• Title/Summary/Keyword: ST(Steam Turbine)

Search Result 14, Processing Time 0.028 seconds

Performance Analysis of Hybrid SOFC/GT/ST System for Marine Power Applications (선박동력용 SOFC/GT/ST 하이브리드시스템의 성능 평가에 관한 시뮬레이션)

  • Lee, Kyung-Jin;Oh, Jin-Suk;Kim, Sun-Hee;Oh, Sae-Gin;Lim, Tae-Woo;Kim, Jong-Su;Lee, Jae-Hyun;Park, Sang-Kyun;Kim, Mann-Eung;Kim, Myoung-Hwan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.36 no.1
    • /
    • pp.40-50
    • /
    • 2012
  • The electrification of the waste heat of stack is necessary to enhance the efficiency of fuel cell system. For this purpose, the hybrid SOFC/GT/ST system is suitable. The purpose of this work is to predict the performance of methane fueled SOFC/GT/ST hybrid power system and to analyze the influence of operating temperature of stack, current density of stack, and gas turbine pressure ratio. According to the analysis, it is proved that the SOFC/GT/ST hybrid system suppress the rapid decrease in efficiency and lead to the significant improvement of efficiency as compared with SOFC system.

Failure of Hydraulic Oil Pipe and Transient Vibration (압유배관의 절손 원인 규명과 과도진동)

  • Kim, Yeon-Whan;Lee, Young-Shin;Koo, Jae-Raeyang;Kim, Hee-Su;Bae, Yong-Chae;Lee, Hyun
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.1268-1273
    • /
    • 2003
  • This paper presents a case history of piping failures on power plant. The root cause of the failure was defined to set the optimal countermeasures. The failure comes from transient vibration and the 1st stress increased at the hydraulic oil supply system of control valves for high pressure steam turbine.

  • PDF

Performance Analysis of CHP Condersing Season heat load Conditions (계절별 부하 특성을 고려한 CHP 성능 해석)

  • Seo, Young-Ho;Lee, Joon-Hee;Kim, Nam-Jin;Kim, Jong-Yoon;Cho, Sung-Kap;Jeon, Yong-Han
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.7
    • /
    • pp.454-459
    • /
    • 2010
  • This paper is a actual design case applied to make a bid for CHP plant construction in some country. The purpose of this study is to optimize the system performance for the requirement conditions written in ITB by the client. The system consists of gas turbine, steam turbine, heat recovery steam generator and heat exchangers for district heating. The performance analysis is conducted for various seasons conditions and heat load. As a result, air density and heat load is reduced in accordance with decreasing of the outdoor temperature, therefore the system power is reduced. Considering this, the design parameters to meet the requriement conditions are optimized.