• Title/Summary/Keyword: Rock bolts

Search Result 69, Processing Time 0.02 seconds

A Study on the Validity of 2-Dimensional Analysis of Rock Bolt (록볼트의 2차원 수치해석에 대한 타당성 검토)

  • Seok Jeong Hyeon;Kim Bo Byun;Sik Yang Hyung
    • Tunnel and Underground Space
    • /
    • v.14 no.6 s.53
    • /
    • pp.423-428
    • /
    • 2004
  • The stability of tunnels is usually analyzed as plain strain condition and rock bolts are assumed as 2 dimensional equivalent continuum structures. In this study, 2 and 3 dimensional numerical analyses were conducted to verify the validity of 2 dimensional analysis of rock bolts. Since the results of 2 dimensional analysis showed more than $10\%$ differences in poor rocks, it seems that 3 dimensional analysis is required in poor rocks.

The Pull-out Behavior of Rock Bolts According to Grout Strength during Rock Bolt Pull-out (록볼트 인발 시 그라우트 강도에 따른 인발 거동)

  • Seongmin Jang;Hyuksang Jung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.4
    • /
    • pp.13-22
    • /
    • 2023
  • In this paper, through experimental research, the period when rock bolts exert support effects is presented as grout strength and through numerical analysis, the rock bolt pull-out behavior according to ground conditions and strength reduction factors is analyzed. As a result, it is determined that rock bolts exhibit their reinforcing effect at a grout strength of 5 MPa (cured for 18 hours). The influence of the boundary interface strength reduction factor was found to be significant for rock bolt displacement in weak ground conditions, for shear stress between grout and ground in highly elastic ground conditions, and for grout stress in all ground conditions. These findings are expected to contribute to the establishment of specific standards for rock bolt testing and numerical analysis, and to facilitate improved design and implementation of rock bolt reinforcement.

Numerical Analysis of the Visco-plastic Behavior of Rock Mass Considering Continuum Joints and Rock Bolt Elements (연속체 절리와 록볼트 요소를 고려한 암반의 점소성 거동에 관한 수치해석)

  • 노승환;이정인;이연규
    • Tunnel and Underground Space
    • /
    • v.14 no.3
    • /
    • pp.215-228
    • /
    • 2004
  • Rock mass contains discontinuities such as faults and joints, and their mechanical properties and spatial distribution dominate the stability of rock mass. Because the deformation of rock mass occurs discontinuities in many cases. However in the case of poor quality rock mass under high stresses, the deformation along intact rock can also influence the structure's stability. In this study, two dimensional finite element program was developed with a rheological model to analyze the stability of the structure excavated in jointed rock mass. The “equivalent material” approach was used assuming intact rock, joints and rock bolts as visco-plastic materials. The program was verified by analysing an intact rock model, a jointed rock mass model and a reinforced jointed rock mass model. The displacement was examined in each model with changing the intact rock behaviour as elastic and visco-plastic. In the case of poor quality rock mass under high stresses, e assumption of visco-plastic behaviour of intact rock resulted in larger displacement than when assuming elastic behaviour for intact rock. Therefore it is recommended to add intact rock's visco-plastic behaviour to the existing model, which only assumes visco-plastic behaviour of joints and rock bolts.

Stability Assessment of Concrete Lining and Rock Bolts of the Adjacent Tunnel by Blast-Induced Vibration (발파진동이 인접한 터널의 콘크리트 라이닝과 록볼트의 안정성에 미치는 영향평가)

  • Jeon, Sang-Soo;Kim, Doo-Seop;Jang, Yang-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.10
    • /
    • pp.33-45
    • /
    • 2007
  • In this study, the blast-induced vibration effects on the structural stability of the adjacent tunnel were estimated with respect to the allowable peak particle velocity (PPV). The blasting distance from the tunnel satisfying the allowable PPV was estimated based on the analytical solutions, United States Bureau of Mines (USBM) suggestions, and the equations used in the subway in Seoul. The allowable blasting distance was estimated by using finite difference analysis (FDA) and the behavior of the concrete lining and rock bolts was examined and the stability of those was estimated during the blast. Research results show that the blast-induced vibration effects on the structural stability are negligible for the concrete lining but relatively large for the rock bolts.

A Study of the Optimum Installation Number of Face Bolts Using Laboratory Tests and Numerical Analysis (실내실험 및 수치해석을 이용한 막장볼트의 최적 타설 개수에 관한 연구)

  • Seo, Kyoung-Won;Kazuo, Nishimurn;Kim, Chang-Young
    • Tunnel and Underground Space
    • /
    • v.16 no.6 s.65
    • /
    • pp.467-475
    • /
    • 2006
  • The use of face bolt method has been increasing abroad recently. Hence, many tests and measurements are being conducted and reported. Also, it is well hewn that determination of the installation number of foe bolts in the design stage is very difficult due to difference of the ground condition and the type of a bolt to be used. First of all, the type, the number, etc. of bolts used in various tunnel construction sites, investigated, are analyzed. The relationship between bolt and ground condition could not be found because bolts have been used with the other support methods in many cases. In the laboratory test and numerical analysis based on the site investigation, the behavior of ground and pipes installed on the tunnel face to support has been examined. Especially, the installed number is focused on. According to the result of tests, the surface settlement and the axial displacement of the face decrease exponentially as the number of installed bolts increases.

Defect ratio evaluation of the rock bolt grouting using the reflection method of guided ultrasonic waves (유도초음파의 반사법을 이용한 록볼트 그라우팅의 결함비율 평가)

  • Yu, Jung-Doung;Bae, Myeong-Ho;Han, Shin-In;Lee, In-Mo;Lee, Jong-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.221-232
    • /
    • 2008
  • Rock bolts have been installed into rockmass as a main support system. In order to evaluate the rock bolt integrity using non-destructive technique, the transmission method of the guided ultrasonic wave has been successfully performed. For the transmission method, however, the source for the generation o# guided ultrasonic waves should be installed at the end of the steel bar during construction of the rock bolt in the field. The purpose of this study is to suggest a reflection method that the source and the receiver are installed on the head of the steel bar. The reflection method is compared with the transmission method using non-embedded rock bolts and rock bolts embedded in concrete block. In this experiment, the piezo disc element is used as the source and the AE sensor is used as the receiver. The wavelet transform is applied to determine the energy velocity. The experimental studies show that the reflection method produces almost identical value of the transmission method, and the energy velocity increases with the defect ratio. This study suggests that the reflection method of the guided ultrasonic wave may be a suitable method fur the rock bolt integrity evaluation in the field.

  • PDF

Rock Bolt Integrity Assessment in Time-Frequency Domain : In-situ Application at Hard Rock Site (유도파를 이용한 시간-주파수 영역 해석을 통한 록볼트 건전도 실험의 경암지반 현장 적용성 평가)

  • Lee, In-Mo;Han, Shin-In;Min, Bok-Ki;Lee, Jong-Sub
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.12
    • /
    • pp.5-12
    • /
    • 2009
  • As rock bolts become one of the main support systems in tunnels and underground structures, the integrity of the rock bolts affects the safety of these structures. The purpose of this study is the evaluation of rock bolt integrity using wavelet transforms of the guided ultrasonic waves by using transmission test in the field. After several rock bolts with various defect ratios are embedded into a large scale concrete block and rock mass, guided waves are generated by a piezo disk element and measured by an acoustic emission (AE) sensor. The captured signals are analyzed in the time-frequency domain using the wavelet transform based on a Gabor wavelet. Peak values in the time-frequency domain represent the interval of travel time of each echo. The energy velocities of the guided waves increase with an increase in the defect ratio. The suitable curing time for the evergy velocity analysis is proposed by the laboratory test, and in-situ tests are performed in two tunnelling sites to verify the applicability of rock bolt integrity tests performed after proposed curing time. This study proves that time-frequency domain analysis is an effective tool for the evaluation of the rock bolt integrity.

Study on the Effect of Bolt and Sub-bench on the Stabilization of Tunnel Face through FEM Analysis (FEM해석에 의한 막장볼트 및 보조벤치의 막장안정성 효과에 관한 연구)

  • Kim, Sung-Ryul;Yoon, Ji-Sun
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.427-435
    • /
    • 2008
  • In this paper, review was made for the excavation method and optimum bench length for unstable tunnel face in case of rock classification type V in order to make the best use of in-situ bearing capacity. 3D FEM analyses were performed to investigate the influences on the tunnel face and adjacent area with regard to the pattern and number of bolts when face bolts were used as a supplementary measure. As a result of this study, full section excavation method with sub-bench is effective in reducing the displacement greatly due to early section closure. Displacement-resistant effects in accordance with the bolting patterns are grid type, zig-zag type and then circular type in order of their effect. And horizontal extrusion displacement of tunnel face reduces as the number of bolts increase. A grid type face bolt covering $1.5m^2$ of tunnel face could secure the face stability in case of full section excavation method with sub-bench.

Study on anchorage effect on fractured rock

  • Wang, Jing;Li, Shu-Cai;Li, Li-Ping;Zhu, Weishen;Zhang, Qian-Qing;Song, Shu-Guang
    • Steel and Composite Structures
    • /
    • v.17 no.6
    • /
    • pp.791-801
    • /
    • 2014
  • The effects of anchor on fractured specimens in splitting test are simulated by DDARF method, the results of which are compared with laboratory test results. They agree well with each other. The paper contents also use the laboratory model test. The main research objects are three kinds of specimens, namely intact specimens, jointed specimens and anchored-jointed specimens. The results showed that with the joint angle increased, the weakening effects of jointed rock mass are more obvious. At these points, the rock bolts' strengthening effects on the specimens have become more significant. There is a significant impact on the failure modes of rock mass by the joint and the anchorage.

Anchorage mechanism and pullout resistance of rock bolt in water-bearing rocks

  • Kim, Ho-Jong;Kim, Kang-Hyun;Kim, Hong-Moon;Shin, Jong-Ho
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.841-849
    • /
    • 2018
  • The purpose of a rock bolt is to improve the mechanical performance of a jointed-rock mass. The performance of a rock bolt is generally evaluated by conducting a field pullout test, as the analytical or numerical evaluation of the rock bolt behavior still remains difficult. In this study, wide range of field test was performed to investigate the pullout resistance of rock bolts considering influencing factors such as the rock type, water bearing conditions, rock bolt type and length. The test results showed that the fully grouted rock bolt (FGR) in water-bearing rocks can be inadequate to provide the required pullout resistance, meanwhile the inflated steel tube rock bolt (ISR) satisfied required pullout resistance, even immediately after installation in water-bearing conditions. The ISR was particularly effective when the water inflow into a drill hole is greater than 1.0 l/min. The effect of the rock bolt failure on the tunnel stability was investigated through numerical analysis. The results show that the contribution of the rock bolt to the overall stability of the tunnel was not significant. However, it is found that the rock bolt can effectively reinforce the jointed-rock mass and reduce the possibility of local collapses of rocks, thus the importance of the rock bolt should not be overlooked, regardless of the overall stability.