Ontology for estimating excavation duration for smart construction of hard rock tunnel projects under resource constraint

  • Yang, Shuhan;Ren, Zhihao;Kim, Jung In
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.222-229
    • /
    • 2022
  • Although stochastic programming and feedback control approaches could efficiently mitigate the overdue risks caused by inherent uncertainties in ground conditions, the lack of formal representations of planners' rationales for resource allocation still prevents planners from applying these approaches due to the inability to consider comprehensive resource allocation policies for hard rock tunnel projects. To overcome the limitations, the authors developed an ontology that represents the project duration estimation rationales, considering the impacts of ground conditions, excavation methods, project states, resources (i.e., given equipment fleet), and resource allocation policies (RAPs). This ontology consists of 5 main classes with 22 subclasses. It enables planners to explicitly and comprehensively represent the necessary information to rapidly and consistently estimate the excavation durations during construction. 10 rule sets (i.e., policies) are considered and categorized into two types: non-progress-related and progress-related policies. In order to provide simplified information about the remaining durations of phases for progress-related policies, the ontology also represents encoding principles. The estimation of excavation schedules is carried out based on a hypothetical example considering two types of policies. The estimation results reveal the feasibility, potential for flexibility, and comprehensiveness of the developed ontology. Further research to improve the duration estimation methodology is warranted.

  • PDF

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

High resolution size characterization of particulate contaminants for radioactive metal waste treatment

  • Lee, Min-Ho;Yang, Wonseok;Chae, Nakkyu;Choi, Sungyeol
    • Nuclear Engineering and Technology
    • /
    • 제53권7호
    • /
    • pp.2277-2288
    • /
    • 2021
  • To regulate the safety protocols in nuclear facilities, radioactive aerosols have been extensively researched to understand their health impacts. However, most measured particle-size distributions remain at low resolutions, with the particle sizes ranging from nanometer to micrometer. This study combines the high-resolution detection of 500 size classes, ranging from 6 nm to 10 ㎛, for aerodynamic diameter distributions, with a regional lung deposition calculation. We applied the new approach to characterize particle-size distributions of aerosols generated during the plasma arc cutting of simulated non-radioactive steel alloy wastes. The high-resolution measured data were used to calculate the deposition ratios of the aerosols in different lung regions. The deposition ratios in the alveolar sacs contained the dominant particle sizes ranging from 0.01 to 0.1 ㎛. We determined the distribution of various metals using different vapor pressures of the alloying components and analyzed the uncertainties of lung deposition calculations using the low-resolution aerodynamic diameter data simultaneously. In high-resolution data, the changes in aerosols that can penetrate the blood system were better captured, correcting their potential risks by a maximum of 42%. The combined calculations can aid the enhancement of high-resolution measuring equipment to effectively manage radiation safety in nuclear facilities.

The Influence of Risk Perception on Destination Attachment and Voluntourism Behavior: Empirical Evidence from Indonesia

  • PANGARIBUAN, Christian Haposan;MANURUNG, Adler Haymans;SAROSO, Hardijanto;RUSMANTO, Toto
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권3호
    • /
    • pp.1287-1293
    • /
    • 2021
  • Alternative forms of travel have recently been delivering rewarding experiences and promising sustainable development for the tourism sector. However, it also depends on the uncertainties, consequences, and emotional connection with the destination. So far, the scholars have done limited empirical studies on volunteer tourism in Bali. Thus, this study tries to measure volunteer tourists' behavior by understanding the relationship between destination attachment, risk perception, and voluntourism behavior. Therefore, a study on the inclusivity of tourists' attachment to a particular place and perceived risks in volunteer tourism is an essential need to sustain the tourism industry. Data was analyzed using Partial Least Squares with smartPLS software. This study is based on a sample of ninety-three tourists of generation Z in Bali, Indonesia. Both outer model and inner model evaluation were conducted to ensure the robustness of the proposed model. The findings showed that destination attachment does have a direct and significant effect on voluntourism behavior. As expected, we also find that perceived risk has a significant moderating role on the relationship. Hence, greater efforts are needed to improve the image of the place by highlighting the characteristics of the locations. At the same time, it is necessary to put considerable effort to alleviate unfavorable conditions by creating safe environment surrounding the destination.

Establishing Rationale for the Clinical Development of Cell Therapy Products: Consensus between Risk and Benefit

  • Seunghoon Han;Hyeon Woo Yim;Hyunsuk Jeong;Suein Choi;Sungpil Han
    • International Journal of Stem Cells
    • /
    • 제16권1호
    • /
    • pp.16-26
    • /
    • 2023
  • Despite long-term research achievements, the development of cell therapy (CT) products remains challenging. This is because the risks experienced by the subject and therapeutic effects in the clinical trial stage are unclear due to the various uncertainties of CT when administered to humans. Nevertheless, as autologous cell products for systemic administration have recently been approved for marketing, CT product development is accelerating, particularly in the field of unmet medical needs. The human experience of CT remains insufficient compared with other classes of pharmaceuticals, while there are countless products for clinical development. Therefore, for many sponsors, understanding the rationale of human application of an investigational product based on the consensus and improving the ability to apply it appropriately for CT are necessary. Thus, defining the level of evidence for safety and efficacy fundamentally required for initiating the clinical development and preparing it using a reliable method for CT. Furthermore, the expertise should be strengthened in the design of the first-in-human trial, such as the starting dose and dose-escalation plan, based on a sufficiently acceptable rationale. Cultivating development professionals with these skills will increase the opportunity for more candidates to enter the clinical development phase.

공사계약일반조건의 위험요인 감소방안 (Risk Mitigation Methodology of the General Conditions of Contract)

  • 윤철성;권순오;김선규
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.177-185
    • /
    • 2005
  • 건설공사의 불확실성은 빈번히 클레임에 노출된다. 대부분의 경우 이러한 클레임에 대한 기본적인 해석은 공사계약서를 기준으로 하게 된다. 이러한 계약서 작성시의 문제는 발주자나 시공자가 부담하여야 하는 계약적 위험(risk)이 어떻게 규정되어 있어야 합리적인 수준인가를 판단하는 것인데 이러한 판단을 위해서는 FIDIC 계약조건과 같이 국제적으로 합리성을 인정받는 표준계약조건을 참고하는 것이 합리적이라 하겠다. 이에 본 연구는 FIDIC 계약조건을 기준으로 국내 공공공사에서 일반적으로 사용하는 공사계약일반조건에 내재되어 있는 불공정, 불합리 조항을 분석하여 세계적 수준에 맞는 공사계약조건을 제시하고자 위험관리의 관점에서 공사 계약조건을 분석하고, 여기서 도출되는 위험요인을 검증하며, 이에 대한 대응방안을 모색함으로써 공사계약일반조건의 위험요인 감소방안을 제시하고자 한다.

PROMETHEE 기법을 활용한 공정리스크 중요도 분석 (Analysis of Schedule Risk using PROMETHEE)

  • 이장영;윤유상;장명훈;서상욱
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.353-357
    • /
    • 2008
  • 건설 프로젝트는 불확실성 및 복잡성의 특성으로 인해 다양한 리스크 인자를 내포하고 있다. 이러한 리스크를 어떻게 관리하는가에 따라서 보다 성공적인 프로젝트로 이끌어나갈 수 있다. 이러한 리스크 관리는 확인, 분석, 대응의 절차를 통해 이루어지며 분석과정에서 위험요소들의 중요도 및 우선순위를 객관적이고 정확하게 분석해내는 것이 리스크관리의 성공여부를 좌우할 수 있다. 본 연구는 건설 프로젝트의 공정 리스크 중요도를 산출하는데 사용된 기존 AHP 분석 기법에서 리스크 인자의 추가 및 삭제 시 쌍대비교 등 복잡한 중요도 산출 절차를 거쳐야하는 문제점을 파악하고, AHP 분석 기법의 단점을 보완할 수 있는 공정리스크 중요도 산출 방법으로 PROMETHEE 분석 기법을 적용하였다. 또한 PROMETHEE 분석 기법의 수행을 위한 기본 설정을 통해 공정리스크 인자 분석이 가능한 프로세스을 제시한다.

  • PDF

리츠의 투자위험 분산화 효과에 대한 실증연구 (An Empirical Study on the Risk Diversification Effect of REITs)

  • 조규수;이상효;김재준
    • 한국건설관리학회논문집
    • /
    • 제14권1호
    • /
    • pp.23-31
    • /
    • 2013
  • 서브프라임 금융위기 이후 주택시장이 침체되면서 2000년대 초반과 같이 주택투자로 고수익을 올릴 수 있는 시기는 앞으로 찾아오지 않을 가능성이 이제 점차 높아지고 있다. 이에 따라 과거 고수익의 원천이 되었던 부동산 시장은 점차 수익형 부동산 등 안정적 수익을 획득할 수 있는 투자시장으로 변모하고 있다. 이에 따라 대표적인 간접투자상품인 리츠의 시장규모는 더욱 커질 것으로 판단된다. 그러나 아직까지 리츠시장은 일반적인 주택투자시장 및 금융시장보다 훨씬 더 그 성장이 미미한 실정이다. 하지만 포트폴리오 이론을 토대로 한 위험관리의 중요성이 투자의 매우 중요한 개념을 자리잡고 있는 바 리츠의 안정적인 수익 창출은 포트폴리오의 위험관리에 효과적일 것으로 판단된다. 이러한 관점에서 본 논문에서는 주식시장의 다양한 업종들 중 상대적으로 안정적인 수익을 확보할 수 있는 리츠가 포트폴리오에 편입되었을 때 위험 분산 효과를 실증분석하는 것을 목적으로 한다. 분석결과에서 확인할 수 있듯이 대표적인 경기방어주인 음식료업종과 마찬가지로 리츠업종 역시 전체 시장을 나타내는 코스피와 상관계수값이 상대적으로 낮은 것으로 나타났으며 최소분산포트폴리오로 구성했을 경우에도 표준편차가 매우 낮게 나오는 등 음식료업종과 같이 투자포트폴리오에 편입했을 경우 위험분산 효과를 기대할 수 있을 것으로 판단된다. 투자시장은 향후 미래의 불확실성에 따라 항상 위험을 감수해야 함에 따라 위험 대비 수익이 어느 정도인지가 매우 중요하다. 이러한 관점에서 리츠를 활용하여 포트폴리오를 구성할 경우 위험분산 효과를 획득할 수 있는 바 충분히 그 투자 효용성을 가지고 있을 것으로 판단된다.

공동주택 프로젝트의 초기 공사비 예측정확도 향상에 관한 연구 (Improving the Accuracy of Early Stage Cost Estimation in Apartment Construction Project)

  • 임소연;여상구;고성석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.143-147
    • /
    • 2010
  • Due to the diversification and complication of construction projects, controlling risks from the early design-planning phase gives huge impact on success of the construction project. As a part of managing uncertainties it is also important to estimate the project cost several times. Especially, estimating project cost in the early stage gives effects on making a budget for projects. This study estimated the apartment project cost using case-based reasoning(CBR), which is the process of solving new problems based on the past problems. For this, we deduced the apartment cost influence factors which can be gathered in the early stage of project. Based on the factors we established the database for apartment project and calculated the attribute value, attribute similarity and case similarity. Although we retrieve the most similar case from the database, it is very hard to utilize it directly due to the uniqueness of each project. So, Genetic Algorithm(GA) was applied in revising the cost of the retrieved-case. Therefore, the accuracy of the prediction was improved by GA optimization.

  • PDF

물류아웃소싱 서비스의 입찰단계 요인이 신뢰, 협력 및 서비스 만족도에 미치는 영향에 관한 연구 (A Study on the Effect of the Bidding Stage Factors of Logistics Outsourcing Service on Trust, Cooperation and Service Satisfaction)

  • 이남승;송상화
    • 한국항만경제학회지
    • /
    • 제36권2호
    • /
    • pp.19-36
    • /
    • 2020
  • 물류아웃소싱 서비스 입찰단계는 화주기업과 물류기업 모두에게 매우 중요하다. 왜냐하면 물류 입찰단계를 통하여 화주기업은 불확실성 해소를 위하여 자사의 물류운영 정보를 물류기업들에게 제공해야 하고, 물류기업은 자사가 가지고 있는 화주기업 물류에 대한 경험 및 노하우를 피력하고 화주기업의 위험과 물류운영으로 인한 이익을 공유하겠다는 제안을 함으로써 입찰에 나온 계약물량을 수주할 수 있기 때문이다. 따라서 물류아웃소싱 입찰단계에서 확인할 수 있는 요인들과 그 요인들이 물류아웃소싱 서비스 만족도에 어떠한 영향을 미치는지에 대하여 살펴볼 필요가 있다. 본 연구에서는 물류 아웃소싱 파트너십 요인에 관한 선행연구와 물류아웃소싱 결정요인에 관한 선행연구에서 확인한 요인들을 토대로하여 물류아웃소싱 서비스의 입찰단계에 대한 측정요인들을 도출하여 각각의 측정요인에 대한 설문을 작성한 후, 국내 화주기업을 대상으로 물류를 수행하고 있는 물류기업에서 종사하는 전문가들에게 설문을 진행하였으며 Smart- PLS 방법론을 활용하여 연구모형을 검증하였다. 본 연구의 시사점은 다음과 같다. 첫째, 물류입찰단계에서 화주기업은 불확실성의 해소를 위하여 물류기업들에게 자사의 물류운영정보를 제공해야 한다. 입찰 설명회 통하여 운영 특이사항에 대하여 상세히 설명해야 하며, 필요하다면 제조공장 및 물류센터 현장 Tour도 진행해야 한다. 둘째, 물류기업은 입찰단계에서 화주기업의 물류에 대한 경험 및 지식 등 자사의 경쟁력을 제안을 통해 어필해야 하며, 자사의 부족한 물류서비스 보완을 위하여 타 물류회사와의 연합도 고려해야 한다. 셋째, 물류기업은 입찰단계에서 물류 아웃소싱을 통한 이익 및 위험을 공유하겠다는 제안을 해야 한다. 화주기업의 환경 불확실성으로 인한 위험을 자사의 역량으로 포용 가능한 범위 내에서 수용하겠다는 제안을 해야 하며, 화주기업 물류를 수행함으로써 발생되는 이익을 공유하겠다는 자세를 보여야 한다.