• Title/Summary/Keyword: SOC(social overhead capital)

Search Result 57, Processing Time 0.027 seconds

An Appropriated Share between Revenue Expenditure and Capital Expenditure in Capital Stock Estimation for Infrastructure (SOC 자본스톡 추계에 있어서 수익적 지출과 자본적 지출의 적합 분배)

  • Cho, J.H.;Lee, S.J.;Oh, H.S.;Kwon, J.H.;Jung, N.Y.;Kim, M.S.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.2
    • /
    • pp.153-158
    • /
    • 2018
  • At the Bank of Korea, capital stock statistics were created by the PIM (perpetual inventory method) with fixed capital formation data. Asset classifications also included 2 categories in residential buildings, 4 non-residential buildings, 14 constructions, 9 transportation equipment, 28 machinery, and 2 intangible fixed assets. It is the Korean government accounting system which is developed much with the field of the national accounts including the valuation, but until 2008 it was consistent with single-entry bookkeeping. Many countries, including Korea, were single-entry bookkeeping, not double-entry bookkeeping which can be aggregated by government accounting standard account. There was no distinction in journaling between revenue and capital expenditure when it was consistent with single-entry bookkeeping. For example, we would like to appropriately divide the past budget accounts and the settlement accounts data that have been spent on dredging into capital expenditure and revenue expenditure. It, then, tries to add the capital expenditure calculated to FCF (fixed capital formation), because revenue expenditure is cost for maintenance etc. This could be a new direction, especially, in the estimation of capital stock by the perpetual inventory method for infrastructure (SOC, social overhead capital). It should also be noted that there are differences not only between capital and income expenditure but also by other factors. How long will this difference be covered by the difference between the 'new series' and 'old series' methodologies? In addition, there is no large difference between two series by the major asset classification level. If this is treated as a round-off error, this is a problem.

PPI (PRIVATE PARTICIPATION IN INFRASTRUCTURE) STATUS OF SOC (SOCIAL OVERHEAD CAPITALS) AND ITS IMPROVEMENT IN KOREA

  • Sugk-Yong Yoon ;Sung-Won Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.353-359
    • /
    • 2005
  • The infrastructure in korea has been improved drastically since July 7th, 1970 which was the first highway completed date in Korea (Seoul-Pusan). This is one of the major factors for the competitiveness of a country. Now the total length of highway in Korea is more than 2000km. However Korea is 11th in the trade volume in the world, the SOC level of Korea is around 20th at most in the world (IMD 2004). The infrastructure in Korea comparing other developed countries is far below, which gives the impact of cost of goods, even twice expensive in transporting goods through highways, railways and ports etc. Now the government budget is gradually spending more for welfare and health care side. The most of additional expense of welfare is increasing rather than SOC budget is decreasing or staying as it is as 2003. The government may think that the level of SOC is enough in point of view of preference input of budget such as welfare and health care etc. However the SOC level in Korea is far form the competitiveness of the country. The main points of this paper is to show that where Korea is in point of SOC level to go for developed country, and what to do to facilitate BOT, BTO and BTL projects. Korean government has tried to improve the practice of PPI (Private Participation of Infrastructure) with the Act on Private Capital Inducement in 1994 and the Act on Private Investment in 1997.

  • PDF

Computations of Forest Road Density considering for Forest Terrain and Characteristics (산지 지형 및 특성을 고려한 임도밀도 산정)

  • Jung, Do Hyun;Cha, Du Song;Park, Chong Min;Lee, Joon Woo;Ji, Byoung Yun;Chun, Kwon Suk;Kim, Jong Yoon
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.3 s.160
    • /
    • pp.168-177
    • /
    • 2005
  • To provide the basic policy informations for environment-friendly and economical construction of green forest road, forest road density considering for the forest terrain and characteristics was computed. As results, designing the effective forest management and protection, standard forest road density as a social overhead capital (SOC) concept was computed to 8.57 m/ha. Considering as based facilities for forest management, we also optimal forest road density for preparing the sustainable forest management system was computed to 14.01 m/ha.

A Study on Establishing Entry Strategies of Private Engineering Firms in the Overseas Urban Development Market (기업의 해외 도시개발 시장진출을 위한 전략수립에 관한 연구 - IPA 기법을 중심으로 -)

  • Song, Hokyoung;Yu, Youngsu;Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.86-95
    • /
    • 2019
  • As the urban development economy is stagnating due to the reduction of the budget for Social Overhead Capital (SOC) and the stabilization policy of the real estate market, there is a steady increase in the interest of domestic construction companies to enter the overseas market. However, domestic construction companies are showing a decline in overseas urban development market as compared with advanced foreign companies having excellent financial management and overseas project management ability. Therefore, it is necessary for domestic companies to select an urban development model that meets the environment and the level of the country of entry, and to establish an advance strategy to manage the risks of overseas business. For this purpose, the factors of entry into the overseas urban development market through the existing research, literature analysis, and FGI were derived, and survey strategy and IPA analysis were conducted to develop strategies for entering the overseas urban development market. As a result, we have established a strategy for private companies to enter the overseas urban development market.

Prioritizing SOC Facilities for Applying BIM/GIS Integrating Platform to Local Governments (지방자치단체에 BIM/GIS 통합 플랫폼 적용을 위한 SOC 시설물 우선순위 선정방안)

  • Youn, Jun Hee;Lee, Woo Sik;Choi, Hyun Sang;Kang, Tae Wook
    • Spatial Information Research
    • /
    • v.21 no.5
    • /
    • pp.7-14
    • /
    • 2013
  • Recently, BIM(Building Information Model) is widely applied to all stages of SOC (Social Overhead Capital)facilities life cycle from planning to maintenance. While BIM is an analysis tool focussing the inner space of facilities, GIS is principally applied to analyzing relationship between facilities. Therefore, integrating BIM and GIS, we expect to get a potential synergy effect in aspects of effective information management and various analysis for SOC facilities. This paper deals with prioritizing SOC facilities for applying BIM/GIS integrating platform to local governments. First, investigate facilities required by law, and identify SOC facilities suitable for SOC characteristics. Second, analyze the effectiveness and applicability of BIM/GIS integrating platform applying each facility. For the purpose, we quantify effectiveness and applicability in aspects of UIS management and GIS functions. Lastly, prioritize the SOC facilities applying BIM/GIS integrating platform.

Best Practice on Inspecting the Abnormal State of Bridge (Engineering works) Establishment with Augmented Reality (AR) Mechanism

  • Janghwan Kim;So Young Moon;R. Young Chul Kim
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.2
    • /
    • pp.168-174
    • /
    • 2023
  • In the current world, with the massive scale of SOC construction, it is difficult to diagnose and check all of a bridge's abnormal states with even the experts' eyes for maintenance. It is because we should spend huge costs and time on maintenance. Still, there are not many alternative ways to inspect bridges remotely regarding accuracy or reality. Therefore, we remark on the advantages and disadvantages of previous methods through practices in SOC maintenance. To inspect the abnormal state of the Bridge, we suggest inspecting bridges with an Augmented Reality (AR) mechanism to reduce cost, human resource consumption, and the risk of work. Through the proposed approach, we expect that it provides ways to solve massive construction problems with software-based technologies.

Regional Profiling by Considering Educational Facilities - Centered on Gwangjin-gu, Seoul - (교육 시설 생활인프라 특성을 고려한 지역 프로파일링 연구 - 서울시 광진구 중심으로 -)

  • Kang, Woo-Seok;Lee, Hee-Chung
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.5
    • /
    • pp.3-10
    • /
    • 2019
  • This study has a purpose to profile local sectors into meaningful groups by using facilities rates of Social Overhead Capital(SOC) for daily life. Comparing SOC for daily life among the meaningful groups, the profiling and comparison results bring the comprehensive understanding about the educational facilities in local sectors. For the research purpose, this study utilized Latent Profile Analysis(LPA) by using variables such as population, road information, SOC for daily life, usage of land, possession of land, and appraised value of land from the 2018 Geographic Information System(GIS) dataset of Gwangjin-gu, where is one of the administrative district of Seoul City. Results showed that there are four latent groups of sectors among 904 local sectors(100 squared-meters sector per each) in Gwangjin-gu. By comparing the four latent groups by using LPA, the results diagnose each sector's status and help to improve the policy about educational facilities. Specifically, by using dataset for SOC of daily life, there are four groups of local sectors and each group has different features. Based on the different features of local sector groups, there can be improved management of educational facilities matching with each group's features.

A Study on the Improvement of SOC Project Planning Process and Systems (국내 SOC 사업의 기획업무 개선에 관한 연구)

  • Shin Dongwoo;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.45-52
    • /
    • 2000
  • In Korea, demand for the Social Overhead Capital(SOC) projects has tremendously increased since 1970's and is expected to keep growing to support national economic development as well as to enhance the quality of life. In these projects, project planning and feasibility study phase is one of the most critical phases because it determines the success of later phases. However, we have experienced trial and errors repeatedly such as cost overruns and schedule delays in many of the SOC projects. These problems can be prevented or at least expected in the earlier phase and it requires well-developed and standardized project planning process and systems before design, procurement, and construction phases begin. Therefore, the purpose of this research is to investigate current problems in this phase and provide framework for a model for the project planning management which can be used for the SOC projects to insure the whole project success.

  • PDF

Building Direction of a Procurement Management Process Model for the SOC projects (Focused on the Airport Facilities) (SOC 사업의 조달관리 프로세스 모델 구축 방향 (공항시설물 중심으로))

  • Kim Ku-Taek;Kim Sun-Kuk;Han Choong-Hee;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.108-116
    • /
    • 2000
  • The absence of systematic project procedures in the domestic SOC projects has caused many problems. Therefore, it has been raised the needs for the effective project management of the projects which helps the participants to have systematic procedures at each phase of the SOC projects. The purpose of this research is to build the current model of procurement management process for the airport facilities and to derive inherent problems, and the building direction of the effective procurement management is suggested for the future research. The result of this research could be used for delivering the effective SOC projects and for establishing interrelationships between procurement and other phases of the projects for the integrated project management. The procurement process of the Inchon International Airport was investigated and the as-is model was built. Through the analysis of the as-is model, and the questionnaires and the interviews with the participants of the SOC projects, the problems of the current procurement process has been derived.

  • PDF

An option pricing-based model for evaluating privatized infrastructure projects (옵션기반모형을 활용한 민간 사회기반시설 프로젝트 평가 사례: 인천공항철도 민간투자사업)

  • Lee, Sun-Ju;Yoo, Shi-Yong
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.12a
    • /
    • pp.398-401
    • /
    • 2009
  • 민간 주도형 사회간접자본 (social overhead capital :SOC) 사업은 BOT(build-operate-transfer)를 비롯하여 대상 프로젝트의 정부 정책 등의 여러 환경의 변경에 따라 다양하게 변형되어 적용되어 BTL(build-lease-transfer), BOO (build-own-operate)등의 여러 기법들을 사용된다. 민간 SOC 사업은 프로 젝트의 규모와 장기에 걸친 공사의 불확실성 때문에 프로젝트의 경제성 분석을 하는 것은 복잡하다. 일반적으로 사용하고 있는 현금흐름 할인모형(discount cash flow model; DCF)은 미래의 불확실성 변수들을 적절히 반영하지 못한다는 한계점을 가지고 있지만 현실적으로 많이 쓰이고 있는 방식이다. 본 논문은 옵션기반모형에 근거한, BOT-옵션가치평가(BOT-OV)모형을 국내 민간 SOC 사업의 경제성 분석을 위해 적용한다. BOT-OV모형을 적용하는 것이 기존 순현재가치(net present value; NPV)방식을 통하여 프로젝트 가치 평가 할 때보다 더 정밀한 경제적 타당성 평가를 할 수 있다는 것을 확인하여 기존의 NPV 평가방식의 방법을 대체할 수 있는 가능성을 확인하는데 의의가 있다고 할 수 있다.

  • PDF