• 제목/요약/키워드: Robot Automation system

검색결과 383건 처리시간 0.026초

복수로봇 시스템의 동력학적 연구-대상물과 닫힌 체인을 형성할때의 문제- (Dynamic Analysis of Multi-Robot System Forcing Closed Kinematic Chain)

  • 유범상
    • 대한기계학회논문집
    • /
    • 제19권4호
    • /
    • pp.1023-1032
    • /
    • 1995
  • The multiple cooperating robot system plays an important role in the research of modern manufacturing system as the emphasis of production automation is more on the side of flexibility than before. While the kinematic and dynamic analysis of a single robot is performed as an open-loop chain, the dynamic formulation of robot in a multiple cooperating robot system differs from that of a single robot when the multiple cooperating robots form a closed kinematic chain holding an object simultaneously. The object may be any type from a rigid body to a multi-joint linkage. The mobility of the system depends on the kinematic configuration of the closed kinematic chain formed by robots and object, which also decides the number of independent input parameters. Since the mobility is not the same as the number of robot joints, proper constraint condition is sought. The constraints may be such that : the number of active robot joints is kept the same as mobility, all robot joints are active and have interrelations between each joint forces/torques, two robots have master-slave relation, or so on. The dynamic formulation of system is obtained. The formulation is based on recursive dual-number screw-calculus Newton-Eulerian approach which has been used for single robot analysis. This new scheme is recursive and compact symbolically and may facilitate the consideration of the object in real time.

점용접 및 아크용접 겸용 로봇 자동화시스템 개발 (Development of Spot Welding and Arc Welding Dual Purpose Robot Automation System)

  • 이용중;김태원;이형우
    • 한국기계가공학회지
    • /
    • 제3권4호
    • /
    • pp.73-80
    • /
    • 2004
  • A dual purpose robot automation system is developed for both arc welding and spot welding by one robot within a cell. The need for automation of both arc welding and spot welding processes is urgent while the production volume is not so big as to accommodate separate station for the two processes. Also, space is too narrow for separate station to be settled down in the factory. A spot welding robot is chosen and the function for arc welding are implemented in-house at cost of advanced functions. For the spot welding, a single pole type gun is used and the robot has to push down the plate to be welded, which causes the robot positioning error. Therefore, position error compensation algorithm is developed. The basic functions for the arc welding processes are implemented using the digital I/O board of robot controller, PLC, and A/D conversion PCB. The weaving pattern is taught in meticulously by manual teach. A fixture unit is also developed for dual purpose. The main aspects of the system is presented in this paper especially in the design and implementation procedure. The signal diagrams and sequence logic diagrams are also included. The outcome of the dual purpose welding cell is the increased productivity and good production stability which is indispensable for production volume prediction. Also, it leads to reduction of manufacturing lead time.

  • PDF

고층건물 외벽 유지보수 건설로봇 시스템 개발을 위한 청소공정 작업절차 분석 (Facade Cleaning Process Analysis For Construction Robot System Design of High-rise Building External wall Maintenance)

  • 김대건;김복규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.77-79
    • /
    • 2011
  • As residents and building owners demand maintenance that is required to achieve sustainable building performance, efficient building management methods are required. Even though the demand for maintenance systems is increasing, current maintenance work for high-rise buildings mostly uses conventional ropes and gondolas that pose a high risk of accidents and exhibit poor performance and efficiency. Thus, there is an urgent need to develop an automation robot system that can reduce accidents and improve the maintenance efficiency of the conventional high-rise building façade maintenance system. As a preceding work for the development of an automation robot system, this study classified and analyzed the work processes of actual construction sites and proposed basic techniques for the work mechanisms of the robot system by investigating the motions of cleaning workers.

  • PDF

Design of Emergency Fire Fighting and Inspection Robot Riding on Highway Guardrail

  • Ma, Xiaotong;Li, Xiaochen;Liu, Yanqiu;Tao, Xueheng
    • 한국멀티미디어학회논문지
    • /
    • 제25권6호
    • /
    • pp.833-843
    • /
    • 2022
  • Based on the problems of untimely Expressway fire rescue and backward traditional fire rescue methods, an emergency fire fighting and inspection robot riding on expressway guardrail is designed. The overall mechanical structure design of emergency fire fighting and inspection robot riding on expressway guardrail is completed by using three-dimensional design software. The target fire detection is realized by using the target detection algorithm of Yolov5; By selecting a variety of sensors and using the control method of multi algorithm fusion, the basic function of robot on duty early warning is realized, and it has the ability of intelligent fire extinguishing. The BMS battery charging and discharging system is used to detect the real-time power of the robot. The design of the expressway emergency fire fighting and inspection robot provides a new technical means for the development of emergency fire fighting equipment, and improves the reliability and efficiency of expressway emergency fire fighting.

THE DEVELOPMENT OF A CURTAIN WALL INSTALLATION ROBOT THROUGH THE ANALYSIS OF EXISTING CONSTRUCTION PROCESSES

  • Seung-Nam Yu ;Chong-Ho Choi ;Seung-Yel Lee;Chang-Soo Han
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.520-526
    • /
    • 2005
  • Automation in construction has been restricted to special classes of tasks. Curtain walls can be handled like standard construction materials; they are heavy but breakable, and are large but require precise installation. These characteristics make the installation of curtain walls ideal for robotic automation. There are two methods for developing construction robots: The first is approving the robot performance and applying it to the current construction methods. The second is admitting the limitation of the current robot technology and trying to optimize the current method of construction to apply the robot system. In this study, we derived the performance requirements of a curtain wall-installation robot. We also tested this robot at a real construction site and evaluated its performance. Finally, the results were analyzed, and we proposed additional research.

  • PDF

Gait Programming of Quadruped Bionic Robot

  • Li, Mingying;Jia, Chengbiao;Lee, Eung-Joo;Feng, Yiran
    • Journal of Multimedia Information System
    • /
    • 제8권2호
    • /
    • pp.121-130
    • /
    • 2021
  • Foot bionic robot could be supported and towed through a series of discrete footholds and be adapted to rugged terrain through attitude adjustment. The vibration isolation of the robot could decouple the fuselage from foot-end trajectories, thus, the robot walked smoothly even if in a significant terrain. The gait programming and foot end trajectory algorithm were simulated. The quadruped robot of parallel five linkages with eight degrees of freedom were tested. The kinematics model of the robot was established by setting the corresponding coordinate system. The forward and inverse kinematics of both supporting and swinging legs were analyzed, and the angle function of single leg driving joint was obtained. The trajectory planning of both supporting and swinging phases was carried out, based on the control strategy of compound cycloid foot-end trajectory planning algorithm with zero impact. The single leg was simulated in Matlab with the established kinematic model. Finally, the walking mode of the robot was studied according to bionics principles. The diagonal gait was simulated and verified through the foot-end trajectory and the kinematics.

로봇 위빙에 의한 리프팅 러그 다층 용접법 개발 (Development of Multi-pass Welding Method for Lifting Lug by Robot Weaving)

  • 김영주;김강욱;김석형;강성원;김수호
    • Journal of Welding and Joining
    • /
    • 제25권6호
    • /
    • pp.44-52
    • /
    • 2007
  • A welding process of a lifting lug for lifting heavy objects is one of the important welding processes directly related to the safety in shipbuilding. Welding a lifting lug is done in the manually and takes about forty minutes. Working environment for the lifting lug welding is very poor due to an radiant heat and a harmful fume. The purpose of this study is to develop methods of multi-pass welding using the lifting lug welding robot system. This study shows robot welding methods to achieve proper corner, straight and connection welding and an effectiveness of application.

Development of a Dual-arm Collaborative Robot System for Chemical Drum Assembly

  • Gi-Seong Kim;Sung-Hun Jeong;Shi-Baek Park;Han-Sung Kim
    • 한국산업융합학회 논문집
    • /
    • 제26권4_1호
    • /
    • pp.545-551
    • /
    • 2023
  • In this paper, a robot automation methodology for chemical drum assembly in semiconductor industries are presented. Robot automation is essential to resolve safety issues in which operators are directly or indirectly exposed to chemicals or fumes in assembling dispense heads on chemical drums. However, the chemical drum assembling process involves complex and difficult tasks, such as mating male/female keycodes and fastening screws with large-diameter, which may be very difficult to be performed by a single-arm robot with a commercial rigid F/T sensor. In order to solve the problems, a method for assembling a chemical drum using dual-arm collaborative robot system, compliance F/T sensor, robot vision and gripper is presented.

곤돌라형 외벽 유지관리 로봇의 이동/작업 메커니즘 및 플랫폼 개발 (Development of Gondola-type Building Management Robot Platform and Mechanism for Moving/Tasking on Building Outer-wall)

  • 함영복;박성재
    • 한국정밀공학회지
    • /
    • 제30권4호
    • /
    • pp.375-382
    • /
    • 2013
  • Down through the years, human needs and desires have required a robot system to work at hazardous environments instead. Current painting task is costly and laborious, and it exposes workers to significant health and safety risks. Automation system offers potential improvement in this area and is especially well suited to the outer-wall painting tasks in concrete structures. This paper introduces the result of gondola-type building management robot(G-BMR) platform and mechanism for moving/tasking on building outer-wall for the outer-wall painting. Its technical and economic feasibility are conducted, and it is concluded that developing G-BMR is physically and economically feasible in this research. And we discuss about the future of G-BMR and automation in construction field.

Field Robot의 모델링과 구축에 관한 연구 (A study on modeling and construction of Field Robot)

  • 임태형;양순용;이병룡;안경관;김승수
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2002년도 추계학술대회 논문집
    • /
    • pp.481-486
    • /
    • 2002
  • Automation of Field Robot has many advantages for efficiency and convenience. In this paper, mathematical equation of field robot is established and automation system is constructed. Hydraulic and Dynamic equation of field robot are constructed in this paper. Inputs of system are angle data from each link (boom, arm, bucket, swing) and pressure data from in, out port of each cylinder. Outputs of system are voltage into electo-proportional valve.

  • PDF