Kim, Byung Nam;Kwon, Hyuck Moo;Hong, Sung Hoon;Lee, Min Koo
Journal of Korean Society for Quality Management
/
v.46
no.2
/
pp.327-338
/
2018
Purpose: A risk evaluation procedure is proposed for common failure causes in FMEA(Failure Mode and Effects Analysis). The conventional FMEA does not provide a proper means to compare common failure causes with other failure causes. This research aims to develop a risk evaluation procedure in FMEA where common failure causes and other failure causes exist together. Methods: For each common failure cause, the effect of each combination of its resulting failures is recommended to be reevaluated considering their interactive worsening effect. And the probability that each combination of failures is incurred by the same common cause is also considered. Based on these two factors, the severity of each common cause is determined. Other procedures are similar to the conventional method. Results: The proposed procedure enables to compare and prioritize every failure cause. Thus, the common causes, each of which incurring two or more failures, and other causes, each of which is corresponding to one failure, can be fairly compared. Conclusion: A fair and proper way of comparing the common failure causes and other causes is provided. The procedure is somewhat complicated and requires more works to do. But it is worth to do.
Background: The relationship between risk factors and likelihood of occupational injury has been studied. However, what has been published has only provided a limited explanation of why some of the employees working in the same environment as other employees suffered a single-injury event, while other employees experienced multiple-injury events. This article reports on an investigation of whether artisanal and small-scale miners in Migori County of Kenya are susceptible to a single-injury or multiple-injury incidences, and if so, what underpinning parameters explain the differences between the single incident injured and the multiple incident injured group. Mine management commitment to safety in artisanal and small-scale mining (ASM) operations is also considered. Materials and methods: The research objectives were achieved by surveying 162 uninjured and 74 injured miners. A structured, closed-end questionnaire was administered to participants after the stratification of the study population and systematic selection of the representative samples. Results: The results showed that most injured miners suffer a single-injury incident rather than experiencing multiple-injury events, and laceration (28.40%) was the common injury suffered by the miners. The analysis showed that the risk factors for the single incident injured group were not similar to those in the multiple incident injured group. The research also found mine workers have low opinion about mine management/owners commitment to safety. Conclusion: The study concluded that mine management and miners need to be educated and sensitized on the dangers of this operation. Provision of safety gears and positive safety culture must be a top priority for management.
Korean Journal of Construction Engineering and Management
/
v.10
no.1
/
pp.91-101
/
2009
The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.
KIPS Transactions on Computer and Communication Systems
/
v.8
no.7
/
pp.177-180
/
2019
A typical vulnerability scoring system is Common Vulnerability Scoring System(CVSS). However, since CVSS does not differentiate among the individual vulnerability impact of the asset and give higher priority for the more important assets, it is impossible to respond effectively and quickly to high-risk vulnerabilities on large systems. We propose a Layered weight based Vulnerability impact assessment Scoring System which can hierarchically group the importance of assets and weight the number of layers and the number of assets to effectively manage the impact of vulnerabilities on a per asset basis.
Oh, Se An;Kim, Sung Kyu;Yea, Ji Woon;Kang, Min Kyu;Lee, Joon Ha;Lee, Rena
Progress in Medical Physics
/
v.26
no.2
/
pp.112-117
/
2015
In order to establish the quality control on patient safety following the guideline presented by American Association of Physicists in Medicine (AAPM) TG-100 committee, we aim to analyze the modes based on errors occurred during treatment of patients at the radiation oncology department at Yeungnam University Hospital and establish a quality control guideline for patient safety when patient-centered radiation treatment is conducted. We aim to analyze the errors that can occur during radiation treatment at the radiation department, and assess the frequency of error, the severity of error affecting patients, and probability of proceeding without noticing error, with scores. The places where errors can take place were divided into CT simulation treatment room, treatment planning room, and treatment room for the analysis. In CT simulation treatment room, an error from using the immobilization device showed the highest Risk Priority Number (RPN) value of 60, and an error from simulation treatment information input showed the lowest of 6. In treatment planning room, an error from selecting the radiation dose calculation model showed the highest RPN value of 168, and an error of patient treatment start date showed the lowest of 36. In treatment room, a Table Bar error showed the highest RPN value of 252, a weight change error showed 190, and a Pillow error showed the lowest of 24.
Lee, Soon Sung;Park, Dong Wook;Shin, Dong Oh;Kim, Dong Wook;Kim, Kum Bae;Oh, Yoon-Jin;Kim, Juhye;Kwon, Na Hye;Kim, Kyeong Min;Choi, Sang Hyoun
Journal of the Korean Society of Radiology
/
v.11
no.7
/
pp.627-635
/
2017
Brachytherapy is generally performed in conjunction with external radiation therapy, and the treatment course is very complicated, which can lead to radiation accidents. In order to solve this problem, we designed the process map by applying the failure mode and effects analysis (FMEA) method to the Brachytherapy and scored the risk priority number (RPN) for each treatment course based on this process map. The process map consisted of five steps, Patient consulting", "Brachytherapy simulation", "CT simulation", "Brachytherapy treatment planning" and "Treatment". In order to calculate the RPN, doctor, medical physicist, dose planners, therapist, and nurse participated in the study and evaluated occurrence, severity, and lack of detectability at each detail step. Overall, the process map is preceded by a patient identification procedure at each treatment stage, which can be mistaken for another patient, and a different treatment plan may be established to cause a radiation accident. As a result of evaluating the RPN for the detailed steps based on the process map, overall "Patient consulting" and "Brachytherapy treatment planning" step were evaluated as high risk. The nurses showed a tendency to be different from each other, and the nurses had a risk of 55 points or more for all the procedures except "Treatment", and the "Brachytherapy simulation" step was the highest with 88.8 points. Since the treatment stage differs somewhat for each medical institution performing radiotherapy, it is thought that the risk management should be performed intensively by preparing the process map for each institution and calculating the risk RPN.
Disodium disulphite, the HPV chemical, was assigned to Korea in order to implement OECD SIDS program in 1999. It was produced about 3,200 ton/year in 1998. This report evaluates the toxic potency of disodium disulphite based on the environmental and mammalian effects as well as human exposure. Oral $LD_{50}$ in rats is 1,540 mg/kg b.w. and effects was observed to the stomach, liver and the GI track that was filled with blood. For repeated dose toxicity, the predominant effect was the induction of stomach lesion due to local irritation. The no observed adverse effect lever for local (stomach irritation) was about 217 mg/kg bw/day. There is no evidence that disodium disulphite is genotoxic in vivo. No reproductive or developmental toxicty of disodium disulphite was observed for the period up to 2 yr and over three generation. In humans, urticaria and asthma with itching, edema, rhinitis, and nasal congestion were reported. Disodium disulphite is unlikely to induce respiratory sensitization but may enhance symptom of asthma in sensitive individuals. This chemical would be mainly transported to water compartment when released to environmental compartments since it is highly water soluble (470 g/l at 20). Low K oc (2.447) indicates disodium disulphite is so mobile in soil that it may not stay in the terrestrial compartment. The chemical has been tested in a limited number of aquatic species. hem acute toxicity test to fish, 96 hr-$LC_{50}$ was > 100 mg/1. For algae, 72 hr-$XC_{50}$ was 48.1 mg/1. For daphnid, the acute toxicity value of 48 hr-$EC_{50}$ was 88.76 mg/1, and chronic value of 21day-NOEC was > 10 mg/1. Therefore, PNEC of 0.1 mg/l for the aquatic organism was obtained from the chronic value of daphnid using the assessment factor of 100. Based on these data the disodium disulphite was recommended as low priority for further post-SIDS work in OECD.
Park, Hye-Youn;Park, Yoonho;Sanghwan Song;Kwon, Min-Jeoung;Koo, Hyun-Ju;Jeon, Seong-Hwan;Na, Jin-Gyun;Park, Kwangsik
Toxicological Research
/
v.18
no.1
/
pp.13-22
/
2002
In Korea, 2,320 tonnes of acetanilide were mostly wed as intermediates for synthesis in phar-maceuticals or additives in synthesizing hydrogen peroxide, varnishes, polymers and rubber. Only small amount of 120 kg were wed as a stabilizer for hydrogen peroxide solution for hair colouring agents in 1998. Readily available environmental or human exposure data do not exist in Korea at the present time. However, potential human exposures from drinking water, food, ambient water and in work places are expected to be negligible because this chemical is produced in the closed system in only one company in Korea and the processing factory is equipped with local ventilation and air filtering system. Acetanilide could be distributed mainly to water based on EQC model. This substance is readily biodegradable and its bioaccumulation is low. Acute toxicity of acetanilide is low since the L $D_{50}$ of oral exposure in rats is 1,959 mg/kg bw. The chemical is not irritating to skin, but slightly irritating to the eyes of rabbits. horn repeated dose toxicity, the adverse effects in rats were red pulp hyperplasia of spleen, bone marrow hyperplasia of femur and decreased hemoglobin, hematocrit and mean corpuscular hemoglobin concentration. The LOAEL for repeated dose toxicity in rats was 22 mg/kg/day for both sexes. Acetanilide is not considered to be genotoxic. In a reproductive/developmental toxicity study, no treatment-related changes in precoital time and rate of copulation, impregnation, pregnancy were shown in all treated groups. The NOAELs for reproduction and developmental toxicity (off-spring toxicity) are considered to be 200 mg/kg bw/day and 67 mg/kg bw/day, respectively. Ecotoxicity data has been generated in a limited number of aquatic species of algae (72 hr- $E_{b}$$C_{50}$; 13.5 mg/l), daphnid (48hr-E $C_{50}$ > 100 mg/l) and fish (Oryzias latipes, 96hr-L $C_{50}$; 100 mg/l). Form the acute toxicity values, the predicted no effect concentration (PNEC) of 0.135 mg/1 was derived win an assessment factor of 100. On the basis of these data, acetanilide was suggested as currently of low priority for further post-SIDS work in OECD.in OECD.D.
Recently, the public sector information projects have bebn larger in size, sophisticated, and diversified, which make the performance management model be studied continuously. According to the research and understanding on this, there are discontents resulted from poor requirements managements, schedule delays, budget overruns, failure to achieve expected goals, although there are increase the scale of projects and the number of information systems than ever before. it makes the requirement for the plan to manage significant risk factors systematically. So in this study, we will understand the risks which have been recognized by professionals and managers in public sector projects for enhancing the success rate. And the surveys will be conducted for the risk factors in each fields by gathering the opinions of the hands on workers in public sector project support team such as S company, L company. Finally, the correlation index between the risks and the other project fields would be clear by this survey.
According to South Korea's policy of supplying eco-friendly hydrogen vehicles, related industries are actively conducting research on the development of hydrogen cars and hydrogen charging station infrastructure. On the other hand, there is a lack of empirical research and assessment of the risk of non-metallic materials (such as liners, seals, gaskets) for classified materials that directly affect the durability and reliability of hydrogen vehicles and hydrogen charging stations. In this study, the risk factors for liners and seals of non-metallic parts used in high-pressure hydrogen installations were derived using FMEA, and the RPN values were calculated by converting the severity, frequency of occurrence and degree of detection into scores. The maximum value of the RPN 600, minimum value 63, average value 278.5 was calculated and periodic control of the liner and seal was identified as important. In addition, through hydrogen soakage and oxygen aging tests for non-metallic rubber products, physical test values that can be used as basic data were presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.