• Title/Summary/Keyword: Risk ranking

Search Result 159, Processing Time 0.029 seconds

Evaluation of Inundation Risk Ranking for Urban Sewer Systems using PROMETHEE (PROMETHEE를 이용한 도시 하수관거시스템 침수위험순위 평가)

  • Song, Yang-Ho;Lee, Jung-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.388-398
    • /
    • 2012
  • In this study, Entropy method and PROMETHEE(Preference Ranking organization METHod for Enrichment Evaluations) which is one of the multi criteria decision making methods are applied to estimate the relative inundation risk ranking of the urban sewer systems. Then, the evaluation factors were selected considering two main items to estimate the inundation risk using Entropy and PROMETHEE. In the first item considering topographical and environmental factor, average elevation, average slope, width of area, population, density of conduit were selected as the detailed factors of first item which have influence of the overflow occurrence and damage scale in urban sewer system. And, the relative reliability of sewer network was considered as the second item which can quantify the inundation appearance. Then, the reliability is estimated considering the number of overflow nodes and overflow volume simultaneously. Therefore, the suggested inundation risk evaluation method can be used as the evaluation index for sewer networks and contribute to decision making for the sewer rehabilitation policy.

A study on the City-gas Pipeline Management System by Reliability Based Design and Assessment (신뢰도평가 기반 도시가스배관 종합관리시스템 구축 연구)

  • Oh, Dong-Seok;Lee, Jin-Han
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.6
    • /
    • pp.129-135
    • /
    • 2018
  • For efficiently safety management of city gas pipelines, the City-gas Pipeline Management System(CPMS) has been developed to systematically manage and analyze the data collected from 33 city gas companies and to effectively perform internal and external affairs related to gas safety management. The piping information data uploaded to the CPMS is ranked the risk according to the criteria specified in the KGS Code, and the safety management of the piping has performed close inspection according to the risk ranking. However, the criteria for deriving the risk ranking is very simple and lacks relevant grounds, and the reliability for the determination of the close inspection pipeline is no high due to the redundant rank. Therefore, we developed a risk assessment program based on the Reliability Based Design Assessment(RBDA) methodology and tried to derive a reasonable risk ranking by linking it with the CPMS system.

Comparative Study of Exposure Potential and Toxicity Factors used in Chemical Ranking and Scoring System (화학물질 우선순위선정 시스템에서 고려되는 노출.독성인자 비교연구)

  • An, Youn-Joo;Jeong, Seung-Woo;Kim, Min-Jin;Yang, Chang-Yong
    • Environmental Analysis Health and Toxicology
    • /
    • v.24 no.2
    • /
    • pp.95-105
    • /
    • 2009
  • Chemical Ranking and Scoring (CRS) system is a useful tool to screen priority chemicals of large body of substances. The relative ranking of chemicals based on CRS system has served as a decision-making support tools. Exposure potential and toxicity are significant parameters in CRS system, and there are differences in evaluating those parameters in each CRS system. In this study, the parameters of exposure potential, human toxicity, and ecotoxicity were extensively compared. In addition the scoring methods in each parameter were analyzed. The CRS systems considered in this study include the CHEMS-1 (Chemical Hazard Evaluation for Management Strategies), SCRAM (Scoring and Ranking Assessment Model), EURAM (European Union Risk Ranking Method), ARET (Accelerated Reduction/Elimination of Toxics), and CRS-Korea. An comparative analysis of the several CRS systems is presented based on their assessment parameters and scoring methods.

A Determining Contingency Ranking Using the Weather Effects of the Power System (날씨효과를 고려한 전력계통의 상정사고 순위 결정)

  • Kim, Kyoung-Young;Park, Jong-Jin;Kim, Jin-O;Kim, Tae-Gyun;Choo, Jin-Bu
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.134-136
    • /
    • 2003
  • The deregulated electricity market is operated with respect to theory of economical efficiency, and therefore, the system operator requires data with fast contingency ranking for security of the bulk power system. This paper compares the weather dependant probabilistic risk index(PRI) with the system performance index for power flow in the IEEE-RBTS. also, the system performance index for power flow presents the power system stability. The probabilistic risk index can be classified into normal weather and adverse weather. This paper proposes calculation method using the probabilistic risk index in determining contingency ranking requiring for security under the deregulated electricity market.

  • PDF

Analysis of the risk factors for offshore gillnet fisheries in the floating offshore wind farms based on AHP technique (AHP 기법을 이용한 부유식 해상 풍력 단지 내 근해자망어업 위험 요인 분석)

  • Jong-Kap AHN;You-Jin PARK;Yu-Jin JEONG;Young-Su AN
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.59 no.4
    • /
    • pp.354-361
    • /
    • 2023
  • In this study, the AHP (analytic hierarchy process) technique was used to analyze the risk of expected risk factors and fishing possibilities during gillnet fishing within the floating offshore wind farms (floating OWF). For this purpose, the risks that may occur during gillnet fishing within the floating offshore wind farms were defined as collisions, entanglements, and snags. In addition, the risk factors that cause these risks were classified into three upper risk factors and ten sub risk factors, and the three alternatives to gillnet fishing available within the floating OWF were classified and a hierarchy was established. Lastly, a survey was conducted targeting fisheries and marine experts and the response results were analyzed. As a result of the analysis, among the top risk factors, the risk was the greatest when laying fishing gear. The risk of the sub factors for each upper risk was found to be the highest at the berthing (mooring), the final hauling of fishing net, and the laying of the bottom layer net. Based on the alternatives, the average of the integrated risk rankings showed that allowing full navigation/fisheries had the highest risk. As a result of the final ranking analysis of the integrated risk, the overall ranking of allowing navigation/fisheries in areas where bottom layer nets were laid was ranked the first when moving vessels within the floating OWF was analyzed as the lowest integrated risk ranking of the 30th at the ban on navigation/fisheries. Through this, navigation was analyzed to be possible while it was analyzed that the possibility of gillnet fishing within the floating OWF was not high.

Risk-based approach to develop a national residue program: prioritizing the residue control of veterinary drugs in fishery products

  • Kang, Hui-Seung;Han, Songyi;Cho, Byung-Hoon;Lee, Hunjoo
    • Fisheries and Aquatic Sciences
    • /
    • v.22 no.12
    • /
    • pp.29.1-29.7
    • /
    • 2019
  • Veterinary drugs are widely used to protect production-related diseases and promote the growth of farmed fish. The use of large amounts of veterinary drugs may have potential risk and cause adverse effects on both humans and the environment. In this study, we developed risk-based ranking based on a scoring system to be applied in the national residue program. In this approach, the following three factors of veterinary drugs that may occur as residues in fishery products were considered: potency (acceptable daily intake), usage (number of dose and withdrawal period), and residue occurrence. The overall ranking score was calculated using the following equation: potency × usage (sum of the number of sales and withdrawal period) × residue occurrence. The veterinary drugs that were assigned high score by applying this approach were enrofloxacin, amoxicillin, oxolinic acid, erythromycin, and trimethoprim. The risk-based approach for monitoring veterinary drugs can provide a reliable inspection priority in fishery products. The developed ranking system can be applied in web-based systems and residuemonitoring programs and to ensure safe management of fishery products in Korea.

Development of Natural Hazard Risk Map using Insured Claim Payouts and Its Application (보험 손실액을 활용한 자연재해 위험 지도 개발 및 적용방안 연구)

  • Kim, Ji-Myong;Park, Young Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.257-258
    • /
    • 2015
  • The amount of damages caused by natural hazards is consistently growing due to the unusual weather and extreme events. At the same time, property damage by natural hazards is rapidly increasing as well. Hence, we need systematic anti-disaster activities and consulting that can react to such a situation. To address these needs, we investigated and analyzed insured claim payouts from natural hazards by administrative area, and calculate the risk index utilizing GIS. According to the index, this map is identifying the areas of greatest natural hazard risk. The ranking of natural disaster vulnerability based on the risk index, and risk grades were divided into five based on the ranking. This map integrates the natural hazard losses to assist in comprehensive and effective loss prevention activities using analysis of regional loss claims from natural hazards. Moreover, this map can be as utilized as loss mitigation and prevention activities to verify the distribution of exposure and hazards.

  • PDF

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Comparative Risk Analysis for Priority Ranking of Environmental Problems (환경 문제의 우선 순위 도출을 위한 비교 위해도 분석에 관한 연구)

  • 김예신;임영욱;남정모;장재연;이동수;신동천
    • Environmental Analysis Health and Toxicology
    • /
    • v.17 no.4
    • /
    • pp.285-298
    • /
    • 2002
  • In Korea, no CRA (comparative risk analysis) studies have been undertaken, nor have their methodologies of such studies been established. Therefore, the objectives of this study were to establish the framework of CRA consisting of health risk, economic risk and perceived risk, and to estimate and compare these risks among the three environmental problems of air pollution, indoor air pollution and drinking water contamination, which are themselves subject to the eight sub -problems of hazardous air pollutants (HAPs), regulated pollutants (representative as PM 10) and dioxins (PCDDs/PCDFs) in air pollution, indoor air pollutants (IAPs) and radon in indoor air pollution, and drinking water pollutants (DWPs), disinfection by -products (DBPs) and radionuclides in drinking water contamination in Seoul, Korea. After which, the priorities of these problems were set by individual and integrated risk. From the results, the rankings of both health risk and economical risk were in the following order: radon, PM10, IAPs, HAPs, DWPs, dioxins, DBPs, and radionuclides among the eight sub problems. On the contrary, the ranking of perceived risk was in the following order: HAPs, dioxins, radionuclides, PM10, DWPs, IAPs, Radon and then DBPs among the eight sub-problems.

Comparative risk analysis for priority ranking of environmental problems in Seoul

  • Kim, Ye-Shin;Lee, Yong-Jin;Park, Hoa-Sung;Lim, Young-Wook;Shin, Dong-Chun
    • Proceedings of the Korea Society of Environmental Toocicology Conference
    • /
    • 2003.10a
    • /
    • pp.169-169
    • /
    • 2003
  • In Korea, there is no CRA studies and has not well known CRA and not well established their methodologies. Therefore, objectives of this study is to establish the framework of CRA consisting of health risk, economic risk and perceived risk and the detail methodologies of three main component of estimating and comparing those risks for on the three environmental problems of air pollution, indoor air pollution and drinking water contamination which being subjective to the eight sub-problems of hazardous ai. pollutants (HAPs), regulated pollutants (representative as PM10) and Dioxins (PCDDS/ PCDFs) in air pollution, and indoor ai. pollutants (IAPs) and Radon in indoor air pollution, and drinking water pollutants (DWPs), disinfection-by- products(DBPs) and radionuclides in drinking water contamination in Seoul, Korea. And then, their problems set priorities by individual and integrated risk. As a results, ranking of health risk were the following order of indoor air pollution, air pollution and then drinking water contamination, in three environmental problems and of radon, PM10, IAPs, HAPs, DWPs, Dioxins, DBPs, and then radionuclides in eight sub-problems. And that of economic risk were the same order. In the contrary, ranking of perceived risk were the following order of air pollution, drinking water contamination, and then indoor air pollution, and of HAPs, Dioxins, radionuclides, PM10, DWPs, IAPs, Radon and then DBPs.

  • PDF