• 제목/요약/키워드: Safety Management Evaluation System

검색결과 660건 처리시간 0.027초

설계 안전성 검토 결과를 활용한 시공단계 안전관리 업무 개선 - 설계 안전성 검토와 안전관리계획의 연계를 중심으로 (A Study on the Improvement of Safety Management at the Construction Stage using Design for Safety Results - Focusing on the Connection between Design for Safety and Safety Management Plan)

  • 이군재
    • 한국안전학회지
    • /
    • 제35권6호
    • /
    • pp.54-60
    • /
    • 2020
  • Recently, the issue of construction safety is growing. In the construction industry, accidents have continued to increase since 2000. In particular, the number of accident deaths at small and medium-sized construction sites accounts for 72.11% of the total number of accident deaths in the construction industry. For construction safety, prior safety evaluation systems such as Design for safety and safety management plan preparation are in place. However, at construction sites, these systems are recognized as formal legal documents, and their effectiveness is greatly reduced. Therefore, in this study, a linkage model that links design safety review information and safety management plan information was presented so that the safety management plan can be efficiently established. In addition, the effectiveness of the proposed process was verified as an example of actual work. The linkage model will contribute to improving the safety management environment at the site by increasing the productivity of safety management work by enabling easy sharing of risk factor information in the construction stage safety management work. The results of this study will be used as basic information for the development of the integrated safety management system.

철도사고 위험분류 및 원인분석에 관한 연구 (A Study on the Analysis and Classification of Types and Causes of Railway Accidents)

  • 박찬우;박주남;왕종배;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.599-604
    • /
    • 2005
  • As a public transportation possible to convey a large quantity, the railway is safe and keeps time, but it has hazards to cause a disaster if the accidents such as collision, derailment, and fire occur. So advanced countries carry out System Safety Plan with various program activities which have connected orders to maintain or improve safety level by finding hazards, evaluation, taking measures and practice, and improving problems. Especially they systematically manage hazards to cause railway accidents and the factors which possibly threat safety, using national classification of risk and causes with analysis of the related data such as establishing accident/incident data and safety regulations/standards. As executing railway safety regulations, domestic railway is currently trying to improve railway safety management system. The research of classification system of accidents/incidents is one thing to make railway safety management systems better. In this research, we reviewed hazardous factors of railway systems and classification of the causes as the beginning of system safety management, and we conducted study on development of railway accident classification based on findings of this research. The results are able to be used in identifying hazards and activities of systemic safety management at the step of railway accident report and investigation.

  • PDF

공공공사의 입찰과정에서 안전평가체계와 요건의 비교분석 - 싱가포르, 일본 사례를 중심으로 - (A Comparative Analysis on Safety Evaluation System and Requirement in the Tendering Process of Public Construction Projects - Cases of Singapore and Japan -)

  • 박희택;오치돈;박찬식;최진우
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.130-139
    • /
    • 2013
  • 재해율은 건설산업의 재해를 예방하고 기업의 안전관리 활동을 촉진하기 위해 공공부문 건설공사의 PQ심사에 반영되고 있다. 그러나 건설산업의 재해율은 최근 다시 증가하고 있는 추세를 보이고 있으며, 이는 현재 재해율에 대한 평가가 재해예방에 큰 영향을 미치지 못했거나 한계에 달했음을 의미한다. 이에 본 연구는 입찰과정에서 안전관련 평가에 대한 강화의 필요성을 인식하고 싱가포르와 일본을 대상으로 낙찰자 선정 시 안전관련 평가항목 및 기준, 평가방법 등의 현황을 조사 분석하여 국내 공공부문 건설공사의 낙찰자 선정평가에 벤치마킹 할 수 있는 기초자료를 제공하기 위한 목적으로 수행되었다. 싱가포르와 일본은 법 제도적 측면의 평가, 안전성과 및 실적에 대한 평가, 해당 공사의 안전관리계획에 대한 평가 등 낙찰자 선정 시 다양한 측면에서 안전관련 내용을 평가하고 있다. 따라서, 국내 공공부문 건설공사에서도 낙찰자 선정 시 기업의 안전성과 및 실적, 당해 사업의 안전관리계획 등 종합적인 안전관련 내용을 평가함으로써 기업의 안전관리 활동을 촉진시킬 필요가 있다. 이를 통해 건설산업의 재해율을 감소시키고 안전의식수준을 향상시키며 나아가 건설산업 전체의 안전관리수준에 대한 발전을 유도할 수 있을 것으로 기대된다.

공급사슬관리 평가 모델 및 시뮬레이션 모델 구축에 관한 연구 (A Study on Supply Chain Management Evaluation Model and Simulation Model)

  • 이광수;양청만;이용진
    • 대한안전경영과학회지
    • /
    • 제17권2호
    • /
    • pp.191-199
    • /
    • 2015
  • Considering the supply system and operating cost of enterprises which are in the supply chain as the main index, this paper establishes a supply chain evaluation model, and utilizes Arena building stimulation model of the supply chain which considers manufacturing enterprises as the core of supply chain. This model designs a generic simulation model of the supply chain including multi-level distributors and suppliers. And the model analyzes a representative example of business process, one of the enterprises in Shandong.

환경 평가를 위한 QFD 시스템 적용에 관한 연구 (A Study on Application to Quality Function Deployment for Environment Evaluation)

  • 양광모;최성희;박재현;송수정
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2005년도 추계학술대회
    • /
    • pp.276-280
    • /
    • 2005
  • Industrial processes and operations can not be accomplished independently but are connected with each others through suppliers and customer, and these ideas are fundamental notions of Life Cycle Assessment(LCA). This paper will introduce Life Cycle Assessment(LCA) in environment which is rising, and would like to build environmental management system using approach of Quality Function Deployment(QFD) and Safety Function Deployment(SFD) belonging to the assessment method.

  • PDF

Development of Safety Balanced Scorecard

  • 양광모;송빛나
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2008년도 추계학술대회
    • /
    • pp.229-239
    • /
    • 2008
  • This study aims to suggest a performance measurement model reflecting the characteristics of safety evaluation system, especially the model for return manufacturing related to safety, and to develop the S-BSC(Safety-Balanced ScoreCard) measurement model using a weight lifetime value to which a relative weight is applied by using AHP based on the BSC.

  • PDF

재해 감소를 위한 작업 실수 방지에 대한 5M 요인 평가 연구 (A Study on 5M Factor Evaluation about Work Blunder Preventive for Decreasing calamity)

  • 양광모
    • 대한안전경영과학회지
    • /
    • 제8권5호
    • /
    • pp.85-97
    • /
    • 2006
  • If done under this circumstances, then labor force can work comfortably and safely without nervousness and tiresome. The productivity and quality can increase ultimately and even foreign labor, imbecile child, old-aged labor can participate in work, which can reduce shortage of labor source. Therefore, in this study, it would be researched how to manage work blunder system by domestic small and medium enterprises and would be examined work blunder system was developed to fully meet the worker satisfaction. Through this 5M factor evaluation system by AHP(Analytic Hierarchy Process) all analyzed.

조선업 사업장의 안전관리 시스템 구축에 관한 연구 (A Study on Safety Management System for Shipbuilding Industry)

  • 최정우;유진환;김현준;서재민;김성빈;윤기봉
    • 한국안전학회지
    • /
    • 제23권6호
    • /
    • pp.14-20
    • /
    • 2008
  • A large number of accidents have been occurred in the domestic shipbuilding industry. Its number of accidents is approximately twice than that of manufacturing industry and three times larger than that of whole industry in general. There are several reasons that make it hard to control the accidents. First, it is because the shipbuilding industry is composed of many subcontractors who may need improvement in safety education and safety management. Second, the shipyard environments are exposed to lots of hazards such as high elevation works, isolated workspaces, heavyweight and huge structures/components. Last, the shipbuilding industry has grown too rapidly in a short period. For that reason, the safety management standards and safety consciousness could not catch up the speed of its development. In this study, it is suggested to use a more efficient and easier way to conduct safety management using a web-based safety management system for the shipbuilding industry. This system is composed of four main parts, which is available for self-auditing with legal support. Those are checklists based safety and health evaluation, safety inspection, user shared accident database and user shared bulletin board. It is expected that this system can help us to reduce risks in the shipbuilding industry considerably.

중소기업에서 생산시간 감소를 위한 생산시스템 설계에 관한 연구 (A Study on Design of Production System for reducing Production Time in the Small and Medium Business)

  • 조석호;양광모;서장훈;강경식
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 추계학술대회
    • /
    • pp.203-206
    • /
    • 2003
  • Each method for economic evaluation has its own characteristics. Therefore adoption of each of them in evaluation production investment project results in many problems. Hence combination & modification of them are required to perform more accurate evaluation about investment project. This paper discuss evaluation method of investment projects expansion and replacement investment on each line or individual in the production. Generally investment evaluation method has add to a few method by Subsidiary means with use a especial method. And then in this paper, a Taguchi Techniques is presented, which may be effective to the facilities appraisal or improvement. We propose a decision model to incorporates the values assigned by a group of experts on different factors in production. Using this model, SN ratio of taguchi method for each of subjective factors as well as values of weights are used in this comprehensive method for reducing production rate in production management.

  • PDF

택배시스템에 있어서 철도운송의 이용 가능성 평가 (The evaluation for availability of railway transportation in home delivery service system)

  • 김상직;주용준
    • 대한안전경영과학회지
    • /
    • 제2권3호
    • /
    • pp.61-79
    • /
    • 2000
  • It is very important to delivery timely and safely items in logistics. So, the home delivery service system is introduced by many enterprises. Also, the beginning in 1990's, the rapid increase of automobile increased logistics cost and led to road stagnation. So, the railway transportation use in logistics can be considered. The railway transportation in home delivery service system can overcome the limit of transportation by land. This study evaluate railway transportation in home delivery service system by economical efficiency and timeliness.

  • PDF