• 제목/요약/키워드: Road construction plan

검색결과 227건 처리시간 0.021초

경기도 한북정맥 훼손유형 연구 (The Study on Damaged Hanbuk Mountain Range in Gyeonggi-Do)

  • 서정영;이양주
    • 한국환경복원기술학회지
    • /
    • 제13권4호
    • /
    • pp.65-74
    • /
    • 2010
  • This study is for Hanbuk Mountain Range within Gyeonggi province which is to propose the conservation plan by each damage pattern through site survey of the mountain range. The damage patterns are classified by siding, pointing and lining. The total damaged area is 103 areas: The siding pattern is damaged by developing farmland, mineral and quarry mining, dam, large scale development complex and cemetery park; The pointing pattern is including the development of road, transmission tower and way and mountaineering trail; The construction of electricity and communication facility, military facility, mobile communication station, heliport and shelter. The damages by developing road and large scale development complex are the most cause, and military facility, dam and reservoir, and residential area are the main causes, respectively. One of the compromised situation Hanbuk-Mountain Range usage as per section 7 section (18.45%), 12 section (18.45%) is the largest number of compromised has been surveyed, undermine the situation if you look at the usage by the road 25 locations (24.22%), military facilities and dam and reservoir to undermine this 11 established respectively (10.68%) were the most undermine. Therefore, this research propose the conservation plan as follow: first, need to understand, educate and publicize on Hanbuk-Mounatin Range; second, manage through the regulations and ordinance of Gyeonggi province; third build and expand the law for protecting Baekdu-Great Mountain Range.

아파트단지에서 아파트 층별 및 배치구조에 따른 도로교통소음 평가 (Assessment of Road Traffic Noise by Apartment Floor and Arrangement Construction of Building in Apartment Complex)

  • 이내현;선우영;조기철;조경덕;조일형
    • 한국환경보건학회지
    • /
    • 제32권2호
    • /
    • pp.118-125
    • /
    • 2006
  • The road traffic noise has been increasing broader effects on urban areas as well as rural areas because of rapidly increasing traffic volume and newly-constructed roads. 10 sites in building development areas were selected and the noise levels were measured by the apartment floors and by the various block plans of apartment complex. The results showed that the highest traffic noise level was obtained at the 5 and 7 floors on the apartment floors. On the basis of 7 floor with the highest level, the correction coefficient obtained from noise reduction by each floor and measurement point was -5.54 dB(A)(1st floors), -0.96 dB(A)(3rd floors), -0.38 dB(A)(5th floors), 0.00 dB(A)(7th floors), -1.98 dB(A)(l0th floors), -3.10 dB(A)(13th floors), -3.45 dB(A)(15th floors). The level of road traffic noise in the arrangement construction of right angle was about 3.0 dB(A) at N-4 point and 2.1 dB(A) at N-6 point lower than that of a plan figure, respectively. The results suggested that application of correction coefficient obtained by the apartment floor and by the arrangement construction can be improved in road traffic noise.

공동주택에서의 소음보정계수에 관한 연구 (A Study on the Noise Correction Factor in Apartment Complex)

  • 이내현;선우영;박영민;박선환;조일형
    • 환경영향평가
    • /
    • 제14권5호
    • /
    • pp.247-254
    • /
    • 2005
  • Road traffic noise has increasing broader effects on urban areas as well as rural areas because of rapidly increasing traffic volume and newly-constructed roads. 10 sites in building development areas were selected and the noise level were measured by the apartment floors and by the various block plans of apartment complex. Analysis result, about correction factor, in the case of right angle arrangement, apply - 2.5dB(A). In the case of apartment house correlation of each floor apply 1st floors 0dB(A), 2st floors 1.2dB(A), 3st floors 2.1dB(A), 4st floors 2.6dB(A), 5st floors 2.7dB(A), 6st floors 2.7dB(A), 7st floors 2.4dB(A), 8st floors 2.0dB(A), 9st floors 1.6dB(A), 10st floors 1.1dB(A), 13st floors 0.2dB(A), 15st floors 0.5dB(A). The level of road traffic noise in the arrangement construction of right angle was about 3.0dB(A) at N-4 point and 2.1dB(A) at N-6 point lower than that of a plan figure, respectively. The results suggested that application of correction coefficient obtained by the apartment floor and by the arrangement construction can be improved in road traffic noise. The results suggested that application of correction coefficient obtained by the apartment floor and by the arrangement construction can be improved in road traffic noise.

도로비탈면 녹화공사 평가방법의 개선 방안 연구 - 절토부 토사를 중심으로 - (A Study on the Improvement of Evaluation Methods for Roadside Slope Revegetation - Focus on the Cut-soil Slope -)

  • 김남춘
    • 한국환경복원기술학회지
    • /
    • 제23권6호
    • /
    • pp.187-200
    • /
    • 2020
  • Despite the eco-friendly route plan, road slopes were collapsed due to road construction, resulting in human and property damage. To solve this problem, the Ministry of Land, Transport and Maritime Affairs established guidelines in 2009 to conduct a test-bed for slope recording considering the conditions of the site and the ecological environment, and divided them into recording quality and economic evaluation. The following results were obtained by analyzing 183 construction methods of cut-soil sections at 60 sites from 2012 to 2018 for road slope afforestation research. Straw net+seedspray, vegetation media spray method 1T, 3T were used the most, and vegetation media spray method 3T(patent) was excellent in quality, and straw net+seedspray was excellent in economics. As a result of analyzing the market unit price and the construction unit price, vegetation media spray method submitted the construction unit price at up to 60% lower than the market unit price. As a result of the analysis of the key factors of the greening method evaluation, the economic assessment had the greatest influence on all evaluation items. Problems in the evaluation method of revegetation were first identified as problems in the allocation of points and secondly as problems in the evaluation criteria. As for the improvement of the economic assessment criteria, the method was proposed to evaluate the same method based on market unit price when the same method was constructed, and not to conduct an economic assessment if there was a difference in market unit price between methods, or to add weight to the scores. Based on the monitoring data of 60 road slopes, this study drew up problems and improvement measures. However, with regard to scoring, research on appropriate scoring is needed by examining the current status.

Optimisation of Infrastructure within the Melbourne Urban plan

  • Koorosh Gharehbaghi;Vincent Raso
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.299-303
    • /
    • 2011
  • Congestion is a growing concern of many global cities and the demands on Infrastructure services within a locale coupled by the rising expectations from the growing population places stress on these cities. This entails the ability to build a sustainable community that requires an understanding and recognition of Population growth, changing demographics and the ever changing urban development on both a macro and micro level. Infrastructure is an integral part of Australian economy, particularly the 'Infrastructure Assets Management' which highlights the importance towards the development of sustainable communities for Melbourne's future. Melbourne 2030 is a comprehensive representation of government's response to a wide-ranging population growth within Melbourne metropolitan and surrounding areas. Urban plan and specific Infrastructure Assets Planning needs not only to provide sufficient Infrastructure to a community, but it must also be efficient and innovative so that it produces an optimised management system. A system that incorporates engineering techniques that will be sustainable for decades to come by maintaining an acceptable level of services to its intended community in an effective manner, which also strengthens service delivery. The fundamental challenges for optimization of Infrastructure with the Melbourne urban plan is, the ability to manage and sustain maintenance of Infrastructure to provide the acceptable level of service required by the community in a most effective manner which also strengthens service delivery to contribute towards Melbourne 2030. This paper particularly investigates some of the fundamental issues within the Melbourne urban plan such as Infrastructure Asset Management, AusLink and the Australian Road Management Act 2004, which the Governments at all levels must deal with to provide an economically viable solution to the changing Infrastructure so it may suits the needs and services the strategies of a metropolis.

  • PDF

근접시공시에 발생하는 진동영향에 관한 평가 (An Estimation for Vibration Effects Occuring in Adjacent Construction)

  • 윤배식;백성철;이섬범;남열우;김홍택
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2007년도 정기총회 및 학술발표대회
    • /
    • pp.271-274
    • /
    • 2007
  • Lately, there are actively proceeding in making a plan for subway construction, a high-speed railway construction and a expansion of road and also all kinds of large-scaled construction in Korea. Construction works were delayed from noises and vibrations occurred by usage of a large-sized construction equipments and driven and also blast or there were often stopped from them under construction. Therefore, this study was modeling operation of the cyclic loading and conforming effects from grasping displacement-changing method through a variable analysis.

  • PDF

관개경관 구도분석에 따른 보전방안에 관한 연구 - 청주 가로수길 중심으로 - (The Study on the Conservation According to Analysis of Composition of Canopied Landscape - A Case of Chongju Garosoo-gill-)

  • 권상준;홍영록
    • 한국환경과학회지
    • /
    • 제14권4호
    • /
    • pp.379-387
    • /
    • 2005
  • This study aims to establish the schematic plan for renewing canopied landscape of Garosoo-gil of Chongju and to review to conserving the resources of streetscape of the Garosoo-gil. The study reinterpreted the Garosoo-gil of tree canopied road, representing meanings and functions of the road with main traffics as well as the image of Chongju city achieved buffer zone for open spaces to city green network. The study relied on the present composition, the status of road trees and streetscapes; additionally, the present streets cape was performed with examinations of those factors, the composition of roadscape, the change of structure according to visitor's movement and road construction condition, which was composed with focused places on concerning the loss and demolition of trees by Garosoo-gil. According to the result, the streetscape could be prospected to decreasing the number of trees and changing the sceneries of streetscape. As a result, the dominant canopied streetscape was found three areas. The analysis could help to find a way to establish the schematic plan for making the streets cape be symbolized and take place identified and better festival events with greens. The study could not only suggest the place of the streetscape to be divided into conservation area and protection area, for tree canopy but also establish alternatives for making the Garosoo-gil be a beautiful street park and enduring for a better landscape of main entrance road.

도로부문 교통기초자료 구축사업의 문제점 분석 및 개선방안 연구 (교통수요 예측 자료를 중심으로) (A Study on Analysis of Issues in Developing a Basic Road Transport Database and Proposals for Enhancing Its Reliability and Data Sharing (with Focus on Databases Related to Road Transport Demand Estimation))

  • 이상협;오창석
    • 대한교통학회지
    • /
    • 제27권6호
    • /
    • pp.55-67
    • /
    • 2009
  • 우리나라의 경우 기존에 시행된 대부분의 도로건설사업이 교통수요의 과다 예측으로 인하여 재정의 낭비를 초래하였다. 이 같은 교통수요 예측 오류 발생의 원인은 여러 가지가 있을 수 있지만 사용된 교통기초자료의 낮은 신뢰성과 기관 간 정보연계 미흡을 주요한 원인으로 꼽을 수있다. 이에 본 연구는 대표적 교통기초자료인 국가교통DB와 수도권 가구통행실태는 향후 추진될 도로건설사업계획 수립에 크게 활용될 것이며 이 자료들도 현재 낮은 신뢰성과 기관 간 정보연계 미흡의 문제가 있으므로 개선이 필요하다는 인식하에서 시도되었으며 도로부문 교통기초자료 구축사업의 문제점을 교통수요 예측 관련 자료를 중심으로 살펴보고 개선방안을 제시하고자 하였다.

서울시 도로포장 상태에 대한 분석 및 구조적 개선방안 (Analysis of Road Pavement Condition and Structural Improvement Plan)

  • 배윤신;신경엽
    • 한국재난정보학회 논문집
    • /
    • 제8권2호
    • /
    • pp.119-137
    • /
    • 2012
  • 본 연구는 서울시 도로포장의 구조적 개선을 위하여 포장관리시스템을 이용하여 도로파손 발생과 도로포장 상태를 분석하였다. 심층면접조사에서는 플랜트, 시공 및 감리 분야 실무자 의견을 통하여 서울시 도로포장 관리의 문제점을 도출하였으며, 선진 도로포장 관리 사례를 조사하여 서울시 도로포장 관리의 개선방안을 모색하였다. 주요 결론으로는 서울시 중하중과 여름철 집중호우에 대한 도로파손에 대한 대책이 필요하고 생애주기비용 분석을 통하여 획일적인 덧씌우기 공법으로 인한 도로포장의 조기파손의 문제점을 확인하였다. 설문조사결과, 실무자에 대한 교육의 강화와 아스팔트 혼합물 생산 및 시공시 보다 철저한 온도 관리의 필요성이 제기되었다.

스와질랜드 IT공대 및 의대 부지마스터플랜 계획안 (Plan for the Medical and Information Technology University Masterplan)

  • 이지연
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2007년도 추계학술발표대회 논문집
    • /
    • pp.163-164
    • /
    • 2007
  • This plan for the Medical and Information Technology University which is built by the will and support of Korea at the small county Kingdom of Swaziland in Africa. As we consider the essential condition of self-supporting of nation is the education for the poor country in culturally and socially. The establish the University in the downtown is a significant work in socially and culturally as the urban infrastructure. Besides, this is presenting the master plan not only educational institution purpose but the place for the desirable communication between regional resident in educational and cultural circumstances. It is the main concept for this plan that flexible arrangement of the lower stories buildings on the gentle hill according to the geographic features of the field, road situation, supporting equipment, construction ability and Building materials.

  • PDF