CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

Research on Importance-Performance Analysis of Smart Construction Safety Management System (스마트 건설안전관리시스템의 중요도-성과도 분석 연구)

  • Jong-Yil Park;Chang-Hee Yun
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.2
    • /
    • pp.43-53
    • /
    • 2024
  • This study analyzes the importance-performance analysis (IPA) of the 10 dimensions of the smart construction safety management system, and analyzes which dimensions are important and which dimensions are performing to determine key improvement tasks, incremental improvement tasks, Maintenance and reinforcement tasks and continuous maintenance tasks were derived. Among the 10 dimensions of the smart construction safety management system, the dimensions that are recognized as important by all field managers and field workers and have high performance are the automatic risk displacement measurement system, smart environmental sensor system, and heavy equipment seizure prevention system. However, areas that were perceived as having high importance but low performance were worker location tracking systems, smart safety helmet chin muscles, and smart safety ring fastening. Among the smart construction safety management systems perceived by field managers, areas for key improvement with high importance and low performance included worker location tracking system and smart safety ring fastening. Among the smart construction safety management systems perceived by field workers, the area for key improvement with high importance and low performance was the automatic risk displacement measurement system.

The Analysis of the Weights of Country Risk by Participants of Overseas Construction Projects (건설사업 참여주체 별 해외건설공사 국가리스크 핵심요인 도출 및 비교분석)

  • An, Byung-Ho;Kim, Jin-Eon;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.150-159
    • /
    • 2013
  • The government has focused on activation of overseas construction projects and strengthening competitiveness in the long term. In recent years Public construction contract as well as design, engineering, construction management(CM) are gradually expanding into other countries, but risk analysis cases in the field are slight. In this study, We utilized PI scale and drew a conclusion about the importance of overseas risk by participants. We compared its features from the risk factor based on Risk Matrix. As a result of this study total of 6 section 31 Country Risk factors for the importance of overseas risk by participants were drawn, and the key risk factors (17 constructor, 14 designers, 17 CMr) based on Risk Matrix were derived. By utilizing the result of this study will be used as the basic data for establishing risk management strategy to meet each business and planning evaluation model.

Perception of Breast Health amongst Malaysian Female Adolescents

  • Che, Chong Chin;Coomarasamy, Jeya Devi;Suppayah, Balakrishnan
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.17
    • /
    • pp.7175-7180
    • /
    • 2014
  • Background: Breast cancer is the most common cancer among women in Malaysia, about one in 19 women being at risk. This study aimed to investigate knowledge and practice of breast self-examination (BSE), as well as knowledge of risk factors for breast cancer amongst female adolescents in Malaysia. Subsequently, relationships between demographic characteristics and knowledge level of BSE, risk factors for breast cancer and BSE practice were assessed. Materials and Methods: A descriptive, cross sectional survey was conducted using a sample of 500 Malaysian adolescents from the age of 15 to 19 years. A self-administered questionnaire was used to gather socio-demographic characteristics, knowledge of BSE, knowledge of risk factors for breast cancer and BSE practices. Results: The findings of this study indicated that female adolescents in Malaysia demonstrated an inadequate knowledge level of BSE and risk factors for breast cancer. Only 27.8% of female adolescents performed BSE regularly. BSE practice, knowledge of BSE and knowledge of risk factors for breast cancer showed significant positive relationships. Conclusions: The study highlighted the importance of planning and implementing breast health education programs for female students in secondary schools in Malaysia. It will also provide the health care providers an avenue to stress on the importance of imparting breast health education to adolescents.

Seroprevalence and Risk Factors of Toxoplasma gondii Infection among Cat Sitters in Korea

  • Jung, Bong-Kwang;Song, Hyemi;Lee, Sang-Eun;Kim, Min-Jae;Cho, Jaeeun;Shin, Eun-Hee;Chai, Jong-Yil
    • Parasites, Hosts and Diseases
    • /
    • v.55 no.2
    • /
    • pp.203-206
    • /
    • 2017
  • The seroprevalence of human toxoplasmosis has been increasing in Korea, and it is controversial whether cats are an important infection source or not. This study was performed to evaluate the seroprevalence of Toxoplasma gondii infection in a high risk group (cat sitters) and to determine the possible importance of cats as an infection source in Korea. Risk factors, including the age, sex, and diet of cat sitters, their contact experience and contact frequency with stray cats, and origin, number, and outdoor activity of their pet cats, were analyzed using structured questionnaires. A total of 673 serum samples from people who have frequent contact with cats (high risk group) and 1,114 samples from general people (low risk group) were examined for specific IgG antibodies against T. gondii by ELISA. The results revealed that the overall seroprevalence of T. gondii infection was 7.4% (n=1,787). The seroprevalence among low risk group was 8.0% (89/1,114), whereas that among high risk group was rather lower 6.4% (43/673), though this difference was statistically not significant (P=0.211). Among the risk factors, only the outdoor activity of pet cats was important; people having cats with outdoor activities revealed 2 times higher seroprevalence than people having cats with only indoor activities (P=0.027). In conclusion, the seroprevalence of T. gondii was not significantly different between the high risk group and low risk group, and the importance of cats as a source of infection in Korea is questionable.

Assessing the Contributions of Non-bank Financial Institutions (NBFI) and ELS Issuance to Systemic Risk in Korea

  • JONG SOO HONG
    • KDI Journal of Economic Policy
    • /
    • v.46 no.1
    • /
    • pp.21-51
    • /
    • 2024
  • Since the Global Financial Crisis of 2008-2009, the importance of nonbank financial institutions in macroprudential management has increased significantly. Consequently, major countries and international financial institutions have been actively discussing and implementing macroprudential supervision and regulation for non-bank financial institutions (NBFI). In this context, this paper analyzes the systemic risk of both banks and non-bank sectors (securities firms and insurance companies) in South Korea over different time periods. Using the widely recognized ΔCoVaR methodology for measuring systemic risk, the analysis reveals that systemic risk increased substantially across all three sectors (banks, securities firms, and insurance companies) during the Global Financial Crisis, the European Sovereign Debt Crisis, and the COVID-19 pandemic. Although the banking sector exhibited relatively high systemic risk compared to the securities and insurance sectors, the relative differences in systemic risk varied across the different crisis periods. Notably, during the margin call crisis in March of 2020, the gap in systemic risk between the banking and securities sectors decreased significantly compared to that during both the Global Financial Crisis and the European Sovereign Debt Crisis, indicating that securities firms had a more substantial impact on risk in the overall financial system during this period. Furthermore, I analyze the impact of the issuance of equity-linked securities (ELS) by financial institutions on systemic risk, as measured by ΔCoVaR, finding that an increase in the outstanding balance of ELS issuance by financial institutions had an impact on increasing ΔCoVaR during the three crisis periods. These findings underscore the growing importance of non-bank financial institutions in relation to South Korea's macroprudential management and supervision. To address this evolving landscape, enhanced monitoring and regulatory measures focusing on non-bank systemic risk are essential components of maintaining financial stability in the country.

A Study on Fire Risk Analysis & Indexing of Buildings (건축물의 화재위험의 분석과 지수화에 관한 연구)

  • Chung, Eui-Soo;Yang, Kwang-Mo;Ha, Jeong-Ho;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.10 no.4
    • /
    • pp.93-104
    • /
    • 2008
  • A successful fire risk assessment is depends on identification of risk, the analytical process of potential risk, on estimation of likelihood and the width and depth of consequence. Take the influence on enterprise into consideration, Fire risk assessment could carry out along the evaluation of the risk importance, the risk level and the risk acceptance. A large part of the limitation of choosing the risk assessment techniques impose restrictions on expense and time. If it is unnecessary high level risk assessment or Probabilistic Risk Assessment of buildings, in compliance with the Relative Ranking Method, Fire risk indexing and assessing is possible. As working-level technique, AHP method is useful with practical technique.

Exploratory Study on Risk Factors by Project Performance Areas in Software Project Management (정보시스템 프로젝트의 성과영역별 위험요인에 관한 탐색적 연구)

  • Lee Seogjun;Kim HaeJung;Suh Hyunsuk
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.4
    • /
    • pp.103-120
    • /
    • 2004
  • Identifying validated risk factors in software risk management is imperative for project managers. Although validated risk lists were provided by previous researchers, risk list associated with software project performance areas was not provided as yet. This paper represents a first step toward understanding risk lists by various project performance areas (time, cost, and quality) to help project managers alleviating the possibility of software project failure. Four simultaneous exploratory surveys were conducted with 29 experienced software project managers. Three different risk factor ranking sets for each project performance area were compared with, the risk ranking, which was provided without clarifying specific project performance areas. The risk lists and their corresponding perceived importance were different from previous research results. This implies that identifying risk factors for specific project performance areas can provide additional information for project managers. We concluded by discussing implications of our finds for both research and improving risk management practice.

  • PDF

Variability of plant risk due to variable operator allowable time for aggressive cooldown initiation

  • Kim, Man Cheol;Han, Sang Hoon
    • Nuclear Engineering and Technology
    • /
    • v.51 no.5
    • /
    • pp.1307-1313
    • /
    • 2019
  • Recent analysis results with realistic assumptions provide the variability of operator allowable time for the initiation of aggressive cooldown under small break loss of coolant accident or steam generator tube rupture with total failure of high pressure safety injection. We investigated how plant risk may vary depending on the variability of operators' failure probability of timely initiation of aggressive cooldown. Using a probabilistic safety assessment model of a nuclear power plant, we showed that plant risks had a linear relation with the failure probability of aggressive cooldown and could be reduced by up to 10% as aggressive cooldown is more reliably performed. For individual accident management, we found that core damage potential could be gradually reduced by up to 40.49% and 63.84% after a small break loss of coolant accident or a steam generator tube rupture, respectively. Based on the importance of timely initiation of aggressive cooldown by main control room operators within the success criteria, implications for improvement of emergency operating procedures are discussed. We recommend conducting further detailed analyses of aggressive cooldown, commensurate with its importance in reducing risks in nuclear power plants.

Estimation of Key Risk Management Factors for Construction Projects Based on Kano Model (Kano 모델 기반 건설프로젝트 핵심 리스크관리 요인 도출)

  • Cho, Jin-ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.2
    • /
    • pp.239-248
    • /
    • 2022
  • Risks in construction projects are increasing remarkably due to recent changes in the construction environment. Active risk management is required to recognize risks as opportunities. The purpose of this study is to propose a risk management model of the importance determination method through comparative analysis using Kano model, Timko CSC (Customer Satisfaction Coefficient), and ASC (Average Satisfaction Coefficient). Based on previous studies, the validity of risk management factor determination is reviewed through a questionnaire modified Kano model through interviews with working-level workers using the Delphi technique. Through this, a suitable risk management model is presented by selecting key risk management factors recognized by domestic construction project practitioners. As a result of the study, the Kano model developed to verify risk management of construction projects was evaluated to be effective in verifying the risk management of practitioners. It is expected that the Kano model presented in this study will be actively used to verify the importance of risk management for construction projects.