• Title/Summary/Keyword: Road Section

Search Result 636, Processing Time 0.023 seconds

Effectiveness of the Peripheral Transverse Line as Speed-Reduction Treatment on Korean Expressway Ramps (고속도로 노면표시 감속유도시설 효과평가)

  • Lee, Seongkwan Mark;Lee, Kiyoung;Kim, Seokchool
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.85-92
    • /
    • 2012
  • PURPOSES : Since expressways in South Korea are toll roads, many trumpet type interchanges exist, resulting in the installation of loop ramps very frequently. While the travel speed of the main lane is designed to be 100-110 km/h, the structure of a loop ramp is different and is designed for a minimum speed of 40 km/h. In fact, most of the actual travel speeds measured on the ramp exceed the designated speed, which has been a major problem in traffic safety. In this research, a type of pavement marking speed-reduction treatment called the "Peripheral Transverse Line" is installed on expressway loop ramps in order to study the change of driving speeds after the installation. METHODS : To verify statistically the change, this speed-reduction treatment has been installed on the Chungju interchange and the Yeoju junction. The driving speeds before the installation were compared with driving speeds both one month and five monthsafter the installation. RESULTS : As a result, the reductions of the average driving speeds after the treatment were statistically significant. More specifically, the average driving speeds of the Chungju interchange were reduced by 7.1-7.7 % for its tangent road section, and the speeds decreased by 8.5-9.5 % for its curve section. Similarly, in the Yeoju junction, an average speed reduction of 2.9-4.8 % for its tangent section was measured, along with 3.9% long-term speed reduction for its curve section. CONCLUSIONS : Since the pavement marking speed-reduction treatment has been partially proven to be effective from this research, we expect to expand this treatment and re-confirm the effect from a long-term perspective in the future.

Analysis of the right to sunshine for elevated structure construction (고가 구조물 건설에 따른 일조권 분석)

  • 강기수;김상석;양승태;강인준
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF

강원산간지방 도로확장 대절토부 사면 안정 처리에 관한 연구

  • 이승호;황영철;송요원;정응환;지영환;노흥제
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.529-536
    • /
    • 2003
  • In domestic case occurrence of cut slopes according to construction and expansion of road is necessary more than 70% of country has been consisted of mountain area. In the case of Kang-won Do, there are much mountains locals in road wiping away a disgrace and expanded and slant is connoting collapse danger of incision side by each kind calamity being urgent. When route alteration enforces disadvantageous road extension, stability examination and processing way about large slope happened are serious. During road extension work in the Kang-won DO secure stability for falling rock of road slope and failure that happen and established suitable reinforcement and countermeasure in reply in necessity. The Slope is divided rock slope and soil slope, and then in order to analysis soil slope apply LEM theory. And rock slope examined stability about stereographic projection and wedge failure. Is going to utilize in reinforcement and failure prevention if it is efficient cutting as reinterpreting stability and secure stability and wish to consider effective and robust processing plan of great principle earth and sand side, and present countermeasure inside with these data hereafter applying suitable reinforcement countermeasure about unstable section.

  • PDF

Analysis on Factors Affecting Traffic Accident Severity - Case Study : Arterial Included Curve Section - (교통사고심각도 영향요인 분석에 관한 연구 - 곡선부가 포함된 국도를 중심으로 -)

  • Park, Jae Hong;Yun, Duk Geun;Sung, Jung Gon
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.6
    • /
    • pp.84-89
    • /
    • 2013
  • The main causes of traffic accidents can be classified by 3 factors - human error, vehicle deficiency and road environmental problem and most accidents occurs not only 1 factor but combination of 2 or 3-factors. Among these factors, road environmental factor is the most important factor due to influence the behavior of cars and road users and road environmental factor affects 30% of total accidents approximately. The 5 years traffic accidents data analyzed to verify the accidents severity on Korea National Highways. In order to analyze the severity, Ordered Probit Model was used. As a independent variables of this model the number of lane, neighbor road environments, sight distance, vertical grade, lane width, shoulder width and traffic volume were used and as a dependent variables the minor injuries, serious injuries and fatalities were used. Research results shows that sight distance and lane width are identified as significant factors for the traffic accident severity and lesser sight distance and lane width shows greater traffic accident severity.

Pedestrian Accident Severity Analysis and Modeling by Arterial Road Function (간선도로 기능별 보행사고 심각도 분석과 모형 개발)

  • Beck, Tea Hun;Park, Min kyu;Park, Byung Ho
    • International Journal of Highway Engineering
    • /
    • v.16 no.4
    • /
    • pp.111-118
    • /
    • 2014
  • PURPOSES: The purposes are to analyze the pedestrian accident severity and to develop the accident models by arterial road function. METHODS: To analyze the accident, count data and ordered logit models are utilized in this study. In pursuing the above, this study uses pedestrian accident data from 2007 to 2011 in Cheongju. RESULTS : The main results are as follows. First, daytime, Tue.Wed.Thu., over-speeding, male pedestrian over 65 old are selected as the independent variables to increase pedestrian accident severity. Second, as the accident models of main and minor arterial roads, the negative binomial models are developed, which are analyzed to be statistically significant. Third, such the main variables related to pedestrian accidents as traffic and pedestrian volume, road width, number of exit/entry are adopted in the models. Finally, Such the policy guidelines as the installation of pedestrian fence, speed hump and crosswalks with pedestrian refuge area, designated pedestrian zone, and others are suggested for accident reduction. CONCLUSIONS: This study analyzed the pedestrian accident severity, and developed the negative binomial accident models. The results of this study expected to give some implications to the pedestrian safety improvement in Cheongju.

Development of Destination Optimal Path Search Method Using Multi-Criteria Decision Making Method and Modified A-STAR Algorithm (다기준의사결정기법과 수정 A-STAR 알고리즘을 이용한 목적지 최적경로 탐색 기법 개발)

  • Choi, Mi-Hyeong;Seo, Min-Ho;Woo, Je-Seung;Hong, Sun-Gi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.891-897
    • /
    • 2021
  • In this paper, we propose a destination optimal route algorithm for providing route finding service for the transportation handicapped by using the multi-criteria decision-making technique and the modified A-STAR optimal route search algorithm. This is a method to set the route to the destination centering on safety by replacing the distance cost of the existing A-STAR optimal route search algorithm with the safety cost calculated through AHP/TOPSIS analysis. To this end, 10 factors such as road damage, curb, and road hole were first classified as poor road factors that hinder road driving, and then pairwise comparison of AHP was analyzed and then defined as the weight of TOPSIS. Afterwards, the degree of driving safety was quantified for a certain road section in Busan through TOPSIS analysis, and the development of an optimal route search algorithm for the transportation handicapped that replaces the distance cost with safety in the finally modified A-STAR optimal route algorithm was completed.

China's Digital Silk Road in Southeast Asia and Vietnam's Responses from 2015 to 2021

  • Dao D. Nguyen
    • SUVANNABHUMI
    • /
    • v.15 no.2
    • /
    • pp.57-90
    • /
    • 2023
  • China launched the Digital Silk Road (DSR) in 2015 as part of the existing Belt and Road Initiative (BRI) to expand its influence in digital and technological development across Asia, Europe, and Africa. Southeast Asia is one of the key targets of the Digital Silk Road due to its geographical proximity to China and the rapid growth of the digital sphere. Although the DSR opens several potential opportunities for the Association of Southeast Asian Nations (ASEAN) member states to foster the digitalization process in the region, how each country reacts to projects under the DSR is varied. Secondly, Vietnam is the only ASEAN member state that has not signed any official agreement under the BRI framework, and thirdly, Vietnam opted out of Huawei technology. This paper aims to understand the perspective of Vietnam and how Vietnam has responded to the growing technological presence of China in Southeast Asia until 2021. By using qualitative methods, the author argues that the DSR has allowed Beijing to overcome the limitations of the original strategy, BRI, and strengthen its influence in the field of information and communication technologies, particularly fifth-generation (5G) telecommunications. Furthermore, the paper examines Vietnam's digital development and digital diplomacy and how the Vietnamese government has responded to DSR projects. In light of both the potential threats and economic benefits that the DSR has brought to Vietnam and Southeast Asian countries, in the last section, the policy implications for cooperation are discussed.

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

Priority Area Prediction Service for Local Road Packaging Maintenance Using Spatial Big Data (공간 빅데이터를 활용한 지방도 포장보수 우선지역 예측 서비스)

  • Minyoung Lee;Jiwoo Choi;Inyoung Kim;Sujin Son;Inho Choi
    • Journal of Intelligence and Information Systems
    • /
    • v.29 no.3
    • /
    • pp.79-101
    • /
    • 2023
  • The current status of local road pavement management in Jeollabuk-do only relies on the accomplishments of the site construction company's pavement repair and is only managed through Microsoft Excel and word documents. Furthermore, the budget is irregular each year. Accordingly, a systematic maintenance plan for local roads is necessary. In this paper, data related to road damage and road environment were collected and processed to derive possible areas which could suffer from road damage. The effectiveness of the methodology was reviewed through the on-site inspection of the area. According to the Ministry of Land, Infrastructure and Transport, in 2018, the number of damages on general national roads were about 47,000. In 2019, it reached around 38,000. Furthermore, the number of lawsuits regarding the road damages were about 93 in 2018 and it increased to 119 in 2019. In the case of national roads, the number of damages decreased compared to 2018 due to pavement repairs. To measure the priorities in maintenance of local roads at Jeollabuk-do, data on maintenance history, local port hole occurrence site, overlapping business section, and emergency maintenance section were transformed into data. Eventually, it led to improvements in maintenance of local roads. Furthermore, spatial data were constructed using various current status data related to roads, and finally the data was processed into a new form that could be utilized in machine learning and predictions. Using the spatial data, areas requiring maintenance on pavement were predicted and the results were used to establish new budgets and policies on road management.

PIV Measurements of Three-Dimensional Wake Around a Road Vehicle (자동차 후류에 대한 3차원 유동의 PIV 측정)

  • Kim Jinseok;Kim Sungcho;Sung Jaeyong;Kim Jeongsoo;Choi Jongwook
    • 한국가시화정보학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.1-4
    • /
    • 2004
  • The PIV measurements are performed to get the quantitative flow visualization around a road vehicle. The model scaled with 1/48 is located in the middle test section of the closed-loop water tunnel and the measuring system consists of CCD camera, diode laser, synchronizer, and computer. The experimental data are obtained at two Reynolds numbers of 50,000 and 100,000 based on the model length. The quasi-three-dimensional isovorticity surfaces, based on two-dimensional velocity field data, are generated. There is little difference between the results in part of the recirculation region and the vorticity contour according to the Reynolds number. Also a little bit complicated three dimensional flows are predicted behind the road vehicle.

  • PDF