Journal of the Korean BIBLIA Society for library and Information Science
/
v.30
no.2
/
pp.5-31
/
2019
As one of the challenges providing sufficient Social Overhead Capital (SOC), such as cultural and sports facilities, installing small libraries and remodeling old public libraries are crucial to provide local community a public space and specialized services. In order to achieve such objectives, those libraries need to designate special themes while operating and providing services. In this study, we sought to find the relationship between the specialized themes and the spatial composition of the library. For this purpose, we investigated the specialized themes, spaces, services, spatial composition of program, and external environment. Analysis results showed that those libraries need to coordinate various areas according to the respective themes as well as categorization for its specialization subjects in order to stimulate activities of the libraries and to increase the usage rates. In addition, we have identified that a variety of spaces, such as thematic experience zones, are needed to improve the libraries' performance.
Korean Journal of Construction Engineering and Management
/
v.12
no.2
/
pp.89-100
/
2011
As an impactive factor on industries and national economy, The Social Overhead Capital(SOC) is major factor to determine the national competitiveness and the investment of SOC is essential for its economic growth. Accordingly, introduction of the preliminary feasibility study and establishment of legal institutionalization and evaluation system has been carried out and reviewed since 1999. Nevertheless of these efforts, basic problems such as lack of scientific method for investment evaluation and loss of effectiveness on feasibility studies are continuously being brought up. Moreover, as the preliminary study to improve the mentioned problems is mainly focused on the economic and estimated demand analysis, the study of policy analysis, the most important phase during a feasibility study, is still insufficient. Therefore, in this paper, a quantitative decision-making model, to which the performance assessment method of Value Engineering(VE) is applied, is developed and proposed to improve the policy analysis of (preliminary) feasibility study that requires combining with relative studies, to induce quantitative analysis method, and to contribute the improvement of value on the political aspect for SOC investment goals and use as a strategic decision-making method by systematic analysis.
KSCE Journal of Civil and Environmental Engineering Research
/
v.39
no.1
/
pp.183-194
/
2019
In recent years, the risk of external flooding of major national facilities has increased significantly since 2000 due to the increase in local heavy rainfall events. For important domestic national facilities, it is necessary to analyze the risk of external flooding as flooding in major sites due to heavy rain can cause functional paralysis in major facilities and ultimately lead to massive trouble events. In order to manage the safety of main facilities and its related facilities at a high level, it is necessary to analyze the degree of disaster such as flood depth, flood flow rate, flood time and flood intensity when extreme floods (LIP) are introduced. In addition, the degree of vulnerability of these related facilities should be assessed and risk assessments should be reassessed through linkage analysis that combines the degree of disaster and vulnerability. By calculating a new flood hazard curve for the flood depth and flood intensity in major national facilities under the heavy rainfall conditions through this study, it is expected to be a basis for the waterproof design of important SOC facilities, flood prevention function design, advancement of flood prevention measures and procedures and evaluation of flood mitigation functions.
Jee-Hee Jung;Kang-Hyun Lee;Sangrae Lee;Bumsik Hwang;Nag-Young Kim
Journal of Korean Tunnelling and Underground Space Association
/
v.25
no.6
/
pp.569-582
/
2023
In recent years, the service life of major SOC facilities in south korea has exceeded 30 years, and rapid aging is expected within the next 10 years. This has led to a growing recognition of the need for proactive maintenance of these facilities. Consequently, there have been numerous research efforts to introduce smart inspection technologies into maintenance. However, the current system relies primarily on manpower for safety inspections and diagnostics, and on-site surveys rely on visual inspections. Manpower inspections can be time-consuming, and subjective errors may occur during result analysis. In the case of tunnels, there are disadvantages, such as the loss of social overhead capital due to partial closures during inspections. Therefore, institutionalizing smart safety inspections is essential, considering specific measures like using advanced equipment and updating qualifications for experts. Furthermore, it is necessary to verify and validate safety inspection results using advanced equipment before instituting changes. This could be achieved through national-level official research programs and the operation of verification and validation institutions. If smart inspection technology is introduced into maintenance, routine inspections of SOC facilities, such as tunnels, will become feasible. As a result, maintenance technology capable of early detection and proactive response to safety incidents caused by changes in facility conditions is anticipated.
Journal of the Korea Institute of Building Construction
/
v.22
no.4
/
pp.391-402
/
2022
With the number of social overhead capital(SOC) projects that introduce private capital on the rise, overseas construction global companies today need to establish and advance their overseas order strategies. In this context, the purpose of this study is to develop the public private partnership(PPP) capacity evaluation model for developing countries and use it for domestic overseas construction companies to establish strategies for overseas expansion. The PPP competency evaluation model analyzes the importance of PPP competency evaluation items and infrastructure environment competency evaluation items through a review of previous studies and an interview survey with overseas construction experts. Through the above analysis results and expert surveys, problems that may occur when overseas construction companies enter the PPP market were derived, and improvement measures were proposed. Countries with a high probability of overseas construction companies entering the PPP market were determined to be those that have a mature PPP system, low risk in construction, and a good entry environment with a high infrastructure market size and growth rate. In addition, a lack of PPP investment experience, the absence of information on the infrastructure environment, and a shortage of PPP experts were identified as problems when entering the overseas construction PPP market. As an improvement measure, it was suggested to enter in cooperation with domestic and foreign companies. In addition, a plan was proposed to develop a curriculum to secure experts in areas such as PPP finance and contracts and to provide PPP information for each country. These findings are expected to contribute to overseas construction companies proposing strategies for entering the overseas construction market and using them for overseas expansion strategies and policy establishment.
The Journal of the Convergence on Culture Technology
/
v.10
no.4
/
pp.437-442
/
2024
The unification of the Korean Peninsula is not only a national aspiration but also holds significant economic implications. By maximizing the economic synergy between South and North Korea and reconstructing the North Korean economy, balanced development across the peninsula can be promoted. However, the unification process will face various economic challenges, including the substantial costs of unification, integrating different economic systems, and bridging the economic disparity between the two Koreas. This paper aims to analyze these anticipated economic issues and propose systematic and phased solutions. Specifically, it discusses the objective estimation of unification costs and funding strategies, suggests effective integration methods for the disparate economic systems of the two Koreas, and identifies policy tasks to reduce economic disparities. The paper reviews existing studies on unification costs, explores strategies for the balanced development of South and North Korean economies through industrial restructuring and gradual transition to a market economy, and proposes concrete measures such as the expansion of North Korea's social overhead capital (SOC) and the development of human capital. The goal is to establish a solid economic foundation for peaceful unification and create opportunities for the economic resurgence of the Korean Peninsula.
Journal of Korean Society of Environmental Engineers
/
v.34
no.6
/
pp.382-390
/
2012
Global warming has been hot issue world wide. Korea has been dealing with the global issue under the slogan of low carbon and green-growth such as setting national greenhouse gas (GHG) reduction targets and allocation to each industrial sector. Infrastructure construction, in which enormous social overhead capital (SOC) is input, has great role as one of the actions. Road is one of the representative infrastructure and large amount of resources is utilized in its construction, operation and maintenance stage. The estimation methodology of life cycle carbon emissions was developed and applied to a case study of highway currently under construction in this study. Also, total carbon emissions of all the highway in South Korea at present (2009) and cumulative carbon emissions from 2009 to 2020 were estimated using the results of case study.
KSCE Journal of Civil and Environmental Engineering Research
/
v.32
no.5D
/
pp.463-472
/
2012
Exemplary contracts of construction management (CM) including highway projects have been carried out in the civil engineering area over the past ten years. However, practical and administrative challenges as transitional circumstances have been revealed in the different participants of supervision, inspection and construction management. Thus, it is important to internally overcome problems and negative perception encountered in civil engineering, and to promote the efficiencies in construction cost and quality. In addition, external efforts should be put to market opening, globalization, and technology development for competitiveness and high value industry. While it is critical to establish the concrete CM system by collaborating with various participants, proven architecture and system have not been provided because of incorrect measurement of CM accomplishment, overlap of responsibility between CM and supervision, and slow deployment in construction field. This paper analyzed the current CM practices and business environments, and presented the possible solutions for strategy improvement of CM in the owner's view point.
As SOC (Social Overhead Capital) has been expanded, the highway road construction has been accelerated and city road system has been more complicated. So, long road tunnels have been increased and traffic flow rate also has been raised. Accordingly, the exhausting gas of vehicle cars seriously deteriorates the tunnel inside air quality and driving view. In order to improve tunnel inside air quality, we may need to introduce a compulsory ventilation system as well as natural ventilation mechanism. The natural ventilation mechanism is enough for short tunnels, meanwhile longer tunnels require a specific compulsory ventilation facility. Many foreign countries already have been devoting on development of effective tunnel ventilation system and especially, some European nations and Japan have already applied their developed tunnel ventilation system for longer road tunnels. More recently, as the quality of life improved, our concerns about safety of driving and better driving environment have been increased. In order to obtain clearer and longer driving view, we are more interested in EP tunnel ventilation system in order to remove floating contaminants and automobile exhaust gas. Evan though it's been a long time since many European countries and Japan applied more economical and environment-friendly tunnel ventilation system with their self-developed Electrostatic Precipitator, we are still dependant on imported system from foreign nations. Therefore, we need to develop our unique technical know-how for optimum design tools through validity investigation and continuous possibility examination, eventually in order to localize the tunnel ventilation system technology. In this project, we will manufacture test-run products to examine the performance of system in order to develop main parts of tunnel ventilation system such as electrostatic precipitator, high voltage power generator, water treatment system, etc.
Even though the pre-feasibility study was introduced in 1998, it mainly has focused on transportation social overhead capital(SOC) such as road and railroad. Last year, however, the government newly launched R&D project area for the pre-feasibility study. This paper tries to analyze the pre-feasibility study methodology and system that applied to R&D facility, cluster, and sized R&D infrastructure projects. In depth study of economic, policy, and AHP analysis, this paper shows that the preliminary feasibility study have some caveats and suggests a way of improvement for making up for limitation. Main suggestions are as follows; First, to improve the fit in R&D sector analysis, using consistent method is important. Second, technology analysis is essential for R&D evaluation. Third, technology experts should take part in AHP analysis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.