한 생산성 향상 및 안전개선에 대한 연구)

  • Yang Doo Jin;Lee Chang Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.101-115
    • /
    • 2005
  • This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.