• Title/Summary/Keyword: Safety Inspections

Search Result 239, Processing Time 0.025 seconds

A Study on Development of the Controlled Low-Strength and High-Flowable Filling Material and Application of the Backfilling in Cavities behind the Old Tunnel Lining (고유동 충전재의 개발과 노후 터널의 배면공동 뒤채움에 관한 연구)

  • Ma, Sang-Joon;Seo, Kyoung-Won;Bae, Gyu-Jin;Ahn, Sang-Cheol;Lim, Kyung-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.177-184
    • /
    • 2002
  • The most tunnel damage such as cracks or leakage which exist in tunnel lining commonly, is caused by the cavities where exist behind the tunnel lining, through the tunnel safety inspections. These cavities were analysed to affect a stability of a running-tunnel seriously. This study is on the development of the controlled low-strength and flowable filling material which is able to apply to the cavity behind the tunnel lining. The major materials of backfilling developed are a crushed sand and a stone-dust which exists as a cake-state and is a by-product obtained in the producting process of aggregate. It is conformed with the design standard to the physical characteristics of backfilling. The backfilling material developed is designed to reduce the fair amount of cement. According to the designed compound ratio, it is carried out the laboratory tests such as a compressive strength and a chemical analyses and is applied to dilapidated old tunnel for an application assessment.

A Plan to Ensure Safety of Electrical Installation in Empty Houses by Measuring Zero Phase Current (영상전류 측정을 이용한 부재수용가의 전기설비에 대한 안전확보 방안)

  • Lim, Young-Bae;Bae, Seok-Myung;Kim, Young-Seok;Park, Chee-Huyn;Kim, Gi-Hyun;Cho, Sung-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.55 no.4
    • /
    • pp.196-201
    • /
    • 2006
  • A electrical fault that may generate an electrical disaster is defined as any abnormal condition caused by reduction in the insulation strength. To find out the abnormal condition, periodical inspections have being performed every 3 years. Recently, the number of empty houses during normal working hours is rising by dramatic increase in the number of nuclear families and double income families. To define the potential risk of the electric installation, measurement of zero phase current has been being considered. But the measured value could not be adapted to an absolute reference to the installation because the measured zero phase current value also contained capacitive leakage current. Therefore, in this paper, the correlation between the condition of the electrical installation and the zero phase current was analyzed. The result focuses on to detect them in a cost efficient way.

A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete (투수콘크리트 현장품질관리 지침서 개발에 관한 연구)

  • Ko, Eun-Jung;Goh, Eun-Joo;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.

A Study on Development of Lightweight Foam Filling Material for the Voids behind Tunnel Liner using Stone-dust and Application to the Old Tunnel (석분을 이용한 터널 뒤채움용 경량기포 충전재의 개발과 현장적용에 대한 연구)

  • Ma, Sang-Joon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.139-147
    • /
    • 2003
  • The most tunnel damage such as cracks or leakage which exist in tunnel lining commonly, is caused by the voids where exist behind the tunnel lining, through the tunnel safety inspections. These voids were analysed to affect to a stability of a running-tunnel seriously. The aim of this paper is to develope the lightweight foam concrete for tunnel backfilling material using stone-dust of cake state and to apply the lightweight foam concrete developed to the old tunnel. This paper shows the basic properties of lightweight foam concrete mixed with stone-dust including flow rate, unit volume weight, absorption rate and compressive strength. In addition, according to the designed compound ratio, the lightweight foam concrete was applied to the ASSM tunnel for an application assessment. The engineering application of the lightweight foam concrete as the old tunnel's backfilling material was confirmed in this assessment.

A Study on the Fire Safety of High-rise Apartments Based on Fire Door Switch and Automatic Fire Extinguishing System

  • Zhang, ZeChen;Kong, Ha-Sung
    • International Journal of Advanced Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.424-430
    • /
    • 2021
  • The purpose of this study is to analyse the characteristics and spreading laws of parameters such as fire smoke, concentration of CO, visibility, and temperature at fire scene in high-rise residential buildings under the different conditions of fire doors and automatic fire extinguishing systems. Using Pyrosim to simulate diverse fire scenes in a high-rise apartment with corridors, to analyze the changes in those parameters. The results show that when a fire occurs, closing the fire-fighting corridor will increase the smoke temperature and concentration of CO in the stairwell, and reduce the height and visibility of the smoke layer; the automatic fire extinguishing system effectively suppresses the increase in the temperature of the fire smoke and the sedimentation of the smoke layer. Reasonable setting and operation of the automatic fire extinguishing system could effectively inhibit the spread of fire. Although closing fire corridor can slow down the direct upward spread of smoke through the corridor, it will force the fire smoke into the stairwell, which will seriously affect evacuation through the stairs. Therefore, in order to reduce risks, it is forbidden to close the fire doors of the firefighting corridor and stacking combustible materials in the corridor, Also, intensifying inspections and ensuring the normal operation of the automatic fire extinguishing system are indispensable. Based on the research results, the significance of installing fire-fighting facilities in the construction of high-rise apartments was discussed and proved.

BIM model-based structural damage localization using visual-inertial odometry

  • Junyeon Chung;Kiyoung Kim;Hoon Sohn
    • Smart Structures and Systems
    • /
    • v.31 no.6
    • /
    • pp.561-571
    • /
    • 2023
  • Ensuring the safety of a structure necessitates that repairs are carried out based on accurate inspections and records of damage information. Traditional methods of recording damage rely on individual paper-based documents, making it challenging for inspectors to accurately record damage locations and track chronological changes. Recent research has suggested the adoption of building information modeling (BIM) to record detailed damage information; however, localizing damages on a BIM model can be time-consuming. To overcome this limitation, this study proposes a method to automatically localize damages on a BIM model in real-time, utilizing consecutive images and measurements from an inertial measurement unit in close proximity to damages. The proposed method employs a visual-inertial odometry algorithm to estimate the camera pose, detect damages, and compute the damage location in the coordinate of a prebuilt BIM model. The feasibility and effectiveness of the proposed method were validated through an experiment conducted on a campus building. Results revealed that the proposed method successfully localized damages on the BIM model in real-time, with a root mean square error of 6.6 cm.

Analysis of Appropriateness for Maintenance of Aged Small Bridges based on Condition and Load Carrying Capacity Evaluation (상태평가와 내하성능평가를 통한 소규모 노후교량의 유지관리 적정성 분석)

  • Lee, Huseok;Roh, Hwasung;Sun, Jong-Wan;Park, Kyung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.59-66
    • /
    • 2019
  • Small bridges carry out only general inspections based on visual inspection. The Bridges with more than 30 years of public use need to be decided on whether or not they will be reconstruction according to aging. However, there are some situations that need to be determined only by appearance condition, which is insufficient in terms of safety maintenance. In this paper, the condition evaluation and the load carrying capacity evaluation were carried out for aged small bridges. A comparison of the evaluation results was conducted to examine the appropriateness of the maintenance related to the decision making of the reconstruction. As a result of reviewing, two of the bridges showed that there are no abnormality in the safety of the state evaluation, but the load capacity were insufficient. Thus evaluation the safety and performing the reconstruction decision of aged small bridges by visual inspection alone with may cause problems. Therefore, it is necessary to carry out additional research on the ambient measurement and load carrying capacity evaluation for the maintenance of the bridges, and to supplement it through application of the bridge management system.

Resolution Method of Hazard Factor for Life Safety in Rental Housing Complex (임대주택단지의 생활안전 위해요인 해소방안)

  • Sohn, Jeong-Rak;Cho, Gun-Hee;Kim, Jin-Won;Song, Sang-Hoon
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • The government has been constructing and supplying public rental housing to ordinary people in order to stabilize housing since 1989. However, the public rental houses initially supplied to ordinary people are at high risk for safety accidents due to the deterioration of the facilities. Therefore, this study is aimed to propose a solution to solve the life safety hazards of the old rental housing complex as a follow-up study of Analysis of Accident Patterns and Hazard Factor for Life Safety in Rental Housing Complex. Types of life safety accidents that occur in public rental housing complexes are sliding, falling, crash, falling objects, breakage, fire accidents, traffic accidents and criminal accidents. The types of safety accidents that occur in rental housing complexes analyzed in this study are sliding, crashes, falling objects, and fire accidents. Although the incidence of safety accidents such as falling, breakage, traffic accidents and crime accidents in public rental housing complexes is low, these types are likely to cause safety accidents. The method of this study utilized interviews and seminar results, and it suggested ways to solve the life safety hazards in rental housing complexes. Interviews were conducted with residents and managers of rental housing complexes. Seminars were conducted twice with experts in construction, maintenance, asset management, housing welfare and safety. Through interviews and seminars, this study categorizes the life safety hazards that occur in rental housing complexes by types of accidents and suggests ways to resolve them as follows. (1) sliding ; use of flooring materials with high friction coefficient, installation of safety devices such as safety handles, implementation of maintenance, safety inspections and safety education, etc. (2) falling ; supplementation of safety facilities, Improvement of the design method of the falling parts, Safety education, etc. (3) crash ; increase the effective width of the elevator door, increase the effective width of the lamp, improve the lamp type (U type ${\rightarrow}$ I type), etc. (4) falling objects and breakage ; design of furniture considering the usability of residents, replacement of old facilities, enhancement of safety consciousness of residents, safety education, etc. (5) fire accidents ; installation of fire safety equipment, improvement by emergency evacuation, safety inspection and safety education, etc. (6) traffic accidents ; securing parking spaces, installing safety facilities, conducting safety education, etc. (7) criminal accidents; improvement of CCTV pixels, installation of street lights, removal of blind spots in the complex, securing of security, etc. The roles of suppliers, administrators and users of public rental housing proposed in this study are summarized as follows. Suppliers of rental housing should take into consideration the risk factors that may arise not only in the design and construction but also in the maintenance phase and should consider the possibility of easily repairing old facilities considering the life cycle of rental housing. Next, Administrators of rental housing should consider the safety of the users of the rental housing, conduct safety checks from time to time, and immediately remove any hazardous elements within the apartment complex. Finally, the users of the rental housing needs to form a sense of ownership of all the facilities in the rental housing complex, and efforts should be made not to cause safety accidents caused by the user's carelessness. The results of this study can provide the necessary information to enable residents of rental housing complexes to live a safe and comfortable residential life. It is also expected that this information will be used to reduce the incidence of safety accidents in rental housing complexes.

Research on the Ammunition Automatic Test Algorithm for Improving Safety & Reliability of 40mm Grenade(K212) Fuze (40mm 고속유탄(K212) 신관의 안전성 및 신뢰성 강화를 위한 탄약 자동화검사 알고리즘에 관한 연구)

  • Ju, Jin-Chun;Kweon, Mee-Sun;Kim, Sang-Min;Ahn, Nam-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.14-22
    • /
    • 2016
  • Because fuses have many parts, human error can occur during visual inspections. This paper proposes an automatic ammunition test algorithm for preventing human error during an inspection. The automatic ammunition test algorithm consists of the following three steps. First, the image input and preprocessing step is where an inspection image is rotated using an image rotation algorithm and the image is converted to a binary image. Second, the inspection step of arming determines if the ammunition is armed using Masked Template Matching algorithm, etc. Third, the inspection step of the parts determines if the parts are omitted using an image searching algorithm, etc. The arming or parts omission of the fuse are detected efficiently using the ammunition automatic test algorithm. The ammunition automatic test algorithm is expected to help improve the safety and reliability of 40 mm grenade fuse.

Extraction of Road Surface Freezing Section using GIS (GIS를 이용한 도로의 노면결빙구간 추출)

  • Choi, Byoung-Gil;Kim, Joong-Sik
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.4 s.34
    • /
    • pp.19-25
    • /
    • 2005
  • This study suggests a method for securing road safety by extracting the expected surface freezing section in planning a route using GIS. When planning a road construction in a mountainous area it is possible to confront surface freezing especially in the wintertime. In addition, it is required assessment data of surface freezing rates in the case of turnkey inspections of newly constructed or expanded roads. Consequently, an analysis method that can quantitatively estimate the surface freezing section and sunshine influence on each section of a road is needed. We can extract the expected surface freezing section which amounted to around 29km of the Donghae highway, with such techniques as three-dimensional modeling, sunshine simulation geographical database construction and spatial analysis using the overlay function of the GIS spatial analysis. This study can be used as a method to assess advance safety which has a direct influence on planning the blueprint that should be approved by a policy maker after efficiently understanding the expected surface freezing section in accordance with hill shade.

  • PDF