The important role of observational method in geotechnical engineering are emphasized together with the direction of future development, concerning successful application of the technique on the site investigation, design and feed back at various construction stages. Case histories on the application of feed back are introduced in order to achieve the most economical and reliable construction for tunnel, rock slope and deep excavations through feed back system at design and construction stages. Also the limitations and advantages of the observational method and the role of feed back system are discussed for construction of tunnel, rock slope and deep excavation in hard ground such as layered ground conditions including weathered, soft and hard rocks.
The large planar failure has occurred in a rock cut slope of highway construction site in Boeun. This area is considered as unstable since the discontinuities whose orientations are similar to the orientation of the failure plane, are observed in many areas. Therefore, several analysis techniques such as SMR, stereographic analysis, limit equilibrium, numerical analysis, which are commonly used in rock slope stability analysis, are adopted in this area. In order to analyze the stress redistribution and nonlinear displacement caused by cut, which are not obtained in limit equilibrium method, the UDEC and shear strength reduction technique were used in this study Then the factors of safety evaluated by shear strength reduction technique and limit equilibrium were compared. In addition, the factor of safety under fully saturated slope condition was calculated and subsequently, the effect of the reinforcement was evaluated.
Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.
This is a Double-Track Railway tunnel in typical Tae-Gu black and gray shale forming part of the No.1 Line of the Tae-Gu Subway. The main fault zone at tunnel is a moderately to highly weathered and closely jointed zone, 0.5 m wide with associated paralled jointing which is slickensided and fractured. After excavation by blasting, the soft rocks should need to be reinforced with optimal supporting pattern which might be better redesigned through the consideration of the results of in-situ rock measurements at the field. Performances fo the field tests included Point Load Test, Schmidt Hammer Test, and field joint measurement gave the detail data for the optimum support design and safe excavation of the No.1 Line of Tae-Gu Subway at the No.1-7 consturction site adn the safety of this redesigned supports system was analysed by the FDM program FLAC.
Excavation of underground cavern and shaft was proposed for the construction of a ventilation facility in an urban area. A shaft connects the street-level air plenum to an underground cavern, which extends down approximately 46 m below the street surface. At the project site, the rock mass was relatively strong and well-defined joint sets were present. A kinematic block stability analysis was first performed to estimate the required reinforcement system. Then a 3-D discontinuum numerical analysis was conducted to evaluate the capacity of the initial support and the overall stability of the required excavation, followed by a 3-D continuum numerical analysis to complement the calculated result. This paper illustrates the application of detailed numerical analyses to the design of the required initial support system for the stability of underground hard rock mining at a relatively shallow depth.
암반으로 구성되어 있는 급경사($65^{\circ}{\sim}85^{\circ}$)비탈면이 장기간 안정한 상태로 유지되고 있는 자연현상을 고려할 때, 설계 및 초기 시공 단계에서 위와 유사한 지반 상태로 이루어진 깎기 암반비탈면에 대해 1:0.5(발파암 경사 기준)보다 급한 경사를 적용할 수 있을 것이다. 급경사로 설계 가능한 양호한 연속체 암반비탈면의 안정성을 검토하는 과정에서, 설계실무 측면에서 범용적인 암반강도정수 산정방법이 필요하게 되었다. Hoek 등(2002)이 수정 보완하여 발표한 Hoek-Brown 파괴기준과 GSI분류는 불연속구조의 영향을 충분히 고려한 암반특성화 시스템으로 평가되었으며, 응력변화에 따라 등가 Mohr-Coulomb 강도정수(등면적법)를 산출하는 방법을 제안하였다. 비탈면에서는 등가 M-C 강도정수가 최대구속응력(${{\sigma}^{\prime}}_{3max}$ 또는 수직응력)변화에 따라 민감하게 변화하므로 실무적으로 활용하기에 어려운 점이 있다. 이 연구에서는 양호한 연속체 암반비탈면에 대해 최대구속응력 범위이내에서 범용적으로 적용할 수 있는 강도정수산정방법(등각분할법)을 H-B 파괴기준을 응용하여 제안한다. 등각분할법 강도정수(A)의 타당성 및 적용성을 평가하기 위해, 연구대상 암반비탈면을 기존 실시설계 현장 인근에 있는 급경사 비탈면에서 암석종류별(화성암, 변성암, 퇴적암)로 선정하고, Hoek이 제시한 등가 M-C 강도정수(등면적법)들과 비교 분석하였다. 등면적법 및 등각분할법 등가 M-C 강도정수는 기본적인 자료인 기존 실시설계 현장의 실내 암석 삼축압축시험과 연구대상 암반비탈면의 불연속구조의 특성조사(Face Mapping)를 통해 RocLab 프로그램(H-B 파괴기준을 기본으로 전산화된 지반정수 산정 소프트웨어)을 활용하여 산정하였다. 산정된 등면적법 등가 M-C 강도정수는 상호 연동되어 점착력과 내부마찰각이 아주 크거나($45^{\circ}$ 이상) 작게 나타났다. 등각분할법 등가 M-C 강도정수는 등면적법 등가 M-C 강도정수의 중간 정도이며, 내부마찰각은 $30^{\circ}{\sim}42^{\circ}$의 범위를 보인다. 연구대상 암반비탈면의 등각분할법 강도정수(A)와 기존 실시 설계 현장에서 연구대상 암반비탈면과 유사한 암반상태(동일 등급 RMR)에 적용한 강도정수(B)와 비교 분석하고, 이 지반정수들로 적용한 비탈면 안정해석(한계평형해석과 유한요소해석) 결과를 통해 제안한 등각분할법의 적용성을 간접적으로 평가하였다. A와 B의 강도정수 차이는 10% 정도이다. 한계평형해석 결과(우기 기준), A적용 안전율(Fs)=14.08~58.22(평균 32.9), B적용 안전율(Fs)=18.39~60.04(평균 32.2)이며, 각 동일한 암석종류에 따라 상호 유사하게 나타났다. 유한요소 해석 결과, A적용 변위=0.13~0.65mm(평균 0.27mm), B적용 변위=0.14~1.07mm(평균 0.37mm)으로 매우 유사하다. H-B 파괴기준을 응용하여 등각분할법으로 산출한 지반 정수를 실무적인 전단강도로 적용할 수 있는 적용성 평가에서 유의미한 결과를 확인할 수 있었다.
The stability forecasting of rock slope is more difficult than soil slope because catching the sign of failure in monitoring is not easy and deformation of the rock is small in failure process. But in the rock slope, there is small deformation like crack propagation in rock itself and it accumulates gradually in failure process. If it is possible to detect the small change in the rock slope, we can know the failure time exactly. Because the individual signal is gathered in the acoustic emission monitoring, it is possible to monitoring the slope if many sound signal is accumulated. Detection test of acoustic emission was performed. Uniaxial, two types of bending test, and two plane shear test were done with various cement paste sample. Wave propagation velocity of uniaxial test sample was increased with curing time. Wave Analysis give us the result that there is a AE sign signal before the failure, the AE count is suddenly increased. And frequency level 125kHz before failure is changed to level 200-250kHz after failure. In two plane shear test we can catch the AE signal and can know the failure type from wave shape. Monitoring test site is tunnel slope in Hongcheon but special signal is not collected.
90년대 이후 지하 암반 구조물의 수요가 증가함에 따라 시공 전 설계 단계에서 요구되는 암반내 초기응력에 대한 정량적 정보를 얻기 위해 현장 초기 응력 측정이 광범위하게 수행되고 있다. 제안된 여러 측정법들 중 현장 적용성 면에서 큰 장점을 가진 수압파쇄법이 국내에서는 대표적으로 적용되고 있다. 본 논문에서는 평탄한 지형조건으로 이루어진 서울 중심부 편마암 지역내 저심도 구간의 11개 시추공을 대상으로 수압파쇄법에 의해 구해진 초기응력 측정자료와 수평응력의 크기, 방향성과 심도별 변화 그리고 측압계수 분포 등 과업구간 암반 내 초기응력장의 제반 분포 특성에 대해 논의하고자 한다.
현재 가장 많이 사용되고 있는 암반분류법인 RMR 이나 Q 분류법을 이용하여 조사단계에서 암반평가를 할 때, 평가요소의 하나인 RQD 값을 구하기 위한 시추작업이 제한적으로 이루어지고 있고, 또한 시공단계에서도 시추작업은 거의 이루어지지 않고 있는 실정이다. 실제 현장조사에서는 RQD값은 일반적으로 유추되거나 간접적인 방법을 통해서 이루어지고 있는 실정이다. 또한 암반내의 절리간격조사도 여러 군의 절리가 존재할 경우 그룹별 간격의 측정이 용이하지 않으며 불연속면의 연속성 등 불연속면의 특성에 관한 측정이 쉽지 않다는 것이다. 절리간격 요소도 설제로는 RQD와 중복되는 요소로서 시추 코아에 의존하지 않고 보다 쉽게 암반평가를 실시할 수 있는 새로운 암반분류법의 개발이 필요하다. 이를 위해서 요구되는 요소들을 측정하지 않고도 암반의 구조적인 형태와 절리의 거칠기와 변형정도로 표시되는 불연속면의 표면적인 조건만을 관찰함으로써 암반평가를 실시할 수 있는 방법인 GSI 의 요소들을 RMR 방법과 결합하여 새로운 암반분류법을 제시하고자 하는 것이다.
본 연구는 밀양과 울산지역에 건설 중인 2개소의 도로현장을 택하여 현장시험을 통한 암석과 토사가 혼재되어 있는 경우에 대한 토량환산계수의 측정 및 단위중량의 변화 등을 검토한 것이다. 시험결과, 암석과 토사가 동등한 비율로 혼합한 경우에 최대 단위중량을 얻을 수 있었으며, 암석만의 경우와 비교한 결과 2개소의 현장에서 각각 19%와 18%의 단위중량이 증가되었다. L값은 표준품셈에서 제시된 값보다 4~11% 크게 나타났으나, C값은 약 13~20% 낮게 나타냄을 알 수 있었다. 이는 최근 다짐장비의 대형화 및 다짐작업의 합리화에 기인되는 현상이므로 토공작업에서 이에 대한 고려가 있어야 할 것으로 판단된다. 또한 운반 시 암석과 토사가 5:5로 혼합되었을 때 가장 높은 단위중량을 나타내어 유리한 조건이 됨을 알 수 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.