• Title/Summary/Keyword: Road construction site

Search Result 270, Processing Time 0.026 seconds

A Study on Field Application and Laboratory Performance Evaluation of Warm Mix Asphalt (중온아스팔트 혼합물의 현장 적용성 및 실내 공용성 평가)

  • Yang, Sung-Lin;Baek, Cheol-Min;Jeong, Kyu-Dong;Kim, Yeong-Min;Kim, Yong-Joo;Hwang, Sung-Do
    • International Journal of Highway Engineering
    • /
    • v.14 no.4
    • /
    • pp.9-18
    • /
    • 2012
  • PURPOSES : This study evaluated the field applicability and laboratory performance of warm-mix asphalt (WMA) as an alternative technology in asphalt pavement. METHODS : The pilot road using two different types of WMA mixture and one HMA mixture was constructed in Waegwan-Seokjeok road construction site and the mixtures were sampled at the asphalt plant for laboratory testings. The field applicability was assessed in environmental aspects, such as $CO_2$ emission, and in aspects of constructibility using the existing equipment and procedure, i.e., thickness and density measurement. The laboratory testings included the moisture susceptibility test by AASHTO T283, dynamic modulus test, triaxial repeated load permanent deformation test, and the fatigue test. RESULTS : The temperatures for production and compaction of WMA were $20{\sim}30^{\circ}C$ lower than those for HMA and therefore, the noxious gas emission were significantly reduced. The field density of WMA pavements was similar or better than that of HMA pavement. From the laboratory testings, it was found that WMA mixtures exhibit comparable performance to HMA mixture in moisture susceptibility, permanent deformation, and fatigue performance. CONCLUSIONS : With these results, it would be concluded that WMA could replace the existing HMA technology without any significant issue. To support this conclusion, it is necessary to track the long-term performance of WMA in pilot road.

A Case Study of Extra Reinforcement by Road Extension work on Existing Cut Slope Reinforced with Counterweight Fill and Stabilizing Piles (압성토 및 억지말뚝으로 보강된 도로의 확장공사로 인한 추가 보강사례 연구)

  • Park, Jeong-Yong;Kim, Woo-Seong;Kim, Jae-Kyoung;Yang, Tae-Sun;Na, Kyung-Joon
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.2
    • /
    • pp.67-72
    • /
    • 2008
  • To confirm the stability of a cut slope in the road extension construction site, several investigations were carried out and countermeasures of slope was studied. This paper describes a study of design case of extra reinforcement on existing cut slope reinforced by preloading and piles in roads. To investigate the effect of stabilizing piles installed in a cut slope, an instrumentation system also designed, was. As a result that the stabilizing file and earth anchor are considered as the extra reinforcement, both stabilizing pile and earth anchor guarantee the stability of cut slope. However, stabilizing pile is selected in aspects of economy and continuity to the existing cut slop reinforcement including counterweight fill and stabilizing piles.

  • PDF

Analisys on Freezing Characteristics of Pavement Layer Using the Feild Pavement Model test (현장 모형 도로 축소 실험을 이용한 포장구성층의 동결 특성 분석)

  • Shin, Eun-Chul;Ryu, Byung-Hyun;Moon, Yong-Soo;Park, Jeong-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1164-1171
    • /
    • 2010
  • Korea is considered to be a seasonal frozen soil area that is thawed in the spring, and most of the area is frozen in winter as to the characteristic of geography. In the current design codes for anti-freezing layer, the thickness of anti freezing layer is calculated by freezing depth against the temperature condition. Therefore, they have a tendency of over-design and uniform thickness without the considerations of thermal stability, bearing capacity and frost susceptibility of materials. So, it is essential for studying the appropriateness and bearing capacity besides the seasonal and mechanical properties of pavement materials to take a appropriate and reasonable design of the road structure. In this research, the evaluation of frost susceptibility on subgrade, ant-freezing layer, sub base was conducted by means of the mechanical property test and laboratory field road model downed scale experiment. The temperature, heaving amount, heaving pressure and unfrozen water contents of soil samples, the subgrade, anti-freezing layer, sub base soils of highway construction site, were measured to determine the frost susceptibility.

  • PDF

Field Investigation into Early Age Behavior of Joint Plain Concrete Pavement

  • Park, Dae-Geun;Suh, Young-Chan;Kim, Hyung-Bae
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.05a
    • /
    • pp.1053-1060
    • /
    • 2003
  • The temperature variation of the concrete pavement in the early age significantly affects the initiation and propagation of its early age cracks. This implies that the measurement and analysis of early age temperature trend are necessary to examine the causes of early age cracks in the concrete pavement. In this study, it is investigated how the early age temperature trend in the concrete pavement affects the random crack initiation and behaviors of saw-cut joints using the actual construction site which is located at the KHC test road. During 72 hours after placing the concrete pavement, the ambient air temperature and temperatures at the top, middle, and bottom in the concrete pavement were measured and the random crack initiation in concrete slabs and early age behaviors in the joints were surveyed. The investigation results indicate that the first random crack was initiated at one of the slabs placed in the early morning which have higher temperature changes during early 72 hours. In addition, the joints that were saw-cut in the morning were cracked more rapidly than those saw-cut in the afternoon.

  • PDF

A Study on the Collection and Analysis of Tire and Road Wear Particles(TRWPs) as Fine Dust Generated on the Roadside (도로변에서 발생되는 미세먼지로써 타이어와 도로 마모입자 채집과 분석 연구)

  • Kang, Tae-Woo;Kim, Hyeok-Jung
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.10 no.3
    • /
    • pp.293-299
    • /
    • 2022
  • Recently, various stakeholder are interested in microplastic to cause pollution of the marine's ecosystem and effort to conduct study of product's life cycle to reduce pollution of marine's ecosystem. The micorplastic refer to materials of the nano- to micro- sized units and it can be classified into primary and secondary. The primary microplastic mean the manufactured for use in the specific field such as the microbead of the cosmetic or cleanser. also, secondary mean the unintentionally generated during use of the product such as the textile crumb by the doing the laundry. Tire and Road Wear Particles(TRWPs) are also defined as secondary microplastic. Typically, TRWPs are created by friction between the tread compound's rubber of the tire and the surface of the road du ring the driving cars. Most of the generated TRWPs exist on the roadside and some of them were carried to marine by the rainwater. In this study, we perform the quantitative analysis of the TRWPs existed in fine dust at the roadside. So, we collected the dust from the roadside in Chungcheongnam-do's C site with a movement of 1,300 cars per the hour. The collected samples were separated according to size and density. And shape analysis was performed using the Scanning Electron Microscope(SEM). We were possible to discover a lot of TRWPs at the fine dust of the 100 ± 20 ㎛. And we analysis it u sing the Thermo Gravimetric Analysis(TGA) and Gas Chromatography/Mass Spectrometer(GC/MS) for the quantitative components from the tire. As a result, it was confirmed that TRWPs generated from the roadside fine dust were included the 0.21 %, and the tire and road components in the generated TRWPs consisted of the 3:7 ratio.

The Planning of Tourism Resource in Gokun-gugok (곡운구곡 관광자원화 계획)

  • Kim, Hyun
    • Journal of Korean Society of Rural Planning
    • /
    • v.13 no.2
    • /
    • pp.133-142
    • /
    • 2007
  • Tourism and recreation spots in Korea have been developed metropolitan cities-oriented that facility construction has too much importance in local tourist site development more than satisfaction and experience. Tourism hardly seems to play its role as a motive power even in locals where tourism occupies much in their economic development. Therefore, the ministry of culture & tourism has introduced a plan to discover cultural and tourism resources as a development alternative which handles theme-ability and specialization. However, most projects of local tourism resources developed since 1999 have resulted similar features comparing to previous and existing tourist spots. And the main objectives of this paper have not been realized very well. This research hence forth suggests a program-based model development in tourism resources, with a case study of Gokun-gugok, one of the historical and cultural sites and is located in Hwachon-gun, Gangwon Province. Main points include: Since the Gokun-gugok landscape has been undermined and been loosed the traditional cultural value due to the road development, this study intends to plan to make the adventure of tourism destination including restoring the site as a cultural place. The Gokun-gugok site needs to develop combining various types of tours and adventures with instructive and educational programs to meet the visitors' needs. This research also intends to precede a development plan based on harmonizing natural, historical and cultural assets of the Gokun-gugok with facility maintains and tourism development. Meanwhile, the study stresses on realizing development of tourism resources categorizing programs by seasonality, visitor's economic class, and visit duration. Asa consequence, the research presents a "Culture & Tourism Academy" which deals with these types of adventure programs and informative educations. To assess feasibility of the development plan in terms of economy, environment and policy, the research conducted the site inspection and examined the site's surroundings, land properties and inundation. 145,000 square meters have been extracted as a feasible development area out of total 392,500 square meters. Finally, the study segmentizes target markets basedon the result of the survey on visitors and local residents. The more segmentized markets employ facilities according to their traditional characters.

Fragmentation Analysis of Daejeon City's Green Biotope Using Landscape Index and Visualization Method (경관의 지수화 및 시각화 기법을 활용한 대전광역시 녹지비오톱 파편화 분석)

  • Kim, Jin-Hyo;Ra, Jung-Hwa;Lee, Soon-Ju;Kwon, Oh-Sung;Cho, Hyun-Ju;Lee, Eun-Jae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.3
    • /
    • pp.29-44
    • /
    • 2016
  • The purpose of this study is to quantitatively and visually analyze the degree of green biotope fragmentation caused by road construction and other development work using FRAGSTATS and GUIDOS tool. Moreover, linking of the endangered species research, we mapped "Biotope Fragmentation Map" of Daejeon-city. The findings of the study are summarized as follows: First, as the result of FRAGSTATS, landscape indices : number of patch(NP), mean patch size (MPS), edge length(TE), mean nearest neighbor distance(MNN), edge shape(LSI) showed meaningful change from fragmentation. Moreover, the result of GUIDOS analysis, middle core-small core-bridge-branch-edge-islet-perforation showed increase of area percentage without large core. Lastly, analysis result of 'Biotope Fragmentation Map' revealed that changing site of large core's size appeared eighteen-site and designated as the special protection area appeared forty-one site. As the result of the two data, overlapping areas that showed both change of core size and revealed special protection areas revealed four site. For example, five species of endangered species appeared on the NO. 4 site in 'Biotope Fragmentation Map'. The findings of this study as summarized above are considered to play an important role in basic data preventing green biotope fragmentation at the planned level from various development work.

A Study on the Performance Evaluation and Comparison of Porous and Drainage Pavement Types (투수성 포장과 배수성 포장 구조형식의 성능평가 및 비교 연구)

  • Kim, Dowan;Jeong, Sangseom;Mun, Sungho
    • International Journal of Highway Engineering
    • /
    • v.20 no.3
    • /
    • pp.47-57
    • /
    • 2018
  • PURPOSES : The permeable pavement type has been rapidly developed for solving problems regarding traffic noise in the area of housing complex and heavy rainwater drainage in order to account for the climate change. In this regards, the objective of this study is to figure out the characteristics of pavement types. METHODS : The laboratory test for deriving optimum asphalt content (OAC) was conducted using the mixtures of the permeable asphalt surface for the pavement surface from Marshall compaction method. Based on its results, the pavement construction at the test field was conducted. After that, the site performance tests for measuring the traffic noise, strength and permeability were carried out for the relative evaluation in 2 months after the traffic opening. The specific site tests are noble close proximity method (NCPX), Light falling deflectometer test (LFWD) and the compact permeability test. RESULTS : The ordered highest values of the traffic noise level can be found such as normal dense graded asphalt, drainage and porous structure types. In the results from LFWD, the strength values of the porous and drainage asphalt types had been lower, but the strength of normal asphalt structure had relatively stayed high. CONCLUSIONS :The porous structure has been shown to perform significantly better in permeability and noise reduction than others. In addition to this study, the evaluation of the properties and the determination of the optimum thickness for the subgrade course under the porous pavement will be conducted using ground investigation technique in the further research.

A Study on the Appropriateness Evaluation of Utilization of green buffer zone - Focusing on green buffer zone, Daejeon City Seo-gu (완충녹지 활용의 적정성 평가 -대전시 서구 완충녹지를 대상으로)

  • Kim, Sun Min;Lee, Shi Young
    • Land and Housing Review
    • /
    • v.10 no.4
    • /
    • pp.41-50
    • /
    • 2019
  • This study was started to study the buffer zone of Daejeon metropolitan city in order to study the policy and environment for the suitability evaluation of the use of green buffer zone. The target of the study was selected as the buffer zone of western buffer, which is frequently used in the Daejeon Metropolitan City, and a preliminary index was selected to evaluate the suitability of the green buffer zone. AHP analysis was conducted to increase the reliability of the preliminary indicators and the weight was analyzed by questionnaires to experts and practitioners. In addition, based on the existing statistical data, we rebuilt the green buffer zone and investigated the current condition, and compared and analyzed the green buffer zone and the places where they did not. The results are as follow. First, unlike the statute interpretation that construction can not be done in buffered green spaces, green buffer zones have been utilized in various ways. However, the lack of advanced citizen consciousness of the residents, the responsibility of the responsible person, and the problem of the management office alone are causing problems. Second, according to the results of AHP questionnaire analysis, functional and stability among the appropriateness indexes of green buffer zone utilization were evaluated highly. Park accessibility and utilization potential also weighed somewhat, and it was judged that the epochal trend was more important in the use of green buffer zones. Third, analysis of the status of Western green buffer zones in Daejeon showed that the utilization rate was more than half. This suggests the necessity of judging the appropriateness of the application of the green buffer zone effectively due to the change of the perception of the green buffer zone of the residents. Fourth, as a result of comparing and analyzing the site where the site is used and the site where it is not, it is found that it is used within a range that does not greatly affect each index. However, as the stability has decreased, we have decided that the utilization method is most damaging to the green zone, and we should strive to improve the stability in future. Finally, the analysis of a red clay road and a red clay road sites decreased from Class I of stability to Grade II. However, the fall figure showed a difference between the 13 % drop rate of the target location and the 5% decline rate of utilization. The difference was analyzed as the difference of width of a red clay road. This can be regarded as one of the ways of damaging the green zone to the minimum extent, which is a great advantage in selecting the future utilization plan.

The Characteristics of Long-term Deformation Behavior During Tunnel Excavation in the Pyroclastic Rock (화산쇄설암 구간에서 터널 공사 중 장기변형거동 특성 연구)

  • Jang, Sukmyung;Han, Heuisoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.23-28
    • /
    • 2022
  • In Korea, 70% of the land is mountainous and structures occupy a high proportion in railway and road construction. In particular, in recent years, the construction of high-speed railways and highways for high-speed driving is rapidly increasing. At the same time, the construction of tunnels is also increasing. The number of tunnel construction cases in which long-term deformation occurs after tunnel excavation is completed is increasing. The stability of these tunnel structures depends entirely on the characteristics of the rock surrounding the tunnel excavation. In the case of pyroclastic rock, which is the subject of this study, it is generally vulnerable to weathering and has a characteristic that its strength decreases over a long period of time. Tunnel design and construction planning considering the strength characteristics of pyroclastic rocks are essential. This study analyzed the cases of over-deformation that occurred at the tunnel site in the pyroclastic section. Based on this study, a plan for tunnel design and construction management in an area where pyroclastic rock exist in the future is presented.