• Title/Summary/Keyword: Road construction site

Search Result 270, Processing Time 0.029 seconds

A Developmental Study on the Wood-frame House Construction Method in Hilly Areas (구릉지형 목조주택의 시공기법 개발)

  • Choi, Jang-Soon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.4 no.3
    • /
    • pp.53-62
    • /
    • 2002
  • This study aims at the development on the wood-frame house construction method in hilly areas. To obey the trend of public opinion to prohibit the troublesome development on a large scale in preparing housing sites, the small housing site development in hilly areas is on the rise and consequently wood-frame house which harmonized natural topography, geographical feature and environment in hilly areas is needed. The main contents are how to make housing sites, how to make roads, how to make pedestrian ways and surroundings of water to run downhill, how to locate house, how to make between road and house, how to view inner and outer and how to make retaining wall on the wood-frame house construction method in hilly areas.

  • PDF

Eco Recycling measure from the waste of tree in Road Construction site (도로 건설현장 임목폐기물 친환경 재활용 방안)

  • Lee, Yong-Soo;Park, Eun-Ho;Ryu, Sang-Hun
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.12b
    • /
    • pp.584-586
    • /
    • 2011
  • 본 논문에서는 도로 건설현장에서 발생하는 임목폐기물을 도로 보호길 어깨 포설에 재활용 하는 친환경 방안을 제시하였다. 기존에는 임목폐기물을 폐기물로 분류하여 폐기물 전문업체를 통해 위탁 처리하였으나, 임목폐기물의 효율적인 자원 낭비를 방지하고자 도로 보호길 어깨에 임목폐기물을 파쇄하여 포설하고자 한다. 포설 방법은 보호길 어깨를 굴착하여 파쇄칩을 포설 및 다짐한 후 친환경성 접착제를 살포한다. 위 활용 방안의 가능성을 입증하기 위해 우수 침식시험기를 자체 제작 후 실내시험을 실시하였다. 침식 시험기를 이용한 시험 결과 현장 적용이 가능하다는 결론을 얻었다.

  • PDF

Field Working Data Analysis of Sludge Suction Type Pavement cutter to Reduce Scattered Dust (비산먼지 저감을 위한 슬러지 흡입식 도로절단기의 현장 작업 데이터 분석)

  • Kim, Kyoon-Tai;Jun, Younghun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.231-232
    • /
    • 2022
  • Pavement cutting work frequently occurs in new building construction, reconstruction, and complex construction, and this work causes a lot of noise and dust. Eco-friendly pavement cutters are being developed to reduce noise and dust in this work, however the on-site cutting performance of the equipment under development has not been quantified. In this study, the eco-friendly pavement cutter was applied to four residential areas in Seoul and Gyeonggi-do, and its cutting performance was quantified. As a result of the analysis, the eco-friendly pavement cutter showed cutting performance of 20.1~46.9sec/m, and the average was 33.5sec/m. In the future, we plan to conduct additional cutting experiments with various mixing ratios, materials, and depths to confirm the performance of eco-friendly road cutters in more detail.

  • PDF

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

Design of an Information System Prototype for Generating and Linking Ultra-precision Digital Maps of Construction Sites (건설 현장의 초정밀 디지털 맵 생성 및 연계를 위한 정보체계 프로토타입 설계)

  • Kim, Jong-Hyeop;Yeom, Dong-Jun;Ko, Hyun-A;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.6_2
    • /
    • pp.1015-1024
    • /
    • 2020
  • By nature, smart construction technology is a convergence technology, therefore aptly constructing and running an information system is needed in order to effectively develop and maintain it. Thus, in this study, an information system prototype was developed for the creation and linking of high precision digital maps at road construction sites for the effective performance of the development of the Information Collecting and Analyzing Techniques in the Construction Site (ICAT). For this, (1) defined input/output (I/O) data of each technical detail of ICAT, (2) analyzed the data flow, (3 ) proposed an information system prototype for high precision digital maps development and connection. Based on the information system prototype constructed in this study, it was inferred that each technique and its information for the Smart Construction Technique Development Business was in a consistent flow. Developed information system prototype would enable effective cooperation between subjects directly involved in the technique development, by defining I/O data in advance. Moreover, it would be of value to practitioners for refining the output data from each technique, thereby linking databases and forming Entity Relationship Diagram.

Building Information Modeling of Caves (CaveBIM) in Jeju Island at a Specific Site below a Road at Jaeamcheon Lava Tube and at a Broader Scale for Hallim Town (제주도 한림 재암천굴과 도로 교차구간의 CaveBIM 구축)

  • An, Joon-Sang;Kim, Wooram;Baek, Yong;Kim, Jin-Hwan;Lee, Jong-Hyun
    • The Journal of Engineering Geology
    • /
    • v.32 no.4
    • /
    • pp.449-466
    • /
    • 2022
  • The establishment of a complete geological model that includes information about all the various components at a site (such as underground structures and the compositions of rock and soil underground space) is difficult, and geological modeling is a developing field. This study uses commercial software for the relatively easy composition of geological models. Our digital modeling process integrates a model of Jeju Island's 3D geological information, models of cave shapes, and information on the state of a road at the site's upper surface. Among the numerous natural caves that exist in Jeju Island, we studied the Jaeamcheon lava tube near Hallim town, and the selected site lies below a road. We developed a digital model by applying the principles of building information modeling (BIM) to the cave (CaveBIM). The digital model was compiled through gathering and integrating specific data: relevant processes include modeling the cave's shape using a laser scanner, 3D geological modeling using geological information and geophysical exploration data, and modeling the surrounding area using drones. This study developed a global-scale model of the Hallim region and a local-scale model of the Jaeamcheon cave. Cross-validation was performed when constructing the LSM, and the results were compared and analyzed.

A Study on the Practical lighting Guide for Night Work (야간작업 안전의 적정조명 기준설정을 위한 실험연구)

  • Ro Min-Lae;Son Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.70-77
    • /
    • 2004
  • A Reasonable lighting should be provided for doing night work. All works far construction site can be exposed to potential hazard at night work The purpose of this study is to provide a standard of the lighting against accidents due to insufficient lighting at site. one pilot tea one at building work site, one at mad work site of it have been conducted for figuring out illumination change depending worker's activity direction, using lux checker to show it as numerical indication. The direction are changed with a range of 30, 60, 90, and 135 degree to be checked at site. Tests results show that $10\%\;and\;15\%$ of lighting could be decreased by changing the working direction of works at site. Therefore, steep slope place, cave work and backside of structural elements such as a column, deep beam should be considered for keeping sufficient and reasonable lighting. It is found that $50\%more$ illumination Lux needs f3r civil work than for building work.

Methodology for Prioritizing Sidewalk Construction among 100 Candidate Sites on Rural National Highways (지방부 국도에서의 보도설치 우선순위 결정을 위한 방법론 개발 (일반국도 적용사례 중심으로))

  • Jeon, Woo Hoon;Yang, Choong Heon;Yoon, Jung Eun;Yang, Inchul
    • International Journal of Highway Engineering
    • /
    • v.17 no.4
    • /
    • pp.127-133
    • /
    • 2015
  • PURPOSES: The purpose of this study is to develop a methodology to prioritize sidewalk construction on rural national highways. METHODS : In order to determine an appropriate prioritization for sidewalk construction, we developed a specific methodology. The proposed methodology includes three main steps: 1) Analytic Hierarchy Process (AHP) methods, 2) Subjective evaluation of relevant road agencies for the candidate sidewalks along rural national highways, and 3) Field study conduction. Each step has four phases. The primary feature of this methodology is the addition of expert consultation and survey data, as well as a field study. In addition, the method could guarantee flexibility in selection for evaluation criteria. As a result, the proposed methodology could be used as a general procedure for application to other roadway classifications when considering sidewalk construction. RESULTS: In order to demonstrate the reasonableness of the proposed methodology, a case study was performed for exactly 100 candidate sites for sidewalk construction on rural national highways. All required evaluation scores were properly produced for each candidate site. By doing so, decision-makers can determine the priority for sidewalk construction at these sites by reviewing quantitatively and qualitatively considered data. CONCLUSIONS: The results of the case study can be applied to a long-term fundamental plan for sidewalk construction on rural national highways. Furthermore, this methodology could be employed to prioritize a small-scale SOC project(e. g. bicycle or pedestrian roads).

Case study on Construction and Improvement of Rahmen Structures in Deep Soft Clay Deposit (대심도 연약지반에 설치된 라멘 구조물의 시공 및 보강사례)

  • Lee, Sa-Ik;Choi, Young-Chul;Yoo, Sang-Ho;Kim, Tae-Hyung;Kim, Sung-Ryul
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.1
    • /
    • pp.85-92
    • /
    • 2014
  • Structures that have constructed in soft clay might suffer from many issues related to consolidation settlement or lateral movement of soft-clay during long-term period. Therefore, it is important to establish proper design and construction processes related to site investigation, soil improvement, construction management, and so on. This case study focused on the construction of the rahmen structure supported by pile foundations. Especially, the structure in this case had been constructed without improving underlying soft clay and before constructing backfill embankment due to the limited construction time and the traffic connection of the old road crossing new highway. Therefore, in order to satisfy the structural stability, the construction processes and countermeasure methods were carefully planned based on the results of preliminary numerical analyses and monitoring of ground behaviors. Through the trial and error precess during the construction, the structures had been successfully constructed.

Limitation of Measurement System in Application of Angular Distortion Criterion to Structure Near Road Embankment (도로 성토 시 인근 구조물에 각변위기준 적용에 있어 계측시스템의 한계성)

  • Kim, Taehyung;Kim, Dongin;Kim, Yuntae;You, Sangho;Jung, Youngeun;Kim, Sungwoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.1
    • /
    • pp.43-51
    • /
    • 2014
  • Angular distortion due to differential settlement is one of the critical factors which influences on the stability and serviceability of a structure. The angular distortion criterion proposed by Bjerrum is generally used in practice. However, the measurement system used in field especially a road embankment site did not properly represent the angular distortion of a structure. The problem was related to the shortage and not proper installation of measurement gauges, and the incorrect understanding of the basic concept of angular distortion in interpretation of measurement data. These things were reveled by analyzing the measured data in the road embankment site. An improved measurement system has been suggested as a so-called "relative displacement measurement system" between columns with automatic measurement.