• 제목/요약/키워드: Rock bridge

검색결과 101건 처리시간 0.021초

국립공원 Sequence 경관의 기호학과 계량심리학적 분석에 관한 연구 (A Study on the Semiology and Quantitative Psychological Analysis of Sequence Landscape of National Park)

  • 김세천
    • 한국조경학회지
    • /
    • 제19권3호
    • /
    • pp.55-71
    • /
    • 1991
  • The purpose of this thesis is to suggest objective basic data for the environmental design through the quantitative analysis of the visual quality included in the physical environment of Basemsagol valley sequence landscape. For this, visual volumes of physical elements have been evaluated by using the mesh analysis, spatial images structure of physical elements have been analyzed by factor analysis algorithm, and degree of visual quality have been measured mainly by questionnaires. Also, this study aims to understand semiotics and to grope the possibility of application to the sequence landscape assessment. A semiological approach suggests a new dimension in sequence landscape assessment, which is a contrast to the existing scientific evaluation methods. Result of this thesis can be summarized as follows. Visual volumes of the immediate vegetation, rock, bridge, road and distant vegetation are found to be the main factor determining the visual quality. Factors covering the spatial image of natural park sequence landscape have been found to be the overall synthetic evaluation, potentiality, natural quality, spatial, appeal and dignity. By using the control method for the number of factors, T.V. has been obtained as 40.22%. The characteristics of the semiological approach is qualitative, open, holistic, and experiential, whereas that of the scientific approach is quantitative, closed, reductive, and experimental.

  • PDF

다양한 예측기법을 이용한 현장타설말뚝의 최적길이 산정 (Estimation of Optimum Pile length Using Various Prediction)

  • 최영석;임형준;송명준;장학성
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.700-707
    • /
    • 2008
  • As plan connecting island to island or island to land is needed, a lot of long-span bridge is being designed lately in Southern part of Korea. With development of pile equipment, overhanging large-scaled concrete pile are adopted to foundation type of main tower or pylon. About the number of 15~30 group piles per tower foundation is designed to resist long-spaning super-structure load, but by restricted condition of site investigation cost, a few boring-hole tests are performed to identify sub-ground layers. Up to now, direct-curved method connecting two or three known boring logs and representative interval method are usually used to evaluate unknown depth and rock properties at locations where piles are constructed. Because this approach is not logical and so rough, much difference occurs between designed length of piles and real length of it. In this paper, using a lot of various prediction method(reciprocal distance method, inverse square distance method and kriging method etc.), we suggest optimum length of group piles.

  • PDF

Biology of Porphyra pulchella sp. nov. from Australia and New Zealand

  • Ackland, Jillian C.;West, John A.;Scott, Joseph;Zuccarello, Giuseppe C.;Broom, Judy
    • ALGAE
    • /
    • 제21권2호
    • /
    • pp.193-208
    • /
    • 2006
  • Porphyra pulchella sp. nov. Ackland, West, Scott and Zuccarello was obtained at Mimosa Rock National Park, New South Wales; Westgate Bridge, Victoria, Australia; and Waihau Bay, North Island, New Zealand. It occurs mainly in mangrove habitats and is very small (± 1 mm) in field collections. In laboratory culture at 21 ± 2°C tiny blades (0.5-3.0 mm) reproduced exclusively by archeospores liberated from vegetative cells of the upper sector of the blades. The archeospores displayed amoeboid and gliding motility once discharged. At 14 ± 2°C the blades grew to 25 mm and produced longitudinal spermatangial streaks mixed with ‘phyllosporangial’ streaks. The discharged ‘phyllospores’ showed amoeboid motility and germinated forming asexual blades. A conchocelis phase with typical bangiophycidean pit connections was observed in blade cultures after 8-10 weeks at 14 ± 2°C. Conchocelis filaments produced conchosporangia and these released amoeboid conchospores that developed into archeosporangiate blades. Molecular data indicate that all 3 isolates are genetically identical.

북한산 조계동 송계별업(松溪別業) 정원 복원을 위한 경관해석 (A Study on the Landscape Interpretation of Songge Byeoleop(Korean Villa) Garden at Jogyedong, Mt. Bukhansan near Seoul for the Restoration)

  • 노재현;송석호;조장빈;심우경
    • 한국전통조경학회지
    • /
    • 제36권4호
    • /
    • pp.1-17
    • /
    • 2018
  • 문헌연구와 현장연구를 바탕으로 17C 중반 북한산 조계동(曹溪洞)에 조영된 송계별업의 장소성과 별업의 정원상 및 경관상을 추적하여 송계별업 원림의 복원을 전제로 한 경관해석을 시도한 본 연구의 결과는 다음과 같다. 송계별업은 인조의 3남이자 효종의 아우인 인평대군 이요가 인조 24년에 조성한 왕가별업이다. 본제는 직선거리로 약 7km 떨어진 건덕방 타락산 아래의 궁집 석양루로서, 대군이라는 조영주체의 신분적 특수성 때문에 송계별업 또한 단청 및 건물의 제도가 매우 화려하였을 것으로 추정된다. 이곳의 장소정체성이자 핵심경관은 구천은폭으로 중국 여산폭포에 비견되는 다층의 폭포를 갖는 관폭과 청음의 공간이었으며, 별업 멸실 이후에는 왕릉 부석장으로 역할과 부석금표처의 장소이미지가 더해졌다. 조계동천을 중심으로 한 송계별업 내원은 구천은폭을 비롯하여 한담과 창벽 등의 자연경관과 비홍교, 보허각, 영휴당 그리고 계당 등의 인공요소가 절묘하게 조화되었다. 또 현존하는 '송계별업'과 '구천은폭' 바위글씨는 별업원림의 조영자와 영역성을 상징하는 경관언어이자 장소 표식으로, 보허각을 중심으로 비홍교, 창벽, 한담 등의 경물명을 바위에 세기고 의미를 부여하였다. 특히 시각적 종점의 역할을 하는 구천은폭은 캐스캐이드형의 다단폭포로서 그 하부는 말구유 형상의 절리상 포트홀의 지형경관적 특성을 보인다. 한편 외원은 별업 정문과 행랑채 성격을 갖는 공간과 내 외원 양자를 연결시켜주는 계당과 돌다리 그리고 기거를 목적으로 한 영휴당 등으로 구분된다. 영휴당에서는 보허각만 관망되는 반면 보허각에서는 구천은폭을 비롯하여 영휴당 등 사방의 조망이 가능하도록 한 이원적 조망 틀짜임이 읽혀진다. 또한 비홍교에서 구천은폭과 창벽 그리고 한담을 상호 부감 앙시하게 되며, 비홍교를 건너 보허각에 올라 구천은폭과 조계동천을 바라보는 단계적 행위를 체험케함으로써 속세에서 선계로 이행되는 시각구성을 보여주고 있다.

A caving self-stabilization bearing structure of advancing cutting roof for gob-side entry retaining with hard roof stratum

  • Yang, Hongyun;Liu, Yanbao;Cao, Shugang;Pan, Ruikai;Wang, Hui;Li, Yong;Luo, Feng
    • Geomechanics and Engineering
    • /
    • 제21권1호
    • /
    • pp.23-33
    • /
    • 2020
  • An advancing cutting roof for gob-side entry retaining with no-pillar mining under specific geological conditions is more conducive to the safe and efficient production in a coalmine. This method is being promoted for use in a large number of coalmines because it has many advantages compared to the retaining method with an artificial filling wall as the gateway side filling body. In order to observe the inner structure of the gateway cutting roof and understand its stability mechanism, an equivalent material simulation experiment for a coalmine with complex geological conditions was carried out in this study. The results show that a "self-stabilization bearing structure" equilibrium model was found after the cutting roof caving when the cut line deviation angle was unequal to zero and the cut height was greater than the mining height, and the caving roof rock was hard without damage. The model showed that its stability was mainly controlled by two key blocks. Furthermore, in order to determine the optimal parameters of the cut height and the cut line deviation angle for the cutting roof of the retaining gateway, an in-depth analysis with theoretical mechanics and mine rock mechanics of the model was performed, and the relationship between the roof balance control force and the cut height and cut line deviation angle was solved. It was found that the selection of the values of the cut height and the cut line deviation angle had to conform to a certain principle that it should not only utilize the support force provided by the coal wall and the contact surface of the two key blocks but also prevent the failure of the coal wall and the contact surface.

전기전도도를 이용한 어육의 선도판정 (Determination of Freshness of Fish Meat using Electric Conductivity Meter)

  • 이병호
    • 한국수산과학회지
    • /
    • 제22권5호
    • /
    • pp.219-227
    • /
    • 1989
  • 효율적이고 신속한 어육의 선도측정을 위하여 시중에 유통되고 있는 몇가지 주요어종을 선정하여 이들의 선도를 저장온도에 따른 전기전도도 (electric conductivity)를 교류용 Kohlraush bridge, Wien bridge를 사용하여 제작한 Conductivity meter로 측정하여 다음과 같은 결과를 얻었다. 1. 냉동어육의 해동후 부패초기의 electric conductivity는 $6,100\pm({\mu}u/cm)$이었고 비동결어육인 방어와 쥐노래미 및 고등어의 부패초기 electric conductivity는 $20^{\circ}C$에서 $5,100\~5,400({\mu}u/cm)$로 냉동육에 비하여 약 $1,000({\mu}u/m)$낮았다. 2. VBN과 electric conductivity는 정상관관계를 가지며 부패초기 electric conductivity값이 나타났을 때의 VBN은 $30\~35mg\%$였다. 3. 적색육어인 고등어는 백색육보다 사후 시간의 경과와 더불어 electric conductivity의 온도의존성이 크다는 것을 알았다. 4. 고등어육의 electric conductivity를 $15^{\circ}C(\pm1^{\circ}C),\;20^{\circ}C(\pm1^{\circ}C),\;30^{\circ}C(\pm1^{\circ}C)$에서 저장시간과 관계를 측정, 온도계수 $Q_{10}=2.34$를 얻어 실측값과 유사함을 확인하였다. 5. 어류의 선도를 측정하는데 10초 내외의 짧은 시간에 비교적 정확한 결과를 얻을 수 있고 어육의 선도변화에 영향을 주는 요인들을 포괄적으로 지시하는 휴대용 Electric conductivity meter는 그 효용성이 높을 것으로 기대된다.

  • PDF

소형어선의 좌초사고 분석과 사고 저감을 위한 제언 (Analysis of Grounding Accidents in Small Fishing Vessels and Suggestions to Reduce Them)

  • 정대율
    • 해양환경안전학회지
    • /
    • 제28권4호
    • /
    • pp.533-541
    • /
    • 2022
  • 최근 5년간 발생한 해양사고를 분석한 결과, 소형선박은 전체 좌초사고의 77.0 %를 차지하고, 인명사상도 66.1%로서 매우 높았다. 목포지방해양안전심판원은 2021년 72건을 재결하였고, 이중 좌초사건은 10건이었다. 그리고 좌초사건 중 8건은 소형어선에서 발생하였다. 본 논문은 2021년 목포지방해양안전심판원에서 재결하였던 소형어선에서 발생한 8건의 좌초사고에 대해 분석하였다. 이 소형어선의 좌초사고는 맑은 날씨에 시정이 2~4마일로 양호하고, 파고 1미터 이내로 양호한 해상상태에서 발생한 것을 파악되었다. 그리고 좌초사고의 주요 원인은 피로에 따른 졸음 운항, 경계 소홀, 선위확인 소홀, GPS Plotter 과신, 해도도식 및 조석간만의 차에 대한 이해부족 등인 것으로 나타났다. 이에 소형어선의 좌초사고 저감을 위해 다음의 방안을 제시하였다. 첫째, 갑판부 항해당직 부원교육을 이수한 선원이 선장을 보좌하도록 하여야 한다. 둘째, 졸음 방지용 경보장치는 조타실에 설치하여야 한다. 셋째, GPS Plotter의 성능기준과 최신화를 위해 제도는 마련되어야 한다. 마지막으로, 소형어선 선장은 주기적으로 해도도식과 기초 지문항법을 숙지할 수 있도록 교육을 받아야 한다.

3차원 레이저 스캐너 및 BIM을 활용한 터널 과대.과소 굴착 평가 (Assessment of over / under-break of tunnel utilizing BIM and 3D laser scanner)

  • 박정준;신재철;황주환;이강현;서형준;이인모
    • 한국터널지하공간학회 논문집
    • /
    • 제14권4호
    • /
    • pp.437-451
    • /
    • 2012
  • 최근 3차원 레이저 스캐너는 토목 분야의 적용에 관한 다수의 연구가 수행되고 있으며, 연구 분야 역시 터널 및 교량, 토공량 산정, 시공검측, 암반절리 측정 등 여러 분야에서 이루어지고 있다. 그 중 터널 시공 시 여굴량 및 미굴량을 산정함에 있어 3차원 레이저 스캐너를 활용하는 연구가 점차적으로 이루어지고 있으며, 지금까지의 연구는 스캔 데이터와 2차원 CAD 도면과의 비교를 통해 여굴량 및 미굴량을 산정하는 방식으로 이루어 졌다. 그러나 터널이 비교적 단순한 형상의 구조물이라 하더라도 3차원 형상의 구조물로 정확한 여굴량 및 미굴량을 산정하기 위해서는 3차원적인 비교가 필요하다. 본 연구에서는 3차원 레이저 스캐너로 획득한 스캔 데이터와 3차원 설계 모델링인 BIM을 활용하여 시공시 발생하는 여굴량 및 미굴량을 산정하는 시공오차 평가 프로그램을 개발하였으며, 이를 위한 효율적인 스캔 데이터의 처리 프로세스를 제안하였다. 또한 실제 현장에 3차원 레이저 스캐너를 적용하여 시공오차를 산정하였으며, 프로그램의 성능을 검증하였다.

Response of a frame structure on a canyon site to spatially varying ground motions

  • Bi, Kaiming;Hao, Hong;Ren, Weixin
    • Structural Engineering and Mechanics
    • /
    • 제36권1호
    • /
    • pp.111-127
    • /
    • 2010
  • This paper studies the effects of spatially varying ground motions on the responses of a bridge frame located on a canyon site. Compared to the spatial ground motions on a uniform flat site, which is the usual assumptions in the analysis of spatial ground motion variation effects on structures, the spatial ground motions at different locations on surface of a canyon site have different intensities owing to local site amplifications, besides the loss of coherency and phase difference. In the proposed approach, the spatial ground motions are modelled in two steps. Firstly, the base rock motions are assumed to have the same intensity and are modelled with a filtered Tajimi-Kanai power spectral density function and an empirical spatial ground motion coherency loss function. Then, power spectral density function of ground motion on surface of the canyon site is derived by considering the site amplification effect based on the one dimensional seismic wave propagation theory. Dynamic, quasi-static and total responses of the model structure to various cases of spatially varying ground motions are estimated. For comparison, responses to uniform ground motion, to spatial ground motions without considering local site effects, to spatial ground motions without considering coherency loss or phase shift are also calculated. Discussions on the ground motion spatial variation and local soil site amplification effects on structural responses are made. In particular, the effects of neglecting the site amplifications in the analysis as adopted in most studies of spatial ground motion effect on structural responses are highlighted.

Determination of equivalent blasting load considering millisecond delay effect

  • Song, Zhan-Ping;Li, Shi-Hao;Wang, Jun-Bao;Sun, Zhi-Yuan;Liu, Jing;Chang, Yu-Zhen
    • Geomechanics and Engineering
    • /
    • 제15권2호
    • /
    • pp.745-754
    • /
    • 2018
  • In the analysis of the effects of rock tunnel blasting vibration on adjacent existing buildings, the model of simplified equivalent load produces higher calculation result of vibration, due to the lack of consideration of the millisecond delay effect. This paper, based on the static force equivalence principle of blasting load, proposes a new determination method of equivalent load of blasting vibration. The proposed method, based on the elastic-static force equivalence principle of stress wave, equals the blasting loads of several single blastholes in the same section of millisecond blasting to the triangle blasting load curve of the exploded equivalent elastic boundary surface. According to the attenuation law of stress wave, the attenuated equivalent triangle blasting load curve of the equivalent elastic boundary is applied on the tunnel excavation contour surface, obtaining the final applied equivalent load. Taking the millisecond delay time of different sections into account, the time-history curve of equivalent load of the whole section applied on the tunnel excavation contour surface can be obtained. Based on Sailing Tunnel with small spacing on Sanmenxia-Xichuan Expressway, an analysis on the blasting vibration response of the later and early stages of the tunnel construction is carried out through numerical simulation using the proposed equivalent load model considering millisecond delay effect and the simplified equivalent triangle load curve model respectively. The analysis of the numerical results comparing with the field monitoring ones shows that the calculation results obtained from the proposed equivalent load model are closer to the measured ones and more feasible.