• Title/Summary/Keyword: Road construction site

Search Result 270, Processing Time 0.029 seconds

A Study on operational issues and status of Certificate of Basic OSH Training in Construction (건설업 기초안전보건교육의 운용적 문제점과 실태에 관한 연구)

  • Park, Hyun-Geon;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.53-62
    • /
    • 2017
  • Full embroidery industrial accidents in recent years has shown a declining trend. But disaster embroidery of domestic construction industry were more than 20,000 deaths per year is about 500 people. The government has introduced a construction site often changing the recruitment of new construction based on health and safety as an alternative to road safety education training yisuje of construction workers, daily work periods short. Certificate of Basic OSH Training in Constructions had also been evaluated as successful by reducing the accident rate problem. It is conducted in private educational institutions has occurred on the friction between workers and employers and training costs are difficult to approach workers in the education standards for such facilities due to the superintendent. Educational institutions are institutions that have been caused by excessive competition lowered levels of education. There is also a lack of evaluation that the training is limited to the basic safety knowledge. These details are brought formal safety education purposes only and is introducing the results of other self jyeotgi difficult to reap the proceeds to good effect. In this study, we propose a plan for improving operational problems and enemy status based on research data presented after the Certificate of Basic OSH Training in Construction.

Suitability for Subgrade Material of Weathered Granite Soils in the Gansung area of Gangwon-do (강원도 간성지역에 분포하는 화강풍화토의 도로토공 재료특성 연구)

  • Jeoung, Jae-Hyeung;Yu, Jun;Kim, Jin-Man;Kim, Seung-Hyun;Lim, Kwang-Su
    • The Journal of Engineering Geology
    • /
    • v.21 no.3
    • /
    • pp.239-246
    • /
    • 2011
  • Upon encountering weathering soil at a construction site, it may be necessary to change the design and construction plans for geotechnical structures. When weathering soil is exposed to air, the weathering process proceeds rapidly, resulting in significant damage to geotechnical structures, particle defects, and an increase in moisture sensitivity. The management of weathering-soil compaction is challenging. Because the engineering properties of weathering-soils vary regionally, it is important to report the result of research into the regional characteristics of such soils. At two locations of granite gneiss in the Gansung area of Gangwon-do, geological studies were performed at 22 and 8 sites, respectively. At each site, test samples were collected for analysis by XRD and to measure particle size, consistency, and compaction. To evaluate the suitability of the material for road subgrade, we examined the interrelationship between CBR value and the uniformity coefficient, the 200 sieve passing ratio and the aggregate ${\geq}$ 2 mm) content. We found that for the weathered granite soil, aggregate sized > 2 mm has a significant effect on the CBR value. In addition, the mixing of aggregate sized > 2 mm with sub-quality soil improves the soil condition.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

Merits and Demerits of the Inspection System introduced in Construction of City Planning Road: In Case of Crossing Road of the Aioiyama Green Area in Nagoya

  • Yutaka Okamura
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.2
    • /
    • pp.178-184
    • /
    • 2004
  • The Yatomi - Aioiyama line is a city-planning road that was notified in 1957 and subsequently prepared by land readjustments. Currently, approximately 900m of road pass in the inside of the Aioiyama green area has not been constructed. The surveying briefing session for inhabitants was held in July 1992, the project was authorized by the Ministry of Land, Infrastructure and Transport in September 1993, and the project briefing session for inhabitants was held in September 1993. The site purchase has been completed. At the May 2000 briefing session, inhabitants of the area began voicing dissenting demanding the conservation of the natural environment of this green area. The inspector system serves as the third party, independent of both the administration and the inhabitants. Before finalizing the geometric line form of the road to be constructed, some surveys of animals and plants found along the walking trails carried out intensively in the northern area, which is approximately 50 ha, of the Aioiyama green area. The natural environment inspector submitted a plan for changing the geometric line form of the road decided upon by city planning, and it was approved by the city planning council. If the shelter structure or the retaining wall structure is adopted at the location where large slope faces are produced by excavation or landfill, and if the bridge structure is adopted at the place where stream-lines and walking trails intersect, it leads to a reduction of approximately $40\%$ in the areas for which change is planned. Furthermore, approximately $20\%$ of the area to be changed is restored by returning soil to the roof of the shelter.

  • PDF

Georeferencing of GPR image data using HD map construction method (정밀 도로 지도 구축 방법을 이용한 GPR 영상 데이터 지오레퍼런싱)

  • Shin, Jinsoo;Won, Jonghyun;Lee, Seeyoung
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.6
    • /
    • pp.507-513
    • /
    • 2021
  • GPR (Ground Penetrating RADAR) is a sensor that inspects the pavement state of roads, sinkholes, and underground pipes. It is widely used in road management. MMS (Mobile Mapping System) creates a detailed and accurate road map of the road surface and its surroundings. If both types of data are built in the same area, it is efficient to construct both ground and underground spatial information at the same time. In addition, since it is possible to grasp the road and important facilities around the road, the location of underground pipelines, etc. without special technology, an intuitive understanding of the site is also possible, which is a useful tool in managing the road or facilities. However, overseas equipment to which this latest technology is applied is expensive and does not fit the domestic situation. LiDAR (Light Detection And Raging) and GNSS/INS (Global Navigation Satellite System / Inertial Navigation System) were synchronized in order to replace overseas developed equipment and to secure original technology to develop domestic equipment in the future, and GPR data was also synchronized to the same GNSS/INS. We developed software that performs georeferencing using the location and attitude information from GNSS/INS at the time of acquiring synchronized GPR data. The experiments were conducted on the road site by dividing the open sky and the non-open sky. The road and surrounding facilities on the ground could be easily checked through the 3D point cloud data acquired through LiDAR. Georeferenced GPR data could also be viewed with a 3D viewer along with point cloud data, and the location of underground facilities could be easily and quickly confirmed through GPR data.

Geotechnical Characteristics of Cut Slope in Tertiary Jungja Bain, Ulsan area (울산지역 제3기 정자분지의 도로사면 지반특성)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Lee, Jung-Yup;Rhee, Jong-Hyun;Park, Sung-Kyu;Kim, Kwan-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.107-112
    • /
    • 2005
  • Road is built continuously along with development of industry and cut slope is happened necessarily in road construction. Geoengineers are executing cut slope stability analysis considering various cut slope condition such as topography, geology, hydraulic condition and so on. The Tertiary Jungja Basin is located in the southeastern coastal area of the Korea Peninsula. Jungja Basin area is created by geotectonic movement of the plate after Early Miocene epoch. The northwestern and southwestern boundary of the basin is fault zone. The Basement rock is hornfels (Ulsan Formation). Basin-fills consist of extrusive volcanic rock(Tangsa Andesites), unconsolidated fluviatile conglomerate(Kangdong Formation) and shallow brackish-water sandstone(Sinhyun Formation). The characteristics of cut slopes in this area is different with cut slopes in the other site. Soil layers in this area is unconsolidated sediments and is not formed the weathering and erosion of the rock. So, the depth of soil layer is very thick. Faults of this area are northwest-southeast and northeast-southwest direction. Expandible clay mineral as smectite, chlorite et al. detected from fault gouge using XRD. Therefore, Jungja Basin area must consider the characteristics of the faults and soil layers thickness necessarily cut slopes stability analysis.

  • PDF

The Study on Test for Control of Weeds Invasion in Constructed on Upper Embankment in the Shoulder of a Expressway (고속도로 갓길 외측 성토상단의 잡초침입 억제를 위한 시험 연구)

  • Jeon, Gi-seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.6
    • /
    • pp.227-237
    • /
    • 2015
  • From January 2013 to October 2015, weed invasion control techniques was tested in the test road of Jungbunaeryuk expressway so as to collect preliminary data for the management methods of the upper exterior banking of expressway shoulders. Then, monitoring was conducted and its results are as follows. Mat (sheet), solidifying agent, and mulching (wood chips) were applied for the test and their initial effects of preventing weed invasion were all excellent. It was found that the homogeneity of the wood chip mulching method needs to improve. In the mat method and the mulching method were found to have the most excellent economic feasibility and aesthetics, respectively. The covering degree was found to be the highest at 80% in the control site, followed by the wood chip site at 20% and the solidifying agent site and the non-woven fabric site at 5% each. As for species diversity, the control had the largest variety of species. Two years after the construction, many different species of plants invaded and were growing. Plants including weed didn't tend to invade the slopes applied with non-woven fabric. In addition, weed didn't invade the solidifying agent site and the aesthetics of the upper exterior banking of expressway shoulders was found to be excellent. The wood chip site was found to require consistent management for preventing weed invasion. The mat (sheet) site, the solidifying agent site, and the wood chip mulching site were found to have excellent weed prevention effects. As time passed, the mat (sheet) site and the solidifying agent site showed better weed prevention effects. However, they need consistent monitoring for further application.

The Study on Damaged Hanbuk Mountain Range in Gyeonggi-Do (경기도 한북정맥 훼손유형 연구)

  • Seo, Jung-Young;Lee, Yang-Ju
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.4
    • /
    • pp.65-74
    • /
    • 2010
  • This study is for Hanbuk Mountain Range within Gyeonggi province which is to propose the conservation plan by each damage pattern through site survey of the mountain range. The damage patterns are classified by siding, pointing and lining. The total damaged area is 103 areas: The siding pattern is damaged by developing farmland, mineral and quarry mining, dam, large scale development complex and cemetery park; The pointing pattern is including the development of road, transmission tower and way and mountaineering trail; The construction of electricity and communication facility, military facility, mobile communication station, heliport and shelter. The damages by developing road and large scale development complex are the most cause, and military facility, dam and reservoir, and residential area are the main causes, respectively. One of the compromised situation Hanbuk-Mountain Range usage as per section 7 section (18.45%), 12 section (18.45%) is the largest number of compromised has been surveyed, undermine the situation if you look at the usage by the road 25 locations (24.22%), military facilities and dam and reservoir to undermine this 11 established respectively (10.68%) were the most undermine. Therefore, this research propose the conservation plan as follow: first, need to understand, educate and publicize on Hanbuk-Mounatin Range; second, manage through the regulations and ordinance of Gyeonggi province; third build and expand the law for protecting Baekdu-Great Mountain Range.

Changes in Parks and Green Spaces Ratio According to Land Ownership Processing Method in Urban Development

  • Lee, Sang Jo;Huh, Keun Young;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.21 no.6
    • /
    • pp.545-555
    • /
    • 2018
  • The purpose of this study was to analyze land use plans of 61 residential complexes and identify the factors that caused the variation of urban parks and green space ratio depending on the land ownership processing method. The ratio of urban parks and green space of expropriation districts was higher than that of replotting districts. Within the same city and country as well as other regions, the parks and green space ratio of land expropriation districts increased higher than 7% compared to that of replotting districts. The variation of urban parks and green space ratio was mainly related to the ratio of road. Small housing complexes such as detached house and quasi-residential sites resulted to expand space for road construction, thus, the areas of urban parks or green space came to reduce. The average urban parks and green space ratio in the urban development by the expropriation method and replotting method are 24.5% and 16.8% respectively. In order to prevent the reduction of urban parks and green space ratio according to the preference of detached house sites or quasi-residential sites in development zones, it is necessary to make systematic adjustment such as adjusting the urban parks and green space ratio securing standard.

Appropriate Dimension of Freeway Lane Marking using Computer Based Laboratory Experiment (컴퓨터 기반 실내실험을 통한 고속도로 차선의 적정 규격)

  • Kang, Min Jeong;Oh, Heung Un
    • International Journal of Highway Engineering
    • /
    • v.17 no.1
    • /
    • pp.99-104
    • /
    • 2015
  • PURPOSES : It is well known that experts determined the current standard dimensions of freeway lane markings. However, rigorous engineering rationale could be insufficient regarding whether or not the standard dimensions account for how visible the markings are to the driver. In this study, we seek to optimize the dimensions of freeway lane markings to improve their visibility to drivers. METHODS : The study was conducted as follows. First, alternative lane marking dimensions were selected which could be installed in a test construction site. Second, a video recording was made while driving on the test construction site. Third, subjects were shown the recorded video and then instructed to indicate their preference from among the various lane markings. Lastly, t-tests were applied to assess the statistical significance of differences in the preferences expressed. RESULTS : According to the t-test results, there was no significant difference in the preferences expressed regarding the lane marking widths. However, with regard to the dimensions of freeway lane marking, which represents line marking lengths, gap lengths, and widths of marking, the subjects expressed a preference for specific dimensions such as 6 m:12 m,13 cm, 8 m:12 m,10 cm and 6 m:12 m,10 cm. CONCLUSIONS : In considering the dimensions of freeway lane markings and their relation to visibility by the driver, it was found that dimensions such as 6 m:12 m,13 cm, 8 m:12 m,10 cm and 6 m:12 m,10 cm.