• Title/Summary/Keyword: Risk Level Assessment

Search Result 1,149, Processing Time 0.026 seconds

A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry (건설업 위험성 평가 최적화를 위한 운영 주체간 안전보건 인식도 조사 연구)

  • Paek, Chung-Hyeun;Cho, Ur-Ryong
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.23-32
    • /
    • 2015
  • Recently, the Ministry of Labour, published clause 2 of Article 41 (Risk Assessment) of the Act "Industrial Safety and Health" dated 12 June 2013 in connection with continuous increase of accidents at construction sites in order to prevent accidents in industrial safety and health in new construction in accordance with the risk assessment on construction projects are realized after March 13, 2014. In this paper, positive method of calculating risk discussed by performing research the awareness of general contractors and sub-contractors with presenting risky situation is considered. The purpose will be a positive method of calculating risk and would be a sufficient base and give a positive direction in the development of new systems currently working in the construction and risk assessment which consider the characteristics of sufficient risk assessment system for future research.

The method of risk assessment by AMEA (AMEA을 활용한 위험성평가 방법)

  • Kim, Geon-Ho;Kwon, Sang-Myeon;Lee, Kang-Bok;Kim, Yoon-Sung;Lee, Jai-Won;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.2
    • /
    • pp.97-111
    • /
    • 2007
  • In risk assessment, there are several methods such as Safety Review, Checklist, FMEA(Failure Mode and Effect Analysis), FTA(Fault Tree Analysis), ETA (Event Tree Analysis) etc, however, the level of accident is indentified by the probability of accident and severity resulting from accident which used widely in assessing accidents and disasters. In this paper, the risk assessment method to decide the level of risk will be introduced by using severity, frequency and detection according to accident theory.

Development of Risk-Appearance Frequency Evaluation Model for Railway Level-Crossing Accidents (철도건널목 사고 위험도-발생빈도 평가모델 개발)

  • Kim, Min-Su;Wang, Jong-Bae;Park, Chan-Woo;Choi, Don-Bum
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.3
    • /
    • pp.96-101
    • /
    • 2009
  • In this study, a risk-appearance frequency evaluation model for railway level-crossing accidents is developed with the frequency estimation based on the accident history. It follows the worldwide common safety management approach and reflects the operation conditions and accident properties of the domestic railway system. The risk appearance frequency evaluation process contains a development of accident scenarios by defining the system configurations and functions, and a frequency estimation of hazardous events based on the accident history. The developed model is verified with the accident history during 5 years('03-'07) for 3 hazardous events: 'Being trapped in level crossing(Hl)', 'Crossing during warning signal(H2)' and 'Breaking through/detouring the barrier(H3)'. This risk appearance frequency evaluation model will be combined with a consequence evaluation model so as to offer full risk assessment for the railway accident. The accident risk assessment will contribute to improving the safety management of the railway system.

Lightning Risk Assessment for Structures Lower than 20m High (높이 20미터 미만인 구조물의 낙뢰리스크 평가)

  • Lee, Ju-Chul;Kim, Gi-Hyun;Lee, Young-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.12
    • /
    • pp.21-27
    • /
    • 2012
  • Korean Industrial Standards for lightning protection system complies with IEC standards. However, the standards are applicable only to buildings and structures more than 20 meters in high. Therefore, it is necessary to determine whether lightning protection system should be installed on structures lower than 20 meters high. This paper proposes an efficient method of assessing risk against lightning of structures lower than 20 meters high. The method suggests simplified lightning protection system and provides selecting an appropriate protection level. The suggested method assumes that structure under assessment has no lightning protection system and there is no person around the structure at the moment of lightning stroke. A simplified method of assessing the risk to human within the structure is developed by adopting the general assessment factor. The selection of a protection level is possible by comparing tolerable risk with physical damage risk caused by a direct lightning. Finally, this paper gives ways to establish surge protection measures when a structure with lightning risk is within a radius of 2km from the assessed structure even if this structure requires no lightning protection system.

Risk Assessment Method for Activities of Apartment Construction (공동주택 건축공사 단위작업의 위험성 평가 방법)

  • Park, Sungpyo;Choi, Jae-Wook;Lee, Chansik
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.135-145
    • /
    • 2020
  • Recently, the disaster rate of the construction industry has increased with high-rise, and complexity of the building, unlike the decrease in the disaster rate in other industries. Although risk assessment is performed to reduce the occurrence of disasters, it is difficult to estimate the risks accurately due to activity in which no disaster has occurred, and inconsistencies in the level of details of work. In this study, in order to evaluate the risk of the major activity for the apartment construction work, the activity was identified by referring to the risk assessment model of construction industry type by the KOSHA. The construction work types and activities were consistently organized in level of work into nine work types and 82 activities were through experts consultation. Analyzing the disaster types that occurred during work through KOSHA disaster cases, calculating the probability of disaster occurrence according to the type of disaster, and combining the probability of disaster with the severity of disaster to estimate the risk assessment method was presented. Using the daily report of the construction site of the apartment, the results of a case study confirmed the validity of the risk calculation method presented in this study.

A Study on the Research & Analysis of the Health and Safety Managing's Understanding on the Applied Construction Work Site Risk Assessment - Focus on Site Manager & Manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choi, Soo-Hwan;Kim, Chi-Kyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.62-67
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

A study on the Research & Analysis of the Health and safety Managing's Understanding on the Applied Construction work site Risk Assessment - Focus on Site manager & manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choe, Su-Hwan;Bae, Jun-Tae;Lee, Yeon-Su;Kim, Chi-Gyeong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.1-11
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

  • PDF

Estimating Benchmark Dose and Permissible Intake Level Using Subchronic Toxicity Data of Aristolochia Contorta

  • Lee, Hyomin;Eunkyung Yoon;Myungsil Hwang;Lee, Geunyung;Jisun Yang;Kihwa Yang;Kwangsup Kil
    • Proceedings of the Korean Society of Toxicology Conference
    • /
    • 2002.11b
    • /
    • pp.198-198
    • /
    • 2002
  • Occurrence of Chinese Herbs Nephropathy (CHN) has been reported in young women who had taken a slimming pills containing some chinese herbs. Aristolochic acid (AA) known as a carcinogen, was suspected as the major causal factor of CHN. AA is major component of fruit of A. contorta was used in Korean Traditional Medicine.(omitted)

  • PDF

Decision Making of Improvement Priority by Deterioration Risk Assessment of Water Supply Infrastructures (물공급시설의 노후 위험도 평가를 통한 개선 우선순위 결정)

  • Chae, Soo-Kwon;Lee, Dae-Jong;Kim, Ju-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.6
    • /
    • pp.367-376
    • /
    • 2009
  • This paper proposes an application methodology of AHP(Analytic Hierarchy Process) based decision making theory for improvement priority by assessment of various risk factors affecting on deterioration of water supply systems, as major social infrastructure. AHP method is organized with three level of hierarchy which is introduced for multi-criteria decision making in this study. In the first level, assessment outputs are calculated by AHP for each affecting factor. In the second level, criteria are estimated by using assessment results with respect to structural and environmental factors. Consequently, ranking decision is performed in the third level. In order to present the effectiveness, a proposed method is compared with FCP(Fuzzy Composite Programming) for decision making. Since the results of the proposed method show better performance with consistent results, it can be applied as an efficient information for the determination for improvement priority of the study infrastructure.

A review of the features, events, and processes and scenario development for Korean risk assessment of a deep geological repository for high-level radioactive waste

  • Kibeom Son;Karyoung Choi;Jaehyeon Yang;Haeram Jeong;Hyungdae Kim;Kunok Chang;Gyunyoung Heo
    • Nuclear Engineering and Technology
    • /
    • v.55 no.11
    • /
    • pp.4083-4095
    • /
    • 2023
  • Currently, various research institutes in Korea are conducting research to develop a safety case for deep geological repository for high-level radioactive waste (HLW). In the past, low and intermediate-level waste (LILW) was approved by a regulatory body by performing a post-closure safety assessment, but HLW has different disposal characteristics and safety objectives are different. Therefore, in the case of HLW, safety assessment should be performed based on these changed conditions, and specific procedures are also under development. In this paper, the regulatory status of prior research institutes, feature, event and process (FEP) and scenario development cases were investigated for well-organized FEP and scenario development methodologies. In addition, through the results of these surveys, the requirements and procedures necessary for the FEP and scenario development stage during the safety assessment of repository for HLW were presented. These review results are expected to be used to identify the overall status of previous studies in conducting post-closure risk assessment for HLW repository, starting with identifying regulatory requirements, the most basic element.