• Title/Summary/Keyword: Road Management System

Search Result 735, Processing Time 0.03 seconds

Development and performance evaluation of SB3-level roadside barrier for highway transition zone (고속국도용 SB3등급 전이구간 방호울타리 개발 및 성능평가)

  • Lee, Jungwhee;Cho, Jong-Seok;Lee, Jae-Hyuk
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.13-21
    • /
    • 2017
  • PURPOSES : In this research, an SB3-level roadside barrier for a highway transition zone that meets the newly established guide Installation and Management Guide for Roadside Safety Appurtenance is developed. Its performance is evaluated by a numerical simulation and real-scale vehicle impact test. METHODS : The commercial explicit dynamic software LS-DYNA is utilized for impact simulation. An FE model of a passenger vehicle developed and released by the National Crash Analysis Center (NCAC) at George Washington University and a heavy goods vehicle (HGV) model developed by the TC226/CM-E Work Group are utilized for impact simulation. The original vehicle models were modified to reflect the conditions of test vehicles. The impact positions of the passenger vehicle and truck to the transition guardrail were set as 1/2 and 3/4 of the transition region, respectively, according to the guide. RESULTS : Based on the numerical simulation results of the existing transition barrier, a new structural system with improved performance was suggested. According to the result of a numerical simulation of the suggested structural system, two sets of transition barriers were manufactured and installed for real-scale vehicle impact tests. The tests were performed at a test field for roadside safety hardware of the Korea Highway Corporation Research Institute. CONCLUSIONS : The results of both the real-vehicle impact tests and numerical simulations of the developed transition barrier satisfied the performance criteria, and the results of numerical simulation showed good correlation with the test results.

Groundwater and Surface Water Hydrology in the Lake Rotorua Catchment, New Zealand, and Community Involvement with Lake Water Quality Restoration

  • White, Paul A.;Hong, Timothy;Zemansky, Gil;McIntosh, John;Gordon, Dougall;Dell, Paul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.8-14
    • /
    • 2007
  • Water quality in Lake Rotorua, New Zealand, deteriorated since the 1960s because of excessive phytoplankton growths due principally to increasing nitrogen and phosphorus in the lake waters. Nutrient concentrations in eight of the nine major streams feeding Lake Rotorua have increased since 1965. The groundwater system has a key role in the hydrology of the Lake Rotorua catchment and the groundwater system is probably the control on the time delay between intensification of agricultural land use and response of surface water quality. All major, and many minor streams, in the catchment are fed by springs. Two lithological units are most important to groundwater flow in the Lake Rotorua catchment: Mamaku Ignimbrite, erupted in about 200,000 years ago and Huka Formation sediments which filled the caldera left by the Mamaku Ignimbrite eruption. Rainfall recharge to groundwater in the groundwater catchment of Lake Rotorua is estimated as approximately 17300 L/s. A calibrated steady-state groundwater flow model estimates that approximately 11100 L/s of this flow discharges into streams and then into the lake and the balance travels directly to Lake Rotorua as groundwater discharge through the lake bed. Land use has impacted on groundwater quality. Median Total Nitrogen (TN) values for shallow groundwater sites are highest for the dairy land use (5.965 mg/L). Median TN values are also relatively high for shallow sites with urban-road and cropping land uses (4.710 and 3.620 mg/L, respectively). Median TN values for all other uses are in the 1.4 to 1.5 mg/L range. Policy development for Lake Rotorua includes defining regional policies on water and land management and setting an action plan for Lake Rotorua restoration. Aims in the action plan include: definition of the current nutrient budget for Lake Rotorua, identification of nutrient reduction targets and identification of actions to achieve targets. Current actions to restore Lake Rotorua water quality include: treatment of Tikitere geothermal nitrogen inputs to Lake Rotorua, upgrade of Rotorua City sewage plant, new sewage reticulation and alum dosing in selected streams to remove phosphorus.

  • PDF

Application of the High Resolution Aerial Images to Estimate Nonpoint Pollution Loads in the Unit Load Approach (원단위법에 의한 비점오염부하량 산정 시 토지피복 특성을 반영하는 고해상도 항공영상의 활용방안)

  • Lee, Bum-Yeon;Lee, Chang-Hee;Lee, Su-Woong;Ha, Do
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.5
    • /
    • pp.281-291
    • /
    • 2009
  • In Total Water Pollutant Load Management System of Korea, unit load approach based on land register data is currently used for the estimation of non-point pollutant load. However, a problem raised that land register data could not always reflect the actual land surface coverages which determine runoff characteristics of non-point pollution sources. As a way to overcome this, we tried to establish quantitative relationships between the aerial images (0.4m resolution) which reflect actual land surface coverages and the land registration maps according to the 19 major designated land-use categories in Kyeongan watershed. Analyses showed different relationships according to the land-use categories. Only a few land-use categories including forestry, road and river showed essentially identical and some categories such as orchard, parking lot and sport utility site showed no relationships at all between image data and land register data. Except for the two cases, all the other categories showed statistically significant linear relationships between image data and land register data. The analyses indicate that using high resolution aerial maps is a better way to estimate non-point pollutant load. If the aerial maps are not available, application of the linear relationships as conversion factors of land register data to image data could be an possible option to estimate non-point pollutant loads for the specific land-use categories in Kyeongan watershed.

A Study of Recovery Standards and Post-Evaluation Method for Long Term Community Preventive Recovery Plan (개선복구계획 수립기준 및 효과측정 연구)

  • Jung, Woo-Young;Jung, Sang-Man;Choi, Hyun-Kyu;Lee, Sang-Moon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.2
    • /
    • pp.31-37
    • /
    • 2009
  • Most damages of civil infrastructures under natural disasters are frequently occurred at surrounding areas of the river or the road. Every year, Recovery for these disaster damages are performed by the government. Recently, the government decide to change current recovery plan system because current recovery plan which doesn't consider future disaster impacts at a site has been proved to be ineffective. Accordingly, new permanency recovery plan system is needed and its corresponding ideas are presented in this research considering more detailed disaster damage classifications and cause assessments. The proposed permanency recovery plan would also provide more systematic and diverse recovery response strategies including both two concepts, for example Preparedness considered by risk assessment and management, and Mitigation investigated by hazard impact analyses.

Study on Fatality Risk of Older Driver and Traffic Accident Cost (고령운전자 연령구간별 사망사고 발생위험도와 사고비용 분석 연구)

  • Choi, Jaesung
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.4
    • /
    • pp.111-118
    • /
    • 2018
  • Korea is facing a surge in the aging population, showing that population aged 65 and above will be accounted for 42.5% of the total population in 2065 with the emphasis on the over-80 population consisting of 19.2%. In response to this abrupt change in population structure, the number of traffic fatality accident referring to older driver as aged 65+ years had been increasing from 605 fatalities in 2011 to 815 fatalities in 2015 resulting in increases in 34.7% in oppose to happening to decreases in 17.2% about non-older driver. With Logit analysis based on Newton-Raphson algorithm utilizing older driver's traffic fatality data for the 2011-2015 years, it was found that the likelihood of an accident resulting in a fatality for super older driver aged 80 years and above considerably increased compared to other older driver with aging classification: 2.24 times for violation of traffic lane, 2.04 times for violation of U-turn, 1.48 times for violation of safety distance, 1.35 times for violation of obstacle of passing; also average annual increase of traffic accident cost related to super older driver was fairly increased rather than other older driver groups. Hence, this study proposes that improving and amending transport safety system and Road Traffic Act for super older driver needs to be urgently in action about license management, safe driving education, etc. when considering the increase of over-80 population in the near future. Also, implementing a social agreement with all ages and social groups to apply with advanced driver assistance system for older driver groups will be able to become a critical factor to enhance safe driving over the face of the country.

A Study on the Necessary Spaces and Area Standards of Integration Facility for Early Childhood Education and Care (영유아 교육·보육 통합시설의 필요 공간과 면적기준에 관한 연구)

  • Cho, Jin Il;Choi, Hyeong Ju
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.17 no.2
    • /
    • pp.22-37
    • /
    • 2018
  • This study suggests desirable disaster safety education curriculum through analyzing the operational status of the school disaster safety management training course and demand survey of school staff. First, the problem of the disaster safety training course of the school is not connected with the lack of law and system and the school disaster safety job. Second, improvement of law and system and variety of training should be made to acquire professional knowledge. Third, it is necessary to divide curriculum into the following four categories, according to educational needs of public officials ; Educational administration officers course focused on facility safety, maintenance and disaster countermeasure. Educational officials in technical post course addressing approval and permission of school facility projects, seismic reinforcement of school building, etc. Educational supervisors course covering roles and responsibilities of the school safety supervisors in the event of disaster. Teaching staffs course focused on safety instructions for students. Fourth, it is found that lectures and experiential learning methods are the most desirable methods of teaching and learning, and the major ranks are earthquake disaster, fire, gas, typhoon, school road, and electrical safety.

Establishment and Application of Computer-Assisted Environmental Information System for Land Use Zoning and Environmental Analysis of Natural Park (자연공원의 환경분석 및 용도지역설정을 위한 전산환경정보체계의 수립과 적용)

  • Lee, Myung-Woo
    • Journal of Environmental Impact Assessment
    • /
    • v.2 no.1
    • /
    • pp.39-55
    • /
    • 1993
  • The importance of urban and regional natural park increases because of the needs for preserving the natural resources and providing with natural recreation space in nature. This planning of natural park management should be established based on the research of the various natural resources in the park. But for the lack of effective data synthesizing methods and concepts, only some restricted factors for zoning plan are considered even though GIS computer system for large complex simulation is used. Therefore, in this study three ecological zoning models such as Basic Factor Model (BFM), Visual Landscape Model (VLM) and Comprehensive Ecological Model (CEM) are proposed and applied to Byounsan Peninsula Nature Park(BPNP) for comparison with the current natural park zoning. The BFM has three components -elevation, slope and vegetation. The VLM has applied with six components -elevation, slope, vegetation, road type, and the visual distance. Finally the CEM's modelling factors have included all of BFM, VLM components are added with the land use type, nature and historic resource factors. The zoning concept of BPNP was based on "Minimization" focused on the specific factors. But introduced modelling concept is "Optimization" based on the total ecological environment. So the result of the modelling has larger area for preservation and development zoning compared with the current zoning whose characteristics are ambiguous which allows the environmental destruction. The future study issues will be the determination of the weighting factor, component reconsideration based on the ground truth data and the agriculture residential area zoning.

  • PDF

Development of AR System for Asphalt Pavement Compaction Operation and Suggestion for Accompanying Education Program (AR을 이용한 아스팔트 포장 다짐공사 지원 시스템 구축 및 교육과정 제안)

  • Kim, Namho;Cho, Namjun;Kim, Noah
    • Journal of Practical Engineering Education
    • /
    • v.11 no.1
    • /
    • pp.33-41
    • /
    • 2019
  • A pavement construction process consists of series of lay-down operation for pavement materials to form a designated thickness and compaction operation for the lay-down layer to form a designated strength. A technological breakthrough in pavement compaction equipment was made in last 15 years in western countries: intelligent compaction roller, that is equipped with GPS along with other pavement response sensors is becoming a game-changer in pavement construction. This paper introduces AR system that may be used in asphalt pavement compaction operation using intelligent compactor. Since AR technology is very new concept in road construction society, a suggestion for accompanying education program was also made for specific task group in pavement compaction operation. Since AR technology has not been introduced in asphalt pavement compaction operation, the AR compaction management would lead the construction quality of asphalt pavement to the beyond level.

A Study on Field Applicability of Underground Electric Heating Mesh (매설용 전기 발열 매시의 융설 효과에 대한 현장 적용성 연구)

  • Suh, Young-Chan;Seo, Byung-Seok;Song, Jung-Kon;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • PURPOSES : This study aims to investigate the snow-melt effects of an underground electric heater's snow-melt system via a field performance test, for evaluating the suitability of the system for use on a concrete pavement. The study also investigates the effectiveness of dynamic measures for clearing snow after snowfall events. METHODS : In order to check the field applicability, in November 2010, specimens were prepared from materials used for constructing concrete pavements, and underground electric heating meshes (HOT-mesh) were buried at depths of 50 mm and 100 mm at the site of the Incheon International Airport Construction Research Institute. Further, an automatic heating control system, including a motion sensor and pavement-temperature-controlled sensor, were installed at the site; the former sensor was intended for determining snow-melt effects of the heating control system for different snowfall intensities. Pavement snow-melt effects on snowy days from December 2010 to January 2011 were examined by managing the electric heating meshes and the heating control system. In addition, data on pavement temperature changes resulting from the use of the heating meshes and heating control system and on the dependence of the correlation between the outdoor air temperature and the time taken for the required temperature rise on the depth of the heating meshes were collected and analyzed. RESULTS : The effects of the heating control system's preheat temperature and the hot meshes buried at depths of 50 mm and 100 mm on the melting of snow for snowfalls of different intensities have been verified. From the study of the time taken for the specimen's surface temperature to increase from the preheat temperature ($0^{\circ}C$) to the reference temperature ($5{\sim}8^{\circ}C$) for different snowfall intensities, the correlation between the burial depth and outdoor air temperature has been determined to be as follows: Time=15.10+1.141Depth-6.465Temp CONCLUSIONS : The following measures are suggested. For the effective use of the electric heating mesh, it should be located under a slab it may be put to practical use by positioning it under a slab. From the management aspect, the heating control system should be adjusted according to weather conditions, that is, the snowfall intensity.

Analysis of the Effect of Pavement Crack Depth of the Cavity Management Grade (포장 균열 깊이가 공동 관리 등급에 미치는 영향 분석)

  • Park, Jeong Jun
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.449-457
    • /
    • 2020
  • Purpose: The Seoul Metropolitan Government classifies the cavity risks into emergency, priority, general, and observation grades in consideration of the cavity size, asphalt pavement thickness, and pavement depth based on the cavity management grade criteria of Seoul. In this study, the depth of cracking was measured at 17 cracks identified by checking the pavement condition of the cavity at 265 cavities found in the 2019 cavity investigation service. Method: In the first phase, crack width and depth were measured using a vernier caliper, taper gauge, and depth gauge to check the cracks of the identified cavities. In the second phase, the location of the largest crack in the upper road surface was confirmed, and A.C. was drilled to further measure the crack depth. Results: As a result, the cavity management level was raised in nine of the 17 test cavity identified. Therefore, in case of emergency and priority recovery, the grade should be adjusted according to the depth of pavement crack and the thickness of residual A.C. pavement. Conclusion: In the case of cracks in the upper part of the cavity, the crack progression must be determined through the perforation and the remaining asphalt concrete thickness must be determined to determine the cavity grade.