• Title/Summary/Keyword: Route Section

Search Result 138, Processing Time 0.028 seconds

Analysis of the Research Trend and Developmental Direction against the VDS Data (차량검지기 자료 관련 연구동향 분석 및 발전방향)

  • Kim, Han-Soo;Park, Dong-Joo;Shin, Seung-Jin;Beck, Seung-Kirl;NamKoong, Sung
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.6 no.1 s.12
    • /
    • pp.13-26
    • /
    • 2007
  • A VDS data in the domestic has been used within limits to real time information such as congestion management, incident management, and route guidance service. On the other hand, a VDS data in the foreign countries had been used to various objectives such as transportation policy assessment, transportation construction evaluation, franc safety improvement, and etc. The scope and method of the study is the VDS data which was installed in the uninterrupted flow such as the freeway and the interrupted flow in a diversion route of the leeway. It has investigated and analyzed the VDS as our subject to study, study objective and study methodology for each study generally classified as 1) data collection 2) data processing 3) data store and 4) data quality section. This study has investigated and analyzed the various literatures in domestic and foreign countries regarding the VDS data. And It drew the development direction of the study which is about VDS data in domestic from now.

  • PDF

Long-Term Arrival Time Estimation Model Based on Service Time (버스의 정차시간을 고려한 장기 도착시간 예측 모델)

  • Park, Chul Young;Kim, Hong Geun;Shin, Chang Sun;Cho, Yong Yun;Park, Jang Woo
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.6 no.7
    • /
    • pp.297-306
    • /
    • 2017
  • Citizens want more accurate forecast information using Bus Information System. However, most bus information systems that use an average based short-term prediction algorithm include many errors because they do not consider the effects of the traffic flow, signal period, and halting time. In this paper, we try to improve the precision of forecast information by analyzing the influencing factors of the error, thereby making the convenience of the citizens. We analyzed the influence factors of the error using BIS data. It is shown in the analyzed data that the effects of the time characteristics and geographical conditions are mixed, and that effects on halting time and passes speed is different. Therefore, the halt time is constructed using Generalized Additive Model with explanatory variable such as hour, GPS coordinate and number of routes, and we used Hidden Markov Model to construct a pattern considering the influence of traffic flow on the unit section. As a result of the pattern construction, accurate real-time forecasting and long-term prediction of route travel time were possible. Finally, it is shown that this model is suitable for travel time prediction through statistical test between observed data and predicted data. As a result of this paper, we can provide more precise forecast information to the citizens, and we think that long-term forecasting can play an important role in decision making such as route scheduling.

Development of Bus Arrival Time Estimation Model by Unit of Route Group (노선그룹단위별 버스도착시간 추정모형 연구)

  • No, Chang-Gyun;Kim, Won-Gil;Son, Bong-Su
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.1
    • /
    • pp.135-142
    • /
    • 2010
  • The convenient techniques for predicting the bus arrival time have used the data obtained from the buses belong to the same company only. Consequently, the conventional techniques have often failed to predict the bus arrival time at the downstream bus stops due to the lack of the data during congestion time period. The primary objective of this study is to overcome the weakness of the conventional techniques. The estimation model developed based on the data obtained from Bus Information System(BIS) and Bus management System(BMS). The proposed model predicts the bus arrival time at bus stops by using the data of all buses travelling same roadway section during the same time period. In the tests, the proposed model had a good accuracy of predicting the bus arrival time at the bus stops in terms of statistical measurements (e.g., root mean square error). Overall, the empirical results were very encouraging: the model maintains a prediction job during the morning and evening peak periods and delivers excellent results for the severely congested roadways that are of the most practical interest.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

Analysis of Preference for UAM of Public Transportation Users Following UAM Adoption (Incheon Airport - Incheon Gil Medical Center Line) (도심항공교통(UAM) 도입에 따른 대중교통 이용자들의 UAM에 대한 선호도 분석 (인천공항-인천길병원 노선사례))

  • Lee, Han sol;Lee, Soo beom;Lim, Joon bum
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.5
    • /
    • pp.1-14
    • /
    • 2022
  • In this study, in order to analyze the preference for UAM of public transportation users following the introduction of urban air transportation(UAM), A preference consciousness(SP) survey was conducted on 840 users of Incheon public transportation using the Incheon International Airport-Incheon Gil Hospital route, which is the urban air traffic(UAM) demonstration route section. In addition, the means selection model was estimated based on the results of conducting a preference consciousness (SP) survey. As a result of analyzing the time value for travel using the established means selection model, it was found to be 56,428 won/hour, As a result of verifying the elasticity of travel cost (won), in-vehicle time (minutes), and out-of-vehicle time (minutes) in the model, the effect on the urban air traffic (UAM) share in this model was found that travel cost (won), in-vehicle time (minutes), and out-of-vehicle time (minutes) were in order, and the effect was greater when the travel cost (won) decreased than when it increased.

An Impact Analysis of the Korea-Japan Undersea Tunnel Project;focus on Economic Potential Model Analysis (한일간 해저터널사업의 효과분석;성장잠재력 분석을 중심으로)

  • Park, Jin-Hee
    • Journal of Navigation and Port Research
    • /
    • v.32 no.1
    • /
    • pp.47-56
    • /
    • 2008
  • With rapid growing of the Northeastern Asia, the interest for the connection of Infrastructure that was behind of interesting until now is getting larger. In a line of same connection, UN-ESCAP are forwarding transcontinental railway project, asian highway project et al.. And this study aimed at analysis on the effect that extended to a space by Korea-Japan undersea tunnel project. In aspect of a national land balanced-development to solve various problems such as overcrowding in capital region, unbalanced state by regions, weak exchange between South and North Korea, and weakness of national land basis to prepare for unification et al., this study consulted the economic potentiality model as a analysis method to examine an effect. In this analysis, I used 24 scenarios including all cases by combination of 3 scenarios for Korea-Japan undersea tunnel, 4 scenarios for transportation modes in the section of undersea tunnel, and 2 scenarios for adjacency infrastructure. Transportation modes in the section of undersea tunnel are railway, car-train, mixing way of railway and car-train, and mixing way of road and railway. Adjacency infrastructure applied railway and road. In all scenarios, Korea showed higher growth potentiality than Japan. Also, proposal plan C route relatively showed better in national land balanced-development than other proposal plans. The growth potentiality relatively appeared higher by buildup of a connection together with non-capital regions from the construction of Korea-Japan undersea tunnel. In aspect of Northeastern Asia, it resulted in a increasing of trade and chance of network formation in the region of Asia through infrastructure connection. But, in considering passenger and various factors that extended to the economic growth, this analysis have some limitation. Therefore, I hope that deep studies will continuously perform with various factors.

A Study on the Safety-Maximizing Design of Exclusive Bus Lanes (안전성 제고를 위한 버스전용차로 디자인 연구)

  • Yang, Chul-Su
    • Journal of Korean Society of Transportation
    • /
    • v.30 no.4
    • /
    • pp.21-32
    • /
    • 2012
  • Exclusive bus lane (EBL) is typically located in the roadway median, and is accessed by weaving across the GPLs(general purpose lanes) before entering from the left lane of the GPLs. To maximize the potential for successful EBL operations, a critical design issue that requires special attention is the length of bus weaving section before entering EBL. The process of developing guidelines for the length of bus weaving section can be supported by a sensitivity analysis of performance measure (safety) with respect to the bus weaving distance. However, field data are difficult to obtain due to inherent complexity in creating performance measure (safety) samples under various interesting flows and bus weaving distance that are keys to research success. In this paper, VISSIM simulation is applied to simulate the operation of roadway weaving areas with EBL, and based on vehicle trajectory data from microscopic traffic simulation models, the Surrogate Safety Assessment Model (SSAM) computes the number of surrogate conflicts (or degree of safety) with respect to the bus weaving distance. Then, a multiple linear regression (MLR) model using safety data (number of surrogate conflicts) is developed. Finally, guidelines for bus weaving distance are established based on the developed MLR. Developed guidelines explicitly indicate that a longer bus weaving distance is required to maintain desired safety as weaving volume increases.

Status of Damage and Restoration Planning of Forest Trail in Choansan(Mt.) Neighborhood Park, Seoul, South Korea (초안산근린공원 숲길 훼손 실태 및 복원방안 연구)

  • Han, Bong-Ho;Ki, Kyong-Seok;Noh, Tai-Hwan
    • Korean Journal of Environment and Ecology
    • /
    • v.26 no.6
    • /
    • pp.923-933
    • /
    • 2012
  • The purpose of this study targeting Choansan(Mt.) Neighborhood Park in Seoul of South Korea, whose level of visitation and use pressure has been recently increasingly high, was to understand distribution and damage status of forest trail and accordingly, set up direction of how to improve forest trail in urban area. With regards to current damage on forest trail in Choansan(Mt.) Neighborhood Park, the damaged trail with road width of over 2m and with erosion depth of over 30cm amounted to 20.3% and 36.3% respectively. And the trail section with bare land erosion, root exposure or rock exposure and the section whose impact rating class exceeded IV occupied 47.0% and 70.6%, indicating the forest trail was severely damaged. The severely injured trail route mainly included the main forest trail formed along the main ridge, the byroad connected to the main forest trail and the steep forest trail in low-lying area. Based on the study results, five types of restoration of forest trail in Choansan(Mt.) Neighborhood Park were offered, including prevention of forest trail extension, stabilization of forest trail base, maintenance of forest trail surface, vegetation restoration after closing forest trail and maintenance. Ecological restoration was additionally offered. The prevention of forest trail extension was planned to prevent expanded width of forest trail where bare land was exposed. The stabilization of forest trail base was planned to prevent erosion in the forest trail and exposure of roots. The maintenance of forest trail surface was planned in a way to protect the severely damaged forest trail surface by using wood deck and wood stairs and surfacing the road.

Analysis of Traffic Noise for Single and Double Layered Porous Pavement with SPB Method -National Route 1, Sejong-Si Section- (SPB측정법에 의한 복층 및 단층 다공성포장의 소음분석 -국도 1호선 세종시 구간-)

  • Yoo, In-Kyoon;Lee, Su-Hyung;Han, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.92-102
    • /
    • 2020
  • Porous pavement (PP) has attracted attention as a new alternative measure against road traffic noise. PP refers to pavement that reduces the fines in the asphalt mixture to form voids. These voids can reduce traffic accidents and friction noise. For active application, verification of the noise reduction effect is required. In this study, the noise reduction of single-layer PP(SLPP) and double layer PP(DLPP) was analyzed. First, the Sejong section was selected, and traffic noise was measured using the SPB method on the roadside. The traffic volume, speed, and mixing ratio of large vehicles were measured. As a result, the DLPP was evaluated to be 7.95 dB(A) smaller on average and 7.57dB(A) smaller at the 95% reliability level than the SLPP. The traffic volume was more influential than the speed and the mixing rate of large vehicles. As the traffic volume increased, the noise increased, but the difference in noise between the two pavements decreased gradually. The results showed that the most effective way to reduce road traffic noise is to change the road pavement rather than reduce traffic speed, restrict traffic for heavy vehicles, or reduce traffic volume.

A Study on Safe Separation Distance between Tunnel and Interchange (터널과 입체 교차로간의 안전한 이격거리 연구)

  • Lee, In-Bae;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.2
    • /
    • pp.273-279
    • /
    • 2019
  • Development of mountain area is increasing due to the demand for improvement of traffic convenience and development of underdeveloped area. Therefore, there frequently are sections where tunnels and interchanges are located close to each other. These sections do not only affect tunnel planning, types and length of interchanges, but also affect more on route selection. In Korea, several design criteria present each reference value but these values are very similar. In the situation, the minimum value among them is usually applied when planning roads and it could cause traffic safety problems in different site conditions. In this study, the problems of design speed, illuminance adaptation distance, and lane change intervals are analyzed by simulating the cases that the problem could occur when calculating the separation distance between tunnel and interchange. The results obtained from this study can be summarized as following: the driving speed should be applied in case that the site has a big gap between design speed and driving speed because the uniform application of the design speed is not safe; the illuminance adaptation distance should include the influence distance in the section affected by the direct light; in addition, the lane change distance should include the time to perceive the situation of the next lane after the lane change in the section required for successive lane change.