• Title/Summary/Keyword: Road information management

Search Result 559, Processing Time 0.029 seconds

A Study of Effective Method to Update the Database for Road Traffic Facilities Using Digital Image Processing and Pattern Recognition (수치영상처리 및 패턴 인식에 의한 도로교통시설물 DB의 효율적 갱신방안 연구)

  • Choi, Joon-Seog;Kang, Joon-Mook
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.20 no.2
    • /
    • pp.31-37
    • /
    • 2012
  • Because of road construction and expansion, Update of the road traffic facilities DB is steadily increased each year, and, Increasing drivers and cars, safety signs for traffic safety are required management and additional installation continuously. To update Safety Sign database promptly, we have developed auto recognition function of safety sign, and analyzed coordinates accuracy. The purpose of this study was to propose methods to update about road traffic facilities efficiently. For this purpose, omni-directional camera was calibrated for acquisition of 3-dimensional coordinates, integrated GPS/IMU/DMI system and applied image processing. In this experiment, we proposed a effective method to update database of road traffic facilities for digital map.

Estimation of spatial parameters to be included in 3D mapping for long-term forest road management

  • Choi, Sung-Min;Kweon, Hyeongkeun;Lee, Joon-Woo
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.727-742
    • /
    • 2020
  • Point cloud-based 3D maps can obtain many kinds of information for maintenance work on forest road networks. This study was conducted to compare the importance of each factor to select the factors required for the mapping of 3D forest road maps. This can be used as basic data for attribute information required to maintain forest road networks. The results of this study found that out of a total of 30 indexes extracted for mapping 3D forest roads, a total of 21 indexes related to stakeholder groups were significantly different. The importance of the index required by the civil service group was significantly higher than that of the other groups overall. In the case of the academic group, the index importance for cut slope, fill slope, and drainage facility was significantly higher. On the other hand, the index importance for the forestry cooperative and forest professional engineer group was mostly distributed between the civil servants' group and the academic group. In particular, the type of drainage system showed the highest value among the detailed indexes. Overall, drainage related factors in this survey had high coefficient values. The impact of water on forest roads was the most important part in road maintenance. In addition, the soil texture had a high value in relation to slope stability. This is thought to be because the texture of the soil affects the stability of the slope.

Application of Digital Photogrammetry for The Automatic Extraction of Road Information (도로정보의 자동추출을 위한 수치사진측량기법의 적용)

  • 유환희
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.12 no.1
    • /
    • pp.89-94
    • /
    • 1994
  • A number of the latest research projects focus on the development of real-time mapping system. Typically, these devices are used to capture land-related information in digital form from airplanes or cars. The purpose of this paper is to automatically extract the road information from the digital images obtained using the so-called "GPS-Van" which has been developed by Center for Mapping at The Ohio State University, and to propose the method for the effective storage and management of the digital data. The edges of a road can be extracted from the digital image and determined real-time 3-dimensional position by digital photogrammetry. Also, the three storage level which consists of raster data level, object-oriented data level, and vector data level in the data storage and Quadtree data structure for the effective compression and search in the data management was proposed in this paper.his paper.

  • PDF

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

Differences in Field Sign Abundance of Mammal Species Around the Roads in Baekdudaegan Mountains

  • Hur, Wee-Haeng;Lee, Woo-Shin;Choi, Chang-Yong;Park, Young-Su;Lee, Chang-Bae;Rhim, Shin-Jae
    • Journal of Korean Society of Forest Science
    • /
    • v.94 no.2 s.159
    • /
    • pp.112-116
    • /
    • 2005
  • This study was conducted to obtain the information of distribution, protection and management for mammal species in fragmented forest areas around the road from June 2002 to May 2003 in 9 study sites of Baekdugdaegan mountains, Korea. Field signs of twelve mammals, moles Molera robusta, Korean hares Lepus coreanus, Manchurian chipmunk Tamias sibiricus, red squirrels Sciurus vulgaris, Korean racoon dogs Nyctereutes procyonoides, Siberian weasels Mustela sibirica, badgers Meles meles, otters Lutra lutra, Bengal cats Felis bengalensis, wild boars Sus scrofa, water deer Hydropotes inermis and roe deer Capreolus pygargus were recorded in this study. There were no differences in total number of species between 50 m areas and 50-100 m areas from road in snow and non-snow season. Number of mammals' field signs were different in non-snow season between both areas. Red squirrels and Siberian weasels were more abundant in 50 m areas, and Korean hares and Manchurian chipmunks were in 50-100 m areas. Habitat using pattern of mammal species may be affected by the road. Reasonable road construction and maintenance would be needed for protection and management of wildlife and their habitats.

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF

Extraction of Information on Road Surface Using Digital Video Camera (디지털 비디오카메라를 이용한 도로노면정보 추출)

  • Jang Ho Sik
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.1
    • /
    • pp.9-17
    • /
    • 2005
  • The objective of the study is to extract information about the road surfaces to be studied by analyzing asphalt concrete-paved road surface images photographed with a digital video camera. To analyze the accuracy of road surface information gained using a digital imagery processing method, it was compared and analyzed with the outcomes of control surveying. As a result, an average error of 0.0427 m in the X-axis direction, that of 0.0527 m in the Y-axis direction, and that of 0.1539 m in the Z-axis direction were found, good enough for mapping at a scale of 1:1,000 or less and GIS data. Besides, information on road surface assessment factors such as crack ratio, the amount of rutting and profile index was gained by analyzing processed digital imagery. This information made it possible to conduct road surface assessment by generating PSI and MCI. As quality digital image information has been gathered from roads and stored, important fundamental data on PMS (Pavement Management System) will become available in the future.

A study on the Implementation of the New Address Management and Guide System for Jecheon city area (제천시를 위한 새주소 관리 및 안내시스템 구축에 관한 연구)

  • Yeon, Sang-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.2 no.1
    • /
    • pp.24-31
    • /
    • 2002
  • The purpose of this study is development of the management and guide system for convenient use of new address guide system for systematic management and use of spatial information gained by management of numerical map of building and road to large basic new address, survey and input of main gate, setting up the road session, naming and input of road name, grant of given number of building, new address guide, life GIS and added information on Web-site in Jecheon-si city area In this study, development and establishment of new address management and guide system in local cities are designed by making full use of GIS function of client server base. A guide system is designed the same database as management system, and it is transformed into Web-GIS environment and developed in order to add the various functions of life GIS as wet as new address guide. In the result, the effectiveness of new address system and guide of Jecheon-si city could be highly increased owing to not only citizens'easy access but also easy availability of various informations necessary in life by developed its system.

  • PDF

Developing an Estimation Model for Safety Rating of Road Bridges Using Rule-based Classification Method (규칙 기반 분류 기법을 활용한 도로교량 안전등급 추정 모델 개발)

  • Chung, Sehwan;Lim, Soram;Chi, Seokho
    • Journal of KIBIM
    • /
    • v.6 no.2
    • /
    • pp.29-38
    • /
    • 2016
  • Road bridges are deteriorating gradually, and it is forecasted that the number of road bridges aging over 30 years will increase by more than 3 times of the current number. To maintain road bridges in a safe condition, current safety conditions of the bridges must be estimated for repair or reinforcement. However, budget and professional manpower required to perform in-depth inspections of road bridges are limited. This study proposes an estimation model for safety rating of road bridges by analyzing the data from Facility Management System (FMS) and Yearbook of Road Bridges and Tunnel. These data include basic specifications, year of completion, traffic, safety rating, and others. The distribution of safety rating was imbalanced, indicating 91% of road bridges have safety ratings of A or B. To improve classification performance, five safety ratings were integrated into two classes of G (good, A and B) and P (poor ratings under C). This rearrangement was set because facilities with ratings under C are required to be repaired or reinforced to recover their original functionality. 70% of the original data were used as training data, while the other 30% were used for validation. Data of class P in the training data were oversampled by 3 times, and Repeated Incremental Pruning to Produce Error Reduction (RIPPER) algorithm was used to develop the estimation model. The results of estimation model showed overall accuracy of 84.8%, true positive rate of 67.3%, and 29 classification rule. Year of completion was identified as the most critical factor on affecting lower safety ratings of bridges.