• Title/Summary/Keyword: River maintenance plan

Search Result 35, Processing Time 0.029 seconds

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF

RAUT: An end-to-end tool for automated parsing and uploading river cross-sectional survey in AutoCAD format to river information system for supporting HEC-RAS operation (하천정비기본계획 CAD 형식 단면 측량자료 자동 추출 및 하천공간 데이터베이스 업로딩과 HEC-RAS 지원을 위한 RAUT 툴 개발)

  • Kim, Kyungdong;Kim, Dongsu;You, Hojun
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1339-1348
    • /
    • 2021
  • In accordance with the River Law, the basic river maintenance plan is established every 5-10 years with a considerable national budget for domestic rivers, and various river surveys such as the river section required for HEC-RAS simulation for flood level calculation are being conducted. However, river survey data are provided only in the form of a pdf report to the River Management Geographic Information System (RIMGIS), and the original data are distributedly owned by designers who performed the river maintenance plan in CAD format. It is a situation that the usability for other purposes is considerably lowered. In addition, when using surveyed CAD-type cross-sectional data for HEC-RAS, tools such as 'Dream' are used, but the reality is that time and cost are almost as close as manual work. In this study, RAUT (River Information Auto Upload Tool), a tool that can solve these problems, was developed. First, the RAUT tool attempted to automate the complicated steps of manually inputting CAD survey data and simulating the input data of the HEC-RAS one-dimensional model used in establishing the basic river plan in practice. Second, it is possible to directly read CAD survey data, which is river spatial information, and automatically upload it to the river spatial information DB based on the standard data model (ArcRiver), enabling the management of river survey data in the river maintenance plan at the national level. In other words, if RIMGIS uses a tool such as RAUT, it will be able to systematically manage national river survey data such as river section. The developed RAUT reads the river spatial information CAD data of the river maintenance master plan targeting the Jeju-do agar basin, builds it into a mySQL-based spatial DB, and automatically generates topographic data for HEC-RAS one-dimensional simulation from the built DB. A pilot process was implemented.

Study on Damage Information Management Plan for Maintenance and Operation of River Facilities (하천시설 유지운영을 위한 손상정보 관리방안 연구)

  • Joo, Jae-Ha;Nam, Jeung-Yong;Kim, Tae-Hyung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.34 no.1
    • /
    • pp.9-18
    • /
    • 2021
  • Recently, the rapid proliferation, introduction, and application of the fourth industrial revolution technology has emerged as a trend in the construction market. Building Information Model (BIM) technology is a multidimensional information system that forms the basis of the fourth industrial revolution technology. The river sector utilizing this information-based system is also being actively reviewed, for example, the current measures for maintenance. In recent years, active research and current work should be done to reflect the need for river experts to introduce BIM into the river field. In addition, the development of tools and support software for establishing various information systems is essential for the activation of facility maintenance information systems reflecting advanced technology and to establish and operate management plans. A study on the maintenance of river facilities involves using existing drawings to build a three-dimensional (3D) information model, check the damage utilizing it, and inform it, and utilize it as the data for maintenance reinforcement. This study involved determining a method to build a river facility without the existing information system and using the property maintenance information with 3D modeling to provide a more effective and highly utilized management plan to check maintenance operations and manage damages.

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

Building technical and institutional capacities towards new river maintenance (새로운 하천 유지관리를 위한 기술적·제도적 역량 강화 방안)

  • Lee, Sangeun;Park, Jin-Won;Rhee, Dong Sop;Lee, Du Han;Kim, Dong Hyun;Lee, Seung Oh
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.11
    • /
    • pp.849-862
    • /
    • 2021
  • Laws, administrative rules, and task manuals have been revised to build a modern river maintenance system in Korea for the last decade. And various researches and technology developments have been carried out to resolve related issues. However, the recent enactment of the new Act and the catastrophe of flood damage in 2020 have accelerated more emphasis on the reorganization and reinforcement of the river maintenance system in terms of political and social aspects. In this study, we suggested promising directions for strengthening the technical and institutional competencies of river maintenance with respect to policy, R&D, planning, and technology. The open discussion was held with the participation of industry, academia, research institutes, and government officials, and all participants conducted the related survey to collect their opinions effectively. These results are expected to be used as a reference to secure the justification for integration of government organizations, planning of R&D, the introduction of new river maintenance, and related technology development when reestablishing and reinforcing the river management system in the future.

Stream Environment Monitoring using UAV Images (RGB, Thermal Infrared) (UAV 영상(RGB, 적외 열 영상)을 활용한 하천환경 모니터링)

  • Kang, Joon-Oh;Kim, Dal-Joo;Han, Woong-Ji;Lee, Yong-Chang
    • Journal of Urban Science
    • /
    • v.6 no.2
    • /
    • pp.17-27
    • /
    • 2017
  • Recently, civil complaints have increased due to water pollution and bad smell in rivers. Therefore, attention is focused on improving the river environment. The purpose of this study is to acquire RGB and thermal infrared images using UAV for sewage outlet and to monitor the status of stream pollution and the applicability UAV based images for river embankment maintenance plan was examined. The accuracy of the 3D model was examination by SfM(Structure from Motion) based images analysis on river embankment maintenance area. Especially, The wastewater discharged from the factory near the river was detected as an thermal infrared images and the flow of wastewater was monitored. As a result of the study, we could monitor the cause and flows of wastewater pollution by detecting temperature change caused by wastewater inflow using UAV images. In addition, UAV based a high precision 3D model (DTM, Digital Topographic Map, Orthophoto Mosaic) was produced to obtain precise DSM(Digital Surface Model) and vegetation cover information for river embankment maintenance.

  • PDF

A Study of Information Update and Framework for Intergrated Maintenance and Operation of River Facilities (하천시설 통합 유지운영을 위한 정보 현행화 및 프레임워크 구축방향 연구)

  • Nam, Jeong-Yong;Kim, Min-Jeong;Jo, Chan-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.140-149
    • /
    • 2017
  • Recently, it has become necessary to consider climate change when managing multi-purpose river functions. However, in terms of domestic rivers, the management of national and local rivers is separated and the river information cannot be integratedly handled. Especially, it is not sufficient to collect and update information by recycling reports for design and construction. In addition, the basic information of the rivers is dependent on the GIS-based RIMGIS system, but the reliability of the information is deteriorating due to the construction of spatial information using the river basement planning results. The purpose of this study is to investigate the current status of the information system with regard to the maintenance and operation of the river facilities. Through the verification of actual cases, the optimal solution was suggested from the point of view of practical information. As a result, we constructed an information system for the reliable maintenance of river facilities and examined the integrated information management plan. The results of this study can be used to improve the existing information and technical and institutional procedures for the integrated maintenance and operation of river facilities. It will be helpful to introduce the BIM as well as solve to the information gap with other fields through the establishment of an information framework to improve the information construction of river areas.

Estimation of Probable Precipitation considering Altitude in the Jeju Islands (제주도의 고도를 고려한 확률강우량 산정)

  • Ko, Jae-Wook;Yang, Sung-Kee;Jung, Woo-Yul;Yang, Se-Chang
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.595-603
    • /
    • 2014
  • Jeju Island, a volcanic island, is the region that shows the biggest rainfall and has a big elevation-specific deviation of precipitation, but Jeju Island River Maintenance Plan doesn't reflect the characteristics of Jeju Island as it only calculates probable precipitation from four weather stations with elevation less than 100m. Therefore, this study uses AWS observational data in four Jeju Island weather stations and other regions to calculate location-specific probable precipitation, review the elevation-probable precipitation correlation in southern and northern regions, and create a probable precipitation map for all regions of Jeju Island, in order to produce better outcomes. This study is expected to be the most basic data to establish a safe Jeju island from flood disaster in preparation for the future climate changes and widely used for Jejudo Basin Dimension Planning, River Maintenance Plan, Pre-Disaster Impact Review, etc.

Analysis on Hydrologic Stability of Agricultural Reservoir Using Probable Maximum Flood (최대가능홍수량 적용에 따른 농업용 저수지의 수문학적 안정성 분석)

  • Kim, Sang-Woo;Maeng, Seung-Jin
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.28-34
    • /
    • 2010
  • This study re-exams hydrologic stability on spillway outlet capacity of agricultural reservoirs using hydrologic data with current rainfall condition instead of project hydrologic data applied at design on Backgok reservoir located in Chungbuk province. It is concluded that Backgok reservoir is not hydrologically stable and therefore structural measures including the extension of spillway and non structural measures should be taken. Continuous basic plan for river maintenance including additional bank reinforcement to bottom river shall be carried out. Due to high peak flood with more than 290% compared to 200 year frequency probability flood which was design standard of the past in view of the results of calculating PMF according to revised design standard for reservoirs, there could a problem for securing rationality in case of applying PMF with design flood. Therefore, hydrological stability, construction, and maintenance cost shall be synthetically studied and reasonal application shall be made if the decision is made on applying PMF with design flood.

  • PDF

Levee Maintenance Using Point Cloud Data Obtained from a Mobile Mapping System (모바일 매핑시스템을 이용한 제방 유지보수에 관한 연구)

  • Lee, Jisang;Hong, Seunghwan;Park, Il suk;Mohammad, Gholami Farkoushi;Kim, Chulhwan;Sohn, Hong-Gyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.469-475
    • /
    • 2021
  • In order to effectively maintain and manage river facilities, on going data collection of associated objects is important. However, the existing data acquisition methods of using a total station, a global navigation satellite system, or a terrestrial laser scanner have limitations in terms of cost/time/manpower when acquiring spatial information data on river facilities distributed over a wide and long area, unlike general facilities. In contrast, a mobile mapping system (MMS), which acquires data while moving its platform, acquires precise spatial information data for a large area in a short time, so it is suitable for use in the maintenance of linear facilities around rivers. As a result of applying a MMS to a research area of 4 km, 184,646,099 points were acquired during a 20-minute data acquisition period, and 378 cross-sections were extracted. By comparing this with computer-drawn river plans, it was confirmed that efficient levee management using a MMS is possible.