• Title/Summary/Keyword: Road construction site

Search Result 270, Processing Time 0.029 seconds

Analysis on the Characteristics of Debris Flows Occurred around the Forest Road in Jinbu Area of Gangwon Province (강원도 진부지역 임도변 발생 토석류 특성분석)

  • Seo, Heung-Seok;Yune, Chan-Young;Jun, Kyoung-Jea
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.698-707
    • /
    • 2010
  • Because of localized extreme rainfall followed by Typhoon Ewiniar in 2006, a lot of landslides and debris flows were occurred in Jinbu area of Gangwon Province. Field investigation performed in this area found that it can be divided into three categories i.e. large debris flow, small debris flow, and debris flow around forest road. We performed field investigation especially for the sites where debris flow occurred around forest road. And the characteristics of the debris flow around forest road were analyzed and compared with the other site of debris flow.

  • PDF

A Development of Façade Dataset Construction Technology Using Deep Learning-based Automatic Image Labeling (딥러닝 기반 이미지 자동 레이블링을 활용한 건축물 파사드 데이터세트 구축 기술 개발)

  • Gu, Hyeong-Mo;Seo, Ji-Hyo;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.12
    • /
    • pp.43-53
    • /
    • 2019
  • The construction industry has made great strides in the past decades by utilizing computer programs including CAD. However, compared to other manufacturing sectors, labor productivity is low due to the high proportion of workers' knowledge-based task in addition to simple repetitive task. Therefore, the knowledge-based task efficiency of workers should be improved by recognizing the visual information of computers. A computer needs a lot of training data, such as the ImageNet project, to recognize visual information. This study, aim at proposing building facade datasets that is efficiently constructed by quickly collecting building facade data through portal site road view and automatically labeling using deep learning as part of construction of image dataset for visual recognition construction by the computer. As a method proposed in this study, we constructed a dataset for a part of Dongseong-ro, Daegu Metropolitan City and analyzed the utility and reliability of the dataset. Through this, it was confirmed that the computer could extract the significant facade information of the portal site road view by recognizing the visual information of the building facade image. Additionally, In contribution to verifying the feasibility of building construction image datasets. this study suggests the possibility of securing quantitative and qualitative facade design knowledge by extracting the facade design knowledge from any facade all over the world.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

A Study on Stability Evaluation and Numerical Analysis for Installing of Real-Time Monitoring System on Risky Road Cut Slope (위험절토사면의 안정성평가 및 상시계측시스템 설치를 위한 수치해석적 연구)

  • Choi, Ji-Yong;Lee, Jong-Hyun;Lee, Yeob-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1139-1146
    • /
    • 2009
  • Collapse of cut slope includes many uncertainties in view of the reason and time. So, in the past, risky cut slopes have been dealt after they've been collapsed through post-management measures. But recently, advanced disaster prevention system is required, and as a part of that RTMS(Real-Time Monitoring System) was developed. In this study, stability of risky cut slope was evaluated by site investigation. To grasp deformation behavior characteristics of slope, numerical analysis based on FEM was performed and using results of that, specific standards for installation of Real-Time Monitoring System were suggested.

  • PDF

A Study on the Digital Construction Information Structure for the Implementing Digital Twin of Road Construction Sites (도로 건설현장의 디지털트윈 구현을 위한 디지털 건설정보구조에 관한 연구)

  • Taewon Chung;Hyon Wook Ji;Jin Hoon Bok
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.23 no.1
    • /
    • pp.153-166
    • /
    • 2024
  • The digitalization of tasks for smart construction requires the smooth exchange of digital data among stakeholders to be effective, but there is a lack of digital data standardization and utilization methods. This paper proposes a digital construction information structure to transform information from road construction sites into digital formats. The study targets include significant tasks, such as work planning, scheduling, safety management, and quality control. The key to the construction information structure is separating construction information into objects and activities, defining unit works by combining these two types of information to ensure flexibility in representing and modifying construction information. The objects and activities have their respective hierarchical structures, which are defined flexibly to match the actual content. This structure achieves both efficiency and detail. The pilot structure was applied to highway construction projects and implemented digitally using general formats. This study enables the digitalization of road construction processes that closely resemble reality, accelerating the digital transformation of the civil engineering industry by developing a digital twin of the entire road construction lifecycle.

A Study on the Site Selection and Orientation of Western House in Cheongju (청주(淸州) 탑동양관(塔洞洋館)의 입지선정(立地選定) 및 좌향(坐向)에 관한 연구(硏究))

  • Seo, Hyang-Soon;Lee, Min-Kyoung;Kim, Tai-Young
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.197-202
    • /
    • 2008
  • The purpose of this study is to clarify the site selection and orientation which have affected the western missionaries in construction of the first western house in Cheongju area. The results of this study are as follows; In the site selection, they chose Tap-Dong hill, by finding the higher position and taking a fine view of all natural elements, because the alters like the tomb of Confucius, the existing settlement Godang village, Dang Mt. are already located around this area. And also it was that they could easily go into Tap-Dong hill through the existing alleys, These alleys, generated near the original road of Tap-Dong hill, are developed to modern road system. These alleys affect western house's entrance and orientation. In deciding the orientation of house, korean people prefer to south and east by considering Feng-shui theory; otherwise western house, specially the first house has a southwestern aspect, because the western missionaries have a preference for the topography, entry, and view than a house facing south.

  • PDF

The Construction of Bridges Management System Using GSIS (GSIS를 이용한 교량관리체계(橋梁管理體系) 구축(構築))

  • Yang, In-Tae;Kim, Dong-moon;Shin, Kye-jong
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.43-50
    • /
    • 1998
  • According to complexity and high level of society, the rapid and accurate information for landuse, environment and traffic etc., is required, but the information management by a drawing and a map is confronted with a complicated and sudden change of facilities such as bridge; electricities, city gases and networks. This paper is aim to build a bridge management system of road with GSIS. It operated personal computer will bring easy computing management system of bridge on road. To build this system, presented bridge management system and domestic method for bridge management of road are investigated, and also apply to bridge management system using GSIS for site and character of bridges. And with that, position and character apply to bridge management system using GSIS.

  • PDF