Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.39
no.3
/
pp.187-201
/
2021
Recently, the demand for a 3D urban spatial information infrastructure for storing, operating, and analyzing a large number of digital data produced in cities is increasing. CityGML is a 3D spatial information data standard of OGC (Open Geospatial Consortium), which has strengths in the exchange and attribute expression of city data. Cases of constructing 3D urban spatial data in CityGML format has emerged on several cities such as Singapore and New York. However, the current ecosystem for the creation and editing of CityGML data is limited in constructing CityGML data on a large scale because of lack of completeness compared to commercial programs used to construct 3D data such as sketchup or 3d max. Therefore, in this study, a method of constructing CityGML data is proposed using commercial 3D mesh data and 2D polygons that are rapidly and automatically produced through aerial LiDAR (Light Detection and Ranging) or RGB (Red Green Blue) cameras. During the data construction process, the original 3D mesh data was geometrically transformed so that each object could be expressed in various CityGML LoD (Levels of Detail), and attribute information extracted from the 2D spatial information data was used as a supplement to increase the utilization as spatial information. The 3D city features produced in this study are CityGML building, bridge, cityFurniture, road, and tunnel. Data conversion for each feature and property construction method were presented, and visualization and validation were conducted.
The Journal of the Convergence on Culture Technology
/
v.8
no.1
/
pp.507-512
/
2022
The subjects of the study are the sedimentary rock slope of the Mesozoic Gyeongsang Supergroup, which has a high risk of failure. The rocks of the slope shall be sandstone, siltstone and dacite, and discontinuities shall develop beddings, shear joints, extension joints, and dacite dyke boundary planes. The type and scale of failure varies depending on the type of rock and the strike/dip of the discontinuities, but the planar failure prevails. Based on the face-mapping data, SMR, physical and mechanical testing of rocks, the critical equilibrium analysis, all representative sections required a countermeasure method because the acceptable safety factor during dry and rainy seasons were far below Fs=1.5 and Fs=1.2. After applying the countermeasure method, both the dry and wet conditions of the slope exceeded the allowable safety factor. In particular, the face-mapping data of the slope-face, the geological cross-sections of several representative sections perpendicular to the slope-face, and the critical equilibrium analysis and the presentation of countermeasure methods that have been reviewed based on them are expected to be reasonable tools for the slope stability.
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.3A
/
pp.329-336
/
2010
An experimental study to evaluate bursting behavior in anchorage zone of the standard PSC I girders (span length : 30 m) has been carried out. The arrangement of bursting reinforcement in anchorage zone of the standard PSC I girders is considered to be designed without accurately reflecting the stress flows in the end zone of the PSC I girders caused by presstressing forces of the tendons. Also, due to excessive arrangement of the bursting bars, the workability of the girder is decreased greatly. In this study, three specimens with the same dimensions as the end zone of the standard PSC I girder are prepared and the experiment is carried out by applying PS forces. The bursting reinforcement of each specimen consists of 100 mm, 200 mm, and 300mm spacings, respectively. The experimental results show that the range of the PS forces to cause crack in the anchorage zone of the specimen are more than 1.6 times of the design PS forces. The bursting cracks occur in the vertical direction on the inside of all specimens. After applying 2.7 times of the design PS force, some of the transverse bursting reinforcements only in the specimen reinforced by 300 mm spacing yielded. The experimental results show that the anchorage zone of the standard PSC I girders arranged by 300 mm spacing of the bursting reinforcements which is the maximum spacing allowed in the road bridge design specifications, can be considered safe enough.
Sangki Park;Jaehwan Kim;Dong-Woo Seo;Ki-Tae Park;Hyun-Ock Jang
Journal of Korean Society of Disaster and Security
/
v.16
no.3
/
pp.17-26
/
2023
Prestressed Concrete (PSC) girders are divided into pre- and post-tension types as prestressing method, and I- and U-type as cross-sectional shape. There are both advantages and disadvantages depending on each prestressing method and cross-sectional shape, and each method is applied to bridge construction sites. In this study, a new girder design was attempted to develop that overcomes its shortcomings by using the pretension method and U-type cross sectional shape. Its structural performance was verified in this study. Pretension type girders are mainly manufactured in factories because they require a reaction arm and related facilities, and have the disadvantage of being limited in weight and span length for road transportation. In addition, in the case of the U-type cross-section, structural stability is very reliable during construction against overturning, but its own weight is relatively large comparing to I-type, and the post-tension method is mainly applied after on-site production. In this study, a PSC girder manufacturing method using the field pretension was proposed and a span length of 40 m real-scale test specimen was manufactured and verified its structural performance.
Journal of the Korean Institute of Landscape Architecture
/
v.36
no.3
/
pp.75-84
/
2008
The purpose of this research is to find the visual characteristics and geographic structure in a landscape of mountains in Yangsan City. In order to carry out this study, 40 view points of 6 mountains in Yangsan City were selected to experience the mountainscape. The results are as follows. The mountainscape of Yangsan City was confirmed from the view point to the object of view as ranging in middle distance reverse, the angle of elevation 11${\sim}13^{\circ}$ which give the impression of confronted to the mountain, and the horizontal angle 50${\sim}90^{\circ}$ which gives the impression of vastness. This shows that mountainscapes are perceived impressively when seeing the mountain with the meaning to feel the texture of the mountain as a confrontational relationship rather than a pictorial relationship. The geographic structure of the view point which occurs in scenes of impressive experience is classified into eight types and its characteristics are investigated. The first type is corridor, and it emerges in a long narrow linear structure made from the surrounding environment with buildings or street trees. The second is tunnel in which a vision and light hidden while passing underneath a bridge, high-level road, or inside a tunnel can be seen. Third, the maze is formed by the mountain shape. The hill spur emerges when the direction of traffic changes after turning the coner of a building or mountain edge. The hill ground emerges at the top of a hill slope. Next, parallel emerges when the observer and the mountain are in the same direction of process. Confrontation occurs when confronting an isolated mountain. Finally, the view point emerges when passing through major points such as a bridge or square and the boundary of a village or city. This research arranged visual conditions that create impressive mountainscapes. Geographic characteristics in terms of Types that make possible to experience mountainscapes were described. The results of this research will be basic data collected for the management and preservation of mountainscapes and for landscape effect evaluation. Furthermore, this research suggests theoretical evidence to preserve and manage geographic structures that create view experiences as well as to preserve the landscape in terms of view points.
This study aims to set up the basic data to manage the waterfowl habitat through the analysis of the changes of physical structure according to the time series of Hangang(Riv.) as water birds' habitat. Study area was 41.5km in length from Paldang bridge to Hangju bridge. during total length of 497.52km and horizontal boundary was based on the protected lowland in year 1975. As the analysis result of land use from the center of water to adjacent road to the river, ratio of year 1975 was in order of sedimentary land(22.7%), surface water(20.7%), built-up area(16.9%), field(16.2%), paddy field(15.9%), and afterwards most of the areas were changed through the construction of arterial highway and submerged weir in order to use Hangang(Riv.). In year 1985, the area ratio of protected lowland(57.8%) and surface water(32.8%) dramatically increased. After construction of river bank the recreational areas continually increased and relatively natural areas decreased. In year 2005, the area ratio of protected lowland was enlarged to 57.6% and surface water also to 33.3%. While the length of both riversides and naturalness decreased by 10.9%, 91.5% respectively in year 2005 compared to year 1975, the depth of water increased by 1.46m. Comprehensively, the flow of changes by physical structure in Hangang(Riv.) for 30 years was divided into two periods. The main characteristics in the first period were decrease of riverside area and enlargement of the surface water through the massive construction before middle of year 1980, and afterwards revetments were intensively artificialized with changes of land use for amusement area. In terms of water fowl habitat, Hangang(Riv.) which previously had various types of habitat condition was changed into simplified habitat for few of species, and the active improvement apporach was needed for habitat diversity.
KSCE Journal of Civil and Environmental Engineering Research
/
v.12
no.3
/
pp.65-79
/
1992
This study is concerned with the optimal design of two hinged steel arches with I cross sectional type and aimed at the exact analysis of the arches and the safe and economic design of structure. The analyzing method of arches which introduces the finite difference method considering the displacements of structure in analyzing process is used to eliminate the error of analysis and to determine the sectional force of structure. The optimizing problems of arches formulate with the objective functions and the constraints which take the sectional dimensions(B, D, $t_f$, $t_w$) as the design variables. The object functions are formulated as the total weight of arch and the constraints are derived by using the criteria with respect to the working stress, the minimum dimension of flange and web based on the part of steel bridge in the Korea standard code of road bridge and including the economic depth constraint of the I sectional type, the upper limit dimension of the depth of web and the lower limit dimension of the breadth of flange. The SUMT method using the modified Newton Raphson direction method is introduced to solve the formulated nonlinear programming problems which developed in this study and tested out throught the numerical examples. The developed optimal design programming of arch is tested out and examined throught the numerical examples for the various arches. And their results are compared and analyzed to examine the possibility of optimization, the applicablity, the convergency of this algorithm and with the results of numerical examples using the reference(30). The correlative equations between the optimal sectional areas and inertia moments are introduced from the various numerical optimal design results in this study.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.5
/
pp.137-145
/
2008
In this study, to reduce the flood damage caused by flood discharge exceeding project flood, the primary technology was applied to determining the optimal location and size for underground sluiceway. The Jungrang Stream was selected for this study because the stream was overflowed and the embankment section of the stream was destroyed owing to localized torrential rainfall in 1998 and 2001. Considering 200-year frequency storm, the inlets of the underground discharge channel were located at Seoul City limits, the confluence of Danghyun Stream, Wolgye 1-gyo, and the confluence of Mukdong Stream. The outlets were located at the estuary of Jungrang Stream and rightbank of Banpo Bridge in Han River. The transverse discharge according to the variation of overflow depth at the inlet of underground discharge channel was estimated and the effect of inundation reduction was analyzed. To examine the appropriate scale of the underground discharge channel, the 8 operation methods for the management of outlet discharge were compared considering four rules (only storage, the constant discharge rate, the constant discharge volume, and the mixture of the constant discharge rate and discharge volume). As a result, the effect of inundation reduction was most significantly improved when the inlet was located at the confluence of Danghyun Stream. The appropriate size of underground sluiceway for 200-year frequency storm was studied, and as a result, the appropriate diameters of the underground discharge channel were 12 m in case of only storage(Rule D), 9m in 50% of discharge(Rule E), 8 m in constant discharge volume(Rule F), and 7 m in mixture method(Rule G). This investigation process can be applied to design the underground discharge channel when the inundation damage is significant in coastal area due to embankment overflow. The underground discharge channel in Jungrang Stream can also be used as an underground road to link Seoul City to Uijeongbu City during dry season.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.