• Title/Summary/Keyword: Rolling stock Maintenance

Search Result 132, Processing Time 0.028 seconds

Feasibility Check of Maintenance Period by The Operating Reliability of EMU-Focusing on the Main Components of Ansan Line EMU- (전기동차의 운행 신뢰성을 통한 유지보수주기의 타당성 검토 -안산선 전기동차의 주요부품을 중심으로-)

  • Park, Su-Myung;Song, Moon-Shuk;Son, Young-Jin;Lee, Hi-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1412-1417
    • /
    • 2011
  • Safety is soaring up as a core value in accordance with the recent improvement of operating speed & incidents. rolling stock is a kind of system which works together with several components. one component has an effect on the sub-system, which can cause to the train safety operation, therefore reliability management of the major components of rolling stock is a kind of solution to the safety operation of train, but realistically maintenance in korea performed based on period rather than TBO of major components, but Japan does new maintenance system based on the major components, which optimizes maintenance tasks. actually Japan can apply to new maintenance system because they are ready in planning step but in this study, making a reliability data of major components and review the adaptability of new maintenance system to the rolling stock operating in Ansan line.

  • PDF

A case of maintenance activity in advanced countries for apparatus of electric rolling stock (전동차 전기장치의 선진 유지보수 활동사례)

  • Kim, Min-Pyo;Lee, Sang-Soo;Kwak, Sang-Log;Park, Chan-Woo;Cho, Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.935-940
    • /
    • 2006
  • Present periodic maintenance activities are carried on electric rolling stock in Korea based on predetermined inspection intervals. And this can be seen as a first generation of maintenance techniques without taking into consideration a degree of aging or degradation of the componets. In this study, we have analyzed the current status of maintenance being used in the techniques in various activities such as overseas railway operation organization, and good cases for the advanced country's maintenance system being carried out effectively. Based on the analysis, we would derive implications for efficient application and improvement guidance of maintenance system in electric rolling stock.

  • PDF

An economical analysis between extension use of PP and introduction of intercity EMU (새마을 동차의 연장사용과 간선형 EMU도입간 경제성분석)

  • Park, Su-Myung;Yun, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.775-783
    • /
    • 2010
  • The Yong-san rolling stock depot in which KORAIL does the maintenance of PP was required to move to the other place, so there are some disputes how to treat PP rolling stock, that is, early scraping, extending life-span or introduction of intercity EMU, but introducing a new train are very expensive and also very risky, so executed economical analysis for the precision political decision. For the specific analysis, set some scenario, first uses PP to their life span, second, introduces new intercity EMU, third, extends the life-span of PP by rolling stock precision diagnosis. Largely, maintenance cost, operation cost, rolling stock value are used for the economical analysis. This research is the specific case of KORAIL, but this result can be a valuable data in the perspective of operation cost between diesel rolling stock and electric rolling stock.

  • PDF

A study of the railroad vehicles cycle and method (철도차량 검수주기 및 방법에 관한 연구)

  • Yu, Yang-Ha
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.158-166
    • /
    • 2007
  • After constructing the high-speed railroad, KORAIL acquired advanced maintenance techniques about Rolling-stocks. Also RCM theory is applied to maintenance field like as inspection period and method. In the meantime, the development of the maintenance methode for Rolling-stock is slow when it compares to the components and system technology. For this reason KORAIL tries to build the optimal maintenance system which can lead the Rolling-stock maintenance technique. The existing vehicle except High Speed train KTX are separated to electric motor car, electric locomotive, diesel locomotive, diesel car, passenger car and freight car. The inspection period and methode for existing vehicles which mentioned above will be examined and the optimal Rolling-stock maintenance technique will be applied.

  • PDF

The Study of the RIMS(Rolling-stock Information Maintenance System) for constructing the Rolling-stock's BOM(Bill Of Material) (도시철도 유지보수체계 RIMS관련 전동차BOM 구축에 관한 연구)

  • Park, Soo-Choong;Lee, Do-Sun;Son, Young-Jin
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1247-1252
    • /
    • 2006
  • This Report explains a plan for the application and construction about BOM(Bill Of Material) in charge of primary part of the RIMS(Rolling-Stock Information Maintenance System) maximizing the RIMS's reliability. The BOM system of the Seoul Metro is accomplished the frequent changes of the structure and design through the OEM(Original Equipment Manufacturer) and the maintaining and repairing work and also The BOM system is constructed so that Seoul Metro can solve all problems of the composition change, Rolling-Stock construction, changeful history management. In addition the BOM system of the Seoul Metro is considered the applicative side of the technical data, information of the material, expediency and hindrance analysis.

  • PDF

A study on the efficient maintenance interval for the rolling-stocks (철도차량의 효율적인 정비주기에 관한 연구)

  • Yu, Yang-Ha;Jung, Jin-Tae;Kim, Ho-Soon;Kim, Dae-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1612-1617
    • /
    • 2011
  • Rolling stock needs many maintenance works because of its long service life. The maintenance of rolling stock has periodic preventive maintenance system. This periodic preventive maintenance system can't reflect the characteristics of every part. The condition-based maintenance system which reflects the functional condition of every part prevents breakdown and reduces maintenance cost. This study will analyze the records of every part by unreasonable examples of time-based preventive maintenance and reliability management activities, and discuss the necessity of maintenance system reflected the results.

  • PDF

A Study on the New Rolling Stock Vehicle Maintenance Technology and Discussion on Quality Assurance Measures (신규 도입차량 유지관리 기술과 품질보증 대책에 대한 고찰)

  • Choi, Seog-Jung;Kim, Moon-Hong;Kim, Bong-Rae
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.27-37
    • /
    • 2011
  • Currently, in the course of introducing rolling stocks, RAMS standard and management by system engineering method apply to rolling stock system. Technical elements and results applied in system introduction phase are just used in acquisition stage, and these are not applied to the standard in railway site. Therefore, it is difficult to apply to standardized technology and quality assurance measure. Due to the establishment of the EU, railway operation system is internationalized and the international railway standards are being discussed in various ways. In addition, standardization is expanded from manufacture to operation and maintenance. It is to provide consistent standard in quality, cost calculation of maintenance technology, maintenance technology and quality assurance in case of international railway safety incidents. Therefore, this study is to find technology, quality and cost management model to be used for choosing railway-operation guidance by considering how technologies & quality have changed in system life cycle, compared with estimated standards, based on the technologies & quality-related result in the process of getting new rolling stocks and management guidance for operation & maintenance process.

  • PDF

An Evaluation of Development Plans for Rolling Stock Maintenance Shop Using Computer Simulation - Emphasizing CDC and Generator Car - (시뮬레이션 기법을 이용한 철도차량 중정비 공장 설계검증 - 디젤동차 및 발전차 중정비 공장을 중심으로 -)

  • Jeon, Byoung-Hack;Jang, Seong-Yong;Lee, Won-Young;Oh, Jeong-Heon
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.3
    • /
    • pp.23-34
    • /
    • 2009
  • In the railroad rolling stock depot, long-term maintenance tasks is done regularly every two or four year basis to maintain the functionality of equipments and rolling stock body or for the repair operation of the heavily damaged rolling stocks by fatal accidents. This paper addresses the computer simulation model building for the rolling stock maintenance shop for the CDC(Commuter Diesel Car) and Generator Car planned to be constructed at Daejon Rolling Stock Depot, which will be moved from Yongsan Rolling Stock Depot. We evaluated the processing capacity of two layout design alternatives based on the maintenance process chart through the developed simulation models. The performance measures are the number of processed cars per year, the cycle time, shop utilization, work in process and the average number waiting car for input. The simulation result shows that one design alternative outperforms another design alternative in every aspect and superior design alternative can process total 340 number of trains per year 15% more than the proposed target within the current average cycle time.

Development and Application of RCM Process for the Optimized Maintenance of Railway Vehicle (철도차량의 유지관리 최적화를 위한 RCM 프로세스 개발 및 적용)

  • Shin, Kun Young;Lee, Hi Sung
    • Journal of Energy Engineering
    • /
    • v.24 no.1
    • /
    • pp.10-16
    • /
    • 2015
  • Recently, RCM(reliability centered maintenance) process is introduced and applied for the planning and implementing efficient and effective maintenance system in terms of optimal rolling stock maintenance. Particularly, cost-time benefits analysis associated with the implementation of RCM for rolling stock maintenance is necessary and required for railway operator in advance. The RCM process was primarily starting from military, airplane and nuclear industries and is now adapted in railway industry for local railway operators. This paper focuses on suggesting the way of connecting the RCM process with railway maintenance activities in the railway operation field. Thus, in order to introduce and establish reliability activities, it needs to review and evaluate the maintenance environment in the organizational point of view. Based on these reviews and evaluations, various maintenance methodologies are reviewed for customizing local railway field situations and establish specific process in the application of major systems on the reliability technology. In this paper, the railway RCM process is proposed for the establishment and construction of the systematic and optimal maintenance system.