• Title/Summary/Keyword: Roadway Design

Search Result 154, Processing Time 0.066 seconds

Coordinated supporting method of gob-side entry retaining in coal mines and a case study with hard roof

  • Liu, X.S.;Ning, J.G.;Tan, Y.L.;Xu, Q.;Fan, D.Y.
    • Geomechanics and Engineering
    • /
    • v.15 no.6
    • /
    • pp.1173-1182
    • /
    • 2018
  • The coal wall, gob-side backfill, and gangues in goaf, constitute the support system for Gob-side entry retaining (GER) in coal mines. Reasonably allocating and utilizing their bearing capacities are key scientific and technical issues for the safety and economic benefits of the GER technology. At first, a mechanical model of GER was established and a governing equation for coordinated bearing of the coal-backfill-gangue support system was derived to reveal the coordinated bearing mechanism. Then, considering the bearing characteristics of the coal wall, gob-side backfill and gangues in goaf, their quantitative design methods were proposed, respectively. Next, taking the No. 2201 haulage roadway serving the No. 7 coal seam in Jiangjiawan Mine, China, as an example, the design calculations showed that the strains of both the coal wall and gob-side backfill were larger than their allowable strains and the rotational angle of the lateral main roof was larger than its allowable rotational angle. Finally, flexible-rigid composite supporting technology and roof cutting technology were designed and used. In situ investigations showed that the deformation and failure of surrounding rocks were well controlled and both the coal wall and gob-side backfill remained stable. Taking the coal wall, gob-side backfill and gangues in goaf as a whole system, this research takes full consideration of their bearing properties and provides a quantitative basis for design of the support system.

Prediction Models for the Severity of Traffic Accidents on Expressway On- and Off-Ramps (유입·유출특성을 고려한 고속도로 연결로의 교통사고 심각도 예측모형)

  • Yun, Il-Soo;Park, Sung-Ho;Yoon, Jung-Eun;Choi, Jin-Hyung;Han, Eum
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.101-111
    • /
    • 2012
  • PURPOSES: Because expressway ramps are very complex segments where diverse roadway design elements dynamically change within relatively short length, drivers on ramps are required to drive their cars carefully for safety. Especially, ramps on expressways are designed to guarantee driving at high speed so that the risk and severity of traffic accidents on expressway ramps may be higher and more deadly than other facilities on expressways. Safe deceleration maneuvers are required on off-ramps, whereas safe acceleration maneuvers are necessary on onramps. This difference in required maneuvers may contribute to dissimilar patterns and severity of traffic accidents by ramp types. Therefore, this study was aimed at developing prediction models of the severity of traffic accidents on expressway on- and off-ramps separately in order to consider dissimilar patterns and severity of traffic accidents according to types of ramps. METHODS: Four-year-long traffic accident data between 2007 and 2010 were utilized to distinguish contributing design elements in conjunction with AADT and ramp length. The prediction models were built using the negative binomial regression model consisting of the severity of traffic accident as a dependent variable and contributing design elements as in independent variables. RESULTS: The developed regression models were evaluated using the traffic accident data of the ramps which was not used in building the models by comparing actual and estimated severity of traffic accidents. Conclusively, the average prediction error rates of on-ramps and offramps were 30.5% and 30.8% respectively. CONCLUSIONS: The prediction models for the severity of traffic accidents on expressway on- and off-ramps will be useful in enhancing the safety on expressway ramps as well as developing design guidelines for expressway ramps.

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

Dynamic response of middle slab in double-deck tunnel due to vehicle load (차량하중에 의한 복층터널 중간슬래브의 동적 응답)

  • Kim, Hyo-Beom;Kwak, Chang-Won;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.717-732
    • /
    • 2017
  • Recently, the construction of underground structure such as a double-deck tunnel is increasing to manage rapid growth of roadway traffic volume. Double-deck tunnel includes middle slab to separate upper and lower road inside, and various sources affect the dynamic behaviour of middle slab due to dynamic loading of vehicle. Therefore, it is important to investigate the dynamic response of middle slab precisely to apply it to design and analysis of double-deck tunnel. In this study, dynamic analysis model of middle slab considering structural type, design velocity, vehicle load, and surface roughness, etc. is built. 3-dimensional dynamic analysis is performed to assess dynamic response of middle slab. Consequently, Dynamic Magnification Factor which represents dynamic response of middle slab shows maximum in case of elastomeric bearings (EB) and average roughness (Grade C). It is also expected that dynamic response can be reduced under the condition of good roughness (Grade B) and fixed bearings (FB).

Backfill Materials for Underground Facility with Recycling Materials - Quantification of Design Parameters (재활용재료를 이용한 지하매설물용 뒤채움재 - 설계입력변수 정량화)

  • Lee, Kwan-Ho;Kim, Seong-Kyum
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.3
    • /
    • pp.91-96
    • /
    • 2011
  • The design, construction and management of underground facilities as infrastructure of nation should be properly carried out. One of reasons for underground facilitie's failure is a non-proper construction of backfill materials. This is common for circular underground pipes. A non-proper compaction is the cause of settlement and decrease of performance of underground facilities. The use of controlled low strength materials is an alternative to reduce the couple of failure problems. The flowability, self-cementation, and non-compaction are the major advantages to use the controlled low strength materials. In this research, couple of recycled materials, such as in-situ soil, water-treatment sludge, and crumb rubbers, were adopted. The basic properties of each materials were determined according to KS or ASTM. Also, couple of laboratory tests were carried out to get the design parameters for geotechnical and roadway area.

Wind load estimation of super-tall buildings based on response data

  • Zhi, Lun-hai;Chen, Bo;Fang, Ming-xin
    • Structural Engineering and Mechanics
    • /
    • v.56 no.4
    • /
    • pp.625-648
    • /
    • 2015
  • Modern super-tall buildings are more sensitive to strong winds. The evaluation of wind loads for the design of these buildings is of primary importance. A direct monitoring of wind forces acting on super-tall structures is quite difficult to be realized. Indirect measurements interpreted by inverse techniques are therefore favourable since dynamic response measurements are easier to be carried out. To this end, a Kalman filtering based inverse approach is developed in this study so as to estimate the wind loads on super-tall buildings based on limited structural responses. The optimum solution of Kalman filter gain by solving the Riccati equation is used to update the identification accuracy of external loads. The feasibility of the developed estimation method is investigated through the wind tunnel test of a typical super-tall building by using a Synchronous Multi-Pressure Scanning System. The effects of crucial factors such as the type of wind-induced response, the covariance matrix of noise, errors of structural modal parameters and levels of noise involved in the measurements on the wind load estimations are examined through detailed parametric study. The effects of the number of vibration modes on the identification quality are studied and discussed in detail. The made observations indicate that the proposed inverse approach is an effective tool for predicting the wind loads on super-tall buildings.

The Simulation and Experimental Study on the Bridge Response of AGT Bridge - Vehicle interaction System (AGT 시스템 교량-차량 상호작용에 의한 교량응답 시뮬레이션 및 실험)

  • Na, Sang-Ju;Kim, Ki-Bong;Song, Jae-Pil;Kim, Hyun-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.395-400
    • /
    • 2007
  • LRT(Light Railway Train), which is a intermediate system of train and bus, is arose for the solution of subway construction cost and the transportation capacity of bus. LRT was introduced in 1980's. About 30 local governments are plan to introduce LRT or constructing LRT, at present. AGT(Automated Guide-way Transit) system, which is a kind of LRT, is operated without driver. Rubber wheeled AGT system can reduce the noise and vibration compare to steel wheeled AGT, so it is estimated as ideal transportation system for urban area. And live loads at bridge are classified as the static load of vehicle and the dynamic wheel contact load which is occurred from the interaction of bridge and vehicle vibration, and the surface roughness. In the case of AGT system, the dynamic increment factor of bridge is greater than the normal train bridge and roadway bridge, because, the weight of AGT vehicle is more light that the train of truck. The exact method for dynamic increment factor is experiment. But this method is needed much money and time, moreover, this method cannot be adopted in design. Therefore, a simulation program for the interaction of AGT bridge, vehicle and surface roughness was developed, in this study. And the program was verified by experiment. As a result, the accuracy of the simulation program can be verified.

  • PDF

Determining the Required Minimum Spacing between Freeway Interchange for High-speed Roadway (초고속 주행환경에서의 진출입 시설간 적정 이격거리 기준 산정 연구)

  • Kim, Heung Rae;Kim, Kyoung Su;Lee, Geun Hee;Shin, Joon Soo;Baek, Jung Gil
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.45-55
    • /
    • 2017
  • PURPOSES: The objective of this study is to estimate required minimum spacing between Freeway IC for high-speed roadways. METHODS : Since high-speed roadways with over 140 km/h design speed do not exist in Korea, VISSIM Simulation Program was used for analysis. Acceleration noise and conflicts were selected for Evaluation Index. Standard deviation size for acceleration and deceleration was calculated by VISSIM to estimate acceleration noise. Conflicts were produced in areas between Freeway IC with SSAM. RESULTS : As a result, required minimum spacing was 6 km for acceleration noise analysis, while 5 km was deducted for conflict analysis. For Model Evaluation, with SAS, conflicts did not show much difference in 5~6 km area by 90% confidence interval. CONCLUSIONS : For acceleration noise, results showed lacking in its discrimination between index per Minimum Spacing. However, conflicts were valid in difference; required minimum spacing was 5 km by validation result.

The Development of Visual Inspection System for National Road Facility Maintenance Management (국도 시설물 유지관리를 위한 현장점검시스템 개발)

  • 주기범;김태학;박상근
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.72-77
    • /
    • 2003
  • Visual inspection works are very important part of facility maintenance and management life cycle as a step of creating base data for decision making and maintenance and repair. But currently, visual inspection works have been performed unefficiently and unreliably as works on hand, duplication of works, decisions of defect state, unutilization of inspection history, lack of professional and so on. In this research, we developed visual inspection system that processes inspection work efficiently and provides reliability of inspection output, as a target of bridges, tunnels, underground roadway on national road. We defined problems through visual inspection work analysis, examined the solutions and reflected to functional design of system. We will plan to utilize this system in HMCS(Highway Maintenance and Construction Service).

  • PDF

Accident Prevention Technology at a Level Crossing (철도건널목 사고방지를 위한 방안 연구)

  • Cho, Bong-Kwan;Ryu, Sang-Hwan;Hwang, Hyeon-Chyeol;Jung, Jae-Il
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2220-2227
    • /
    • 2008
  • The safety equipments of railway level crossing which are installed at intersections between roads and railway lines prevent level crossing accidents by informing all of the vehicles and pedestrians of approaching trains. The intelligent safety system for level crossing which employs information and communication technology has been developed in USA and Japan, etc. But, in Korea, the relevant research has not been performed. In this paper, we analyze the cause of railway level crossing accidents and the inherent problem of the existing safety equipments. Based on analyzed results, we design the intelligent safety system which prevent collision between a train and a vehicle. This system displays train approaching information in real-time at roadside warning devices, informs approaching train of the detected obstacle in crossing areas, and is interconnected with traffic signal to empty the crossing area before train comes. Especially, we present the video based obstacle detection algorithm and verify its performance with prototype H/W since the abrupt obstacles in crossing areas are the main cause of level crossing accidents. We identify that the presented scheme detects both pedestrian and vehicle with good performance.