• Title/Summary/Keyword: Safety Management Basic Plan

Search Result 134, Processing Time 0.023 seconds

A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten (도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로)

  • Oh, Se-kil;Park, Joo-Moon
    • Journal of Urban Science
    • /
    • v.8 no.1
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.

A Study on Energy Saving and Safety Improvement through IoT Sensor Monitoring in Smart Factory (스마트공장의 IoT 센서 모니터링을 통한 에너지절감 및 안전성 향상 연구)

  • Woohyoung Choi;Incheol Kang;Changsoo Kim
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.117-127
    • /
    • 2024
  • Purpose: The purpose is to conduct basic research to save energy and improve the safety of manufacturing plant infrastructure by comprehensively monitoring energy management, temperature, humidity, dust and gas, air quality, and machine operation status in small and medium-sized manufacturing plants. Method: To this end, energy-related data and environmental information were collected in real time through digital power meters and IoT sensors, and research was conducted to disseminate and respond to situations for energy saving through monitoring and analysis based on the collected information. Result: We presented an application plan that takes into account energy management, cost reduction, and safety improvement, which are key indicators of ESG management activities. Conclusion: This study utilized various sensor devices and related devices in a smart factory as a practical case study in a company. Based on the information collected through research, a basic system for energy saving and safety improvement was presented.

A Study on the Development of Simulation Model for Inchon Port (인천내항을 위한 시뮬레이션 모델 개발)

  • 김동희;김봉선;이창호
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2000.05a
    • /
    • pp.339-349
    • /
    • 2000
  • Inchon Port is the second largest import-export port of Korea, and has the point at issue such as the excessive logistics cost because of the limits of handling capacity and the chronic demurrage. There are few research activities on the analysis and improvement of the whole port operation, because Inchon Port not only has the dual dock system and various facilities but also handles a various kind of cargo. The purpose of this paper is to develop the simulation program as a long-term strategic support tool, considering the dual dock system and the TU(Terminal Operation Company) system executed since March, 1997 in Inchon Port. The basic input parameters such as arrival intervals, cargo tons, service rates are analyzed and the probability density functions for these parameters are estimated. The main mechanism of simulation model is the discrete event-driven simulation and the next-event time advancing. The program is executed based on the knowledge base and database. From the simulation model, it is possible to estimate the demurrage status through analyzing various scenarios and to establish the long-term port strategic plan.

  • PDF

A Study on the Development of Simulation Model for Inchon Port (인천내항을 위한 시뮬레이션 모델 개발)

  • 김동희;김봉선;이창호
    • Journal of the Korea Safety Management & Science
    • /
    • v.2 no.2
    • /
    • pp.127-137
    • /
    • 2000
  • Inchon Port is the second largest import-export port of Korea, and has the point at issue such as the excessive logistics cost because of the limits of handling capacity and the chronic demurrage. The purpose of this paper is to develop the simulation program as a long-term strategic support tool, considering the dual dock system and the TOC(Terminal Operation Company) system executed since March, 1997 in Inchon Port. The basic input parameters such as arrival intervals, cargo tons, service rates are analyzed and the probability density functions for these parameters are estimated. From the simulation model, it is possible to estimate the demurrage status through analyzing various scenarios and to establish the long-term port strategic plan.

  • PDF

A Study on the Effectiveness of the 4th Industrial Technology Application for School Building Construction Work (학교건물 시공을 위한 4차 산업기술 적용의 효과성에 대한 연구)

  • Min, Kyung-Suk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.19 no.4
    • /
    • pp.78-87
    • /
    • 2020
  • This study proposed the basic data that contributes to inducing an effective construction plan through the application of the 4th industrial technology to construct a school building that can guarantee the five goals of construction management: cost, process, quality, safety, and environmental management. To this end, 3D printing, drones, robot automation, and augmented reality technologies that are highly usable in construction sites were identified for construction workers. As part of this, related literature and research data were investigated. The selected 4th industrial technology was investigated and analyzed on how it was used for cost, process, quality, safety, and environmental management in a detailed school construction process. As a result of the analysis, significant results were found for the application plan of the 4th industrial technology in school construction for cost, process, quality, safety, and environmental management.

A Study on the Methods for Usage of Environmental Indexes in Management by Objectives (목표관리에서 환경지표의 활용방법에 관한 연구)

  • Lim, Mann-Taek;Joo, Seung-Ho;Yoon, Kyung-Sup;Kwon, Chang-Yong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.199-208
    • /
    • 2011
  • Environment standards can be used as a foundation of environment administration (specific expression of political goals or quantitative evaluation standards of political effects). When environment adminstration improves severe air or water pollution rapidly, the environment standard can work effectively to show the goals specifically and clearly. The environment index which is designed to evaluate environment systems, should be established to express the environment system generally. To realize sustainable development, the sustainable indexes usually consisting of these three areas in that harmony of environment, economy and society are required. In this research, sustainable environmental indicators to understand the characteristics and to compare likes theme of environmental conditions in international and national level indicators, regional environmental management plan to promote the management by objectives are to provide the basic data. It is desirable for the environmental policies to work harmoniously with direct control, use of economic means and voluntary methods. Regarding the evaluation of environmental index, the action results of civilian's or individual's activities are needed to be reflected into the evaluation.

A Study on Industrial Accident Cases by an Application of Correlation Analysis (상관분석을 응용한 산업재해 사례요인의 고찰)

  • 정국삼;홍광수
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.1
    • /
    • pp.141-149
    • /
    • 1999
  • At present time, industrial accidents statistics are used as the basic data of the policy to prevent industrial accidents and the plan to applicate the industrial accident insurance. But this statistical data is not sufficient for the effective safety management because it is the expression of the itemized distribution and the frequency for the whole cases. This study tried to correlational analysis for each causes by defining investigational items as their accident parameters. The correlational analysis, between the unsafe action and status and their relational causes, was performed to analyze the occurrence causes of industrial accident. And to assume the severity of accident, the correlativity and independency between causes and direct causes which are defined hospital days subordinate parameter were analyzed. In addition, this study expressed numerically the effectiveness of subordinate parameters depended on the level of independent parameter by presenting the predictive model between dependent parameter and independent parameter, which have the categorical parameter, through the Logit analysis method.

  • PDF

A Study on the Method of Creating a Safety Vulnerable Class Distribution Diagram for Non-Structural Countermeasures in the Comprehensive Natural Disaster Reduction Plan (자연재해저감종합계획 비구조적 대책의 안전취약계층도 작성방안에 관한 연구)

  • Doo Hee Kim;In Jae Song;Byung-Sik Kim
    • Journal of Korean Society of Disaster and Security
    • /
    • v.16 no.1
    • /
    • pp.1-11
    • /
    • 2023
  • The comprehensive natural disaster reduction plan, the highest plan in the disaster prevention field, was implemented by local governments. second plan is currently being formulated. In order to minimize human and property damage, structural and non-structural measures for each of the nine disaster types are established and implemented for 10 years. Structural measures are based on engineering and quantitative analysis, and the criteria for setting reduction measures are clear. Non-structural measures, however, currently lack the set criteria. the basic disaster and safety management law included the safety vulnerable class in 2018. Currently, the safety vulnerable class of the detailed establishment criteria of the comprehensive natural disaster reduction plan is being established, including children, the elderly, and the disabled. However, due to the lack of data securing and database construction by local governments, it is difficult to prepare a location map for establishing reduction measures for the safety vulnerable. Therefore, in this study, OPEN API data of the safety vulnerable class were collected and statistical information and GIS of SGIS information services were used. The distribution diagram of the safety vulnerable class in Samcheok, Gangwon-do, which is a sample area, and the distribution diagram of the safety vulnerable class in units of the output area (OA) in Geundeok-myeon were prepared.

Strengthening BCP for the Prevention of Infectious Diseases in Companies (기업의 감염병 예방을 위한 BCP 강화방안 연구)

  • Kim, Young-Kook;Jeong, Kyung-Ok;Yang, Kyung-Ah
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.3
    • /
    • pp.11-18
    • /
    • 2021
  • As the number of confirmed cases of Covid-19 is not decreasing, it is time for domestic companies to respond preemptively and in terms of business continuity. The purpose of this study is to present measures to strengthen BCP to prevent infectious diseases in the enterprise. In this work, three methods of data investigation are used. The first was to search for keywords in academic databases such as the National Assembly Library and the Korea Research and Information Service to investigate degree papers and academic papers. Second, we investigated literature such as research reports, manuals, and guidelines on infectious diseases. Finally, the researchers visited official websites such as KDCA, MOHW, and MOIS to collect and analyze recent data. BCP In view of the Board, a new risk analysis should be made and a disaster preparedness system tailored to the characteristics of the entity should be established. We need to analyze corporate weaknesses and focus on safety culture. It is also important to look at how customers choose their services and products. Based on this, differentiated service strategies should be presented. It is hoped that the results of this study can be used as basic data for companies that want to systematically manage and operate BCP to prevent infectious diseases.

A Study on the Probabilistic Risk Analysis for Safety Management in Construction Projects

  • Lee, Dong-Yeol;Kim, Dong-Eun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.8
    • /
    • pp.139-147
    • /
    • 2021
  • In this study, we proposed the possibility of reliability analysis of risk index by using Monte Carlo simulation as basic data of safety accident occurrence data and expert opinion by construction industry type. Through this, it is expected that risk index for safety accidents according to detailed types of works will be presented stochastically and it will be possible to predict the risk factors and the expected range of damage based on the reliability analysis in the construction safety management plan. It will also reduce many of the planning risks that are common to decision makers in the field of construction management. In identifying risks, road bridge construction was classified into earthworks, drainage works, and bridge construction, and possible safety accidents were classified based on expert data. The risk index was calculated for each detailed construction of road and bridge construction, drainage construction, and bridge construction.