Xu, Xiaomin;Soga, Kenichi;Nawaz, Sarfraz;Moss, Neil;Bowers, Keith;Gajia, Mohammed
Smart Structures and Systems
/
v.15
no.3
/
pp.769-785
/
2015
Although timber structures have been extensively used in underground temporary supporting system, their actual performance is poorly understood, resulting in potentially conservative and over-engineered design. In this paper, a novel wireless sensor technology, SmartPlank, is introduced to monitor the field performance of timber structures during underground construction. It consists of a wooden beam equipped with a streamlined wireless sensor node, two thin foil strain gauges and two temperature sensors, which enables to measure the strain and temperature at two sides of the beam, and to transmit this information in real-time over an IPv6 (6LowPan) multi-hop wireless mesh network and Internet. Four SmartPlanks were deployed at the London Underground's Tottenham Court Road (TCR) station redevelopment site during the Stair 14 excavation, together with seven relay nodes and a gateway. The monitoring started from August 2013, and will last for one and a half years until the Central Line possession in 2015. This paper reports both the short-term and long-term performances of the monitored timber structures. The grouting effect on the short-term performance of timber structures is highlighted; the grout injection process creates a large downward pressure on the top surface of the SmartPlank. The short and long term earth pressures applied to the monitored structures are estimated from the measured strains, and the estimated values are compared to the design loads.
In Korea, numerous large-scale infrastructure construction projects and housing site developments are being undertaken. However, due to limited land availability, sourcing high-quality backfill materials that meet the standards for railroad and road embankment compaction and mechanically stabilized earth (MSE) retaining wall construction poses significant challenges. Concurrently, there has been an increase in structural failures of many MSE retaining walls, attributed primarily to reduced bearing capacity and impaired drainage performance, resulting from inadequate backfill compaction. This study aimed to analyze the structural performance and safety of an MSE retaining wall using recycled soil as backfill. We conducted small-scale model tests utilizing 3D printing technology combined with two-dimensional numerical analysis. The study quantitatively evaluated the MSE retaining wall's performance concerning the recycled soil mixing ratio and reinforcement installation methods. Furthermore, the utility of 3D printing was confirmed through the production of an experimental wall designed to facilitate easy reinforcement attachment, mirroring the conditions of actual MSE retaining wall construction.
This study summarizes the relations among $PM_{2.5}$ concentration, water-soluble ions concentration, metallic element Components characteristics and SPSS in negative ion and metallic element of $PM_{2.5}$ particle in Miryang.(By the urban area, the industrial complex area and the suburban area according to the season) $PM_{2.5}$ concentration of total 72 samples collected from 3 sites turned out to range from 3.47 to 34.7 ${\mu}g/m^3$, and the average concentration was the suburban area-the kin nup(16.00 ${\mu}g/m^3$) > the urban area-the roof of the old Miryang university(10.32 ${\mu}g/m^3$) > the industrial complex-Sapo industrial complex(10.29 ${\mu}g/m^3$). In particular, the suburban area had $PM_{2.5}$ concentration 1.5 times those of urban area, industrial complex. It was thought although the site was suburban and farm-side without pollutants around, it had a higher concentration value influenced by external factors including the brickyard, small-scale incinerator, driving range construction, construction on the Daegu-Busan express and the widening of the four-lane road between Miryang-Anyang nearby. As for water-soluble ions among $PM_{2.5}$ particle collected in Miryang area, $SO4_{2^-}$ accounted for 60% and $NO_{3^-}$, was 30% in spring and summer. And $NO_{3^-}$ accounted for 50% and $SO4_{2^-}$ was 35% in fall and winter. The AI value of metallic Components among $PM_{2.5}$ particle collected in Miryang area had a high value influenced by the apartment complex construction and the extension work of road. The industrial complex area had Zn concentration 3 times, and Fe concentration 2 times those of urban area and suburb area. When it comes to the relation with metallic elements in urban area, the highest coefficient of correlation was between Cr-Fe with 0.85, and Pb-Cd turned out in the reverse correlation. Among metallic elements, the coefficients of correlation between Zn and Cr, Mn, Fe, NI were high in industrial complex area. The highest coefficient of correlation was between Mn-Zn with 0.88, meanwhile Ni and Cu, Cd turned out in the reverse correlation in the suburb area. These coefficients of correlation are attributed to the difference in pollutant sources, rather than difference in pollutant and non-pollutant.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.11
/
pp.501-509
/
2019
The construction of foundation piles for buildings and bridges is changing from pile driving to an injected precast pile method. The goal is to minimize environmental damage, noise pollution, and complaints from neighboring residents. However, it is necessary to develop economic piles that are optimized for precasting by a centrifugal method in terms of both the material and structural system. A reinforced joint method is proposed for reinforced concrete piles (RC piles) manufactured by centrifugal casting. A previous study concluded that the structural performance of the current joint system for RC piles could be improved by using a reinforced joint composed of extended circular band plates and studs. In this study, the structural performance of such a joint was validated experimentally by bending and shear strength measurements. The proposed joint reinforcement method showed adequate structural performance in terms of bending and shear strength. The overall load-deflection behavior is close to that of a structure without joints, so it is expected that the behavior and performance of the design can be reliably reflected in site structures.
Rock produced in situ has been used as the road construction materials in consideration of economies. However, because sedimentary rock is rapidly weathered, it is hard to decide appropriateness of quality specifications. This study aims at evaluation of usability for sub-base of muddy stone produced in situ. Test results show that the abrasion ratio is fitted for specifications, but weight loss in 37.5$\sim$16mm after Los Angeles abrasion test shows 47% in muddy stone in comparison with 20$\sim$30% in gneiss and sandstone. The soundness of aggregate shows higher value in muddy stone than in gneiss and sandstone. The weight loss from accelerated weathering test due to freezing and drying show 58% in muddy stone in comparison with 308$\sim$21% gneiss and sandstone.
Kang, Hee Bog;Kim, Kyo Jun;Park, Sung Kyoon;Kim, Jong Ryeol
Journal of the Korea institute for structural maintenance and inspection
/
v.12
no.2
/
pp.149-155
/
2008
The road construction, as part of effort to ease the worsening traffic, has been underway throughout the nation, while the existing road has been increasingly losing its load carrying capacity due to such factors as heavy traffic and weathering. In the case of site, the soil type, plasticity index, and specific gravity were SC, 12.2%, and 2.66, respectively. The maximum dry density, optimum moisture content and modified CBR were $1.895g/cm^3$ (Modified Compaction D), 13.6%, and 16.2%, respectively. A correlation of coefficient expressed good interrelationship by 0.90 between the CBR estimated from a dynamic penetration index of dynamic cone penetrometer test and a deformation modulus converted from a dynamic deflection modulus obtained from a portable FWD test.
Cut-slope due to the road construction is one of the most significant problems in the domestic case, that is, 70% of the land is covered by mountain. Moreover, typhoons or heavy rains concentrated in summer season causes the failure of cut-slope. Rock-fall and soil slope failure take 40.8% and 29.5% out of the entire domestic cut-slope failure, respectively. Rock-fall is quickly occurred by the free fall or rolling of rock fragments generally in the upper slope. Soil slope failure produces a clastics-flow and increases casualty especially when caused by heave rainfall because the velocity of the movement is verb high. Considering the car speed and rock-fall velocity, it will take a life in a moment. This study analyzes a set of field data of most recently collapsed domestic road cut-slopes to characterize these cut-slopes and the nature of rock-falls and clastics flows at each site. Based on the results, design criteria for a road alarm system are proposed, considering the relationship between the time required for clastics-flow and the velocity and braking distance of a cat at the incidence. The road alarm system proposed herein would operate instantly after a rock-fall and it will minimize damages, by warning drivels approaching to the collapse or collapsing location in advance.
Cha, Du Song;Chun, Kun Woo;Ji, Byoung Yun;Oh, Jae Heun
Journal of Forest and Environmental Science
/
v.15
no.1
/
pp.98-106
/
1999
This study was carried out to analyze the mechanical properties of soil for counterplan of recovery construction and the slope stability on fill slope of Sang-gul forest road in Mt. Gari. To analyze the mechanical properties of apparent soil on fill slope in forest road, various soils such as soil, gravelly sandy soil, weathered rock were used as experimental sample in this study. In each experimental sample, particle size distribution test, liquid limit test, plastic limit test, and specific gravity test were carried by Korean industrial standards(KS F 2302, KS F 2303, KS F 2304, KS F 2306, KS F 2308). Through the results of soil particle size distribution analysis, soil moisture content analysis, and specific gravity analysis, soil texture, uniformity coefficient, curvature coefficient, dry density and specific gravity were able to be determined in sampling site. As a results in this study, soil was classified as SP, SW, GP by Unified Soil Classification Standard (USCS). specific gravity and dry unit weight of soil have the value range of 2.52~2.60 and 1.39~1.43, respectively. Also plastic index showed non plastic condition.
The reinforced earth wall, which is able to improve the strength of soil highly, is required in case of supporting high surcharge load such as high speed rail way, high embankment road, and massive reinforced earth wall in a mountainous area. And also, it is continuously required that the method is able to minimize the amount of excavated soil on account of environmental issue, boundary of land, etc., on excavation site. However, because the required length of reinforcement should be $60{\sim}80%$ of the height of reinforced earth wall for general reinforced earth wall, in fact the reinforced earth wall is hardly applied on the site of cut slope. In this paper we studied the design and construction cases of hybrid reinforcement retaining wall system combined with steel strips and soil nails, connecting the reinforced earth wall reinforcements to the slope stability reinforcements (soil nails) to ensure sufficient resistance by means of reducing the length of reinforcements of reinforced earth wall. And the feasibility of hybrid reinforcement retaining wall system, suggested by real data measured on site, is also discussed.
Journal of the Korean Society of Environmental Restoration Technology
/
v.9
no.6
/
pp.133-142
/
2006
Occasionlly, a lot of plants withered on the marine upheaval soil, because of the potential acid sulfate soil. It was necessary to investigate the chemistry of soil, before planting on Ulsan-Jungjadong cut-slope of road construction site. Cut-slope surface soils were sampled on the every varying points in soil colour and analyzed chemically. Germination status of seeds in sample soils was investigated such as Albizzia julibrissin, Festuca arundinacea. Relationship between germination status and chemistry of soil was analyzed. The results of investigation and analysis are as follows. 1. Germination of seeds was inhibited, less than pH($H_2O$ 1 : 5) 2.63. 2. Germination of seeds was inhibited, more than EC($H_2O_2$ 1 : 5) 13.4mS. 3. Germination of seeds was inhibited, more than aluminum ion content 2.0ppm in soil solution extracted by A$H_2O$ and 6.2ppm by $H_2O_2$. 4. pH($H_2O$ 1 : 5), EC($H_2O_2$ 1 : 5) and aluminum ion content proved chemical indicators of seed germination inhibition, in case of potential acid sulfate soil.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.