The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.
Lee, Yong Ho;Na, Chea Sun;Hong, Sun Hea;Sohn, Soo In;Kim, Chang Suk;Lee, In Yong;Oh, Young Ju
Korean Journal of Environmental Biology
/
v.36
no.4
/
pp.672-679
/
2018
This study was conducted to predict the potential distribution and risk of invasive alien plant, Amaranthus patulus, in an agricultural area of South Korea. We collected 254 presence localities of A. patulus using field survey and literature search and stimulated the potential distribution area of A. patulus using maximum entropy modeling (MaxEnt) with six climatic variables. Two different kinds of agricultural risk index, raster risk index and regional risk index, were estimated. The 'raster risk index' was calculated by multiplying the potential distribution by the field area in $1{\times}1km$ and 'regional risk index' was calculated by multiplying the potential distribution by field area proportion in the total field of South Korea. The predicted potential distribution of A. patulus was almost matched with actual presence data. The annual mean temperature had the highest contribution for distribution modeling of A. patulus. Area under curve (AUC) value of the model was 0.711. The highest regions were Gwangju for potential distribution, Jeju for 'raster risk index' and Gyeongbuk for 'regional risk index'. This different ranks among the index showed the importance about the development of various risk index for evaluating invasive plant risk.
Proceedings of the Korean Institute of Building Construction Conference
/
2002.11a
/
pp.117-121
/
2002
The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.
Journal of the Korea Institute of Building Construction
/
v.2
no.4
/
pp.131-135
/
2002
The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.
This study was conducted to investigate the correlation between the distribution chart and input data of the predicted 3-second gust and damage cost, by using the forecast field and analysis field of Regional Data Assimilation Prediction System (RDAPS) as initial input data of Korea risk assessment model (RAM) developed in the preceding study. In this study the cases of typhoon Rusa which caused occurred great damage to the Korean peninsula was analyzed to assess the suitability of initial input data. As a result, this study has found out that the distribution chart from the forecast field and analysis field predicted from the point where the effect due to the typhoon began had similarity in both 3-second gust and damage cost with the course of time. As a result of examining the correlation, the 3-second gust had over 0.8, and it means that the forecast field and analysis field show similar results. This study has shown that utilizing the forecast field as initial input data of Korea RAM could suit the purpose of pre-disaster prevention.
Proceedings of the Korean Institute of Building Construction Conference
/
2017.11a
/
pp.58-59
/
2017
As the construction industry has been increasingly complex, aging workers, hard-working avoiding young generation, foreign workers having language problem for the past decades, delivering of construction qualified workers has been a rising problem. This misalignment between the complex jobs and the number of skilled workers will continue to be in issue that the construction industry will face for following decades. Construction field workers who are working outside in uncontrollable condition unlike manufacturing industry are exposed to easily construction safety accident. There are so many efforts to prevent and control the construction accident. However, the relationships between the construction works and construction safety accident has not been well dealt and investigated based on objective accident data except for the qualitative study through interview, delphi and so on. Therefore this study analyzes job risk matrix exposed to safety accidents based on statistic data for 20 years from Korean Occupational Safety & Health Agency in order to prevent the construction field accidents.
Lee, Soon Sung;Shin, Dong Oh;Ji, Young Hoon;Kim, Dong Wook;An, Sohyoun;Park, Dong-Wook;Cho, Gyu Suk;Kim, Kum-Bae;Koo, Jihye;Oh, Yoon-Jin;Choi, Sang Hyoun
Progress in Medical Physics
/
v.27
no.3
/
pp.139-145
/
2016
With the development in field of industry and medicine, new machines and techniques are being launched. Moreover, the complexity of the techniques is associated to an increasing risk of incident. Especially, a small error in radiotherapy can lead to a serious patient-related incident, risk management is necessary in radiotherapy in order to reduce the risk of incident. However, in field of radiotherapy, there are no legally binding clauses for risk management and there is an absence of risk management systems at an institutional level. Therefore, we analyzed institutional status of risk management, reporting & classification systems, and risk assessment & analysis in 31 countries. For risk management and reporting systems, 65% of countries investigated had legislation or regulations; however, only 35% of countries used classification systems. It was found that 43% more countries had legislation for risk management in healthcare than those for radiotherapy; 19% more countries had reporting systems for healthcare than those for radiotherapy. For classification systems, 60% more countries had legislation, recommendation, and guidelines in the field of radiotherapy than those for healthcare. Recently, international institutes have published several reports for risk management and patient safety in radiotherapy, owing to which, countries adopting risk management for radiotherapy will gradually increase. Before adopting risk management in Korea, we should precisely understand the procedures and functions of risk management, in order to increase efficiency of risk management because classification & reporting system and risk assessment & analysis are connected organically, and institutional management is needed for high quality of risk management in Korea.
This study was attempted to analyze risk factors and suggest accident prevention in live line works for power transmission lines to be developed and applied in Korea. Safety problem cannot but occur at development of live line works and application to the field. With respect to this, problems likely to occur in the field among works adopting methods of works including live line works for power transmission lines were investigated and analyzed through documentary survey and risk assessment method. The results are summarized as follows. A risk assessment method model was suggested. This method enables scientific and systematic development of safety control. That is, the owner may autonomously induce safety control and build risk assessment database by work process to use them as best training data for workers. Also, in the field, it may induce all workers to participate in safety program and secure safety by making workers seek for safety working method under smooth flow from looking at risk factors to accident prevention activities. It is deemed that this humble study will prevent both accident and injury likely to occur in live line works for power transmission lines.
Objective: The aim of this paper is to introduce the activities and research trends of human reliability analysis including brief summary about contents and methods of the analysis. Background: Various approaches and methods have been suggested and used to assess human reliability in field of risk assessment of nuclear power plants. However, it has noticed that there is high uncertainty in human reliability analysis which results in a major bottleneck for risk-informed activities of nuclear power plants. Method: First and second generation methods of human reliability analysis are reviewed and a few representative methods are discussed from the risk assessment perspective. The strength and weakness of each method is also examined from the viewpoint of reliability analyst as a user. In addition, new research trends in this field are briefly summarized. Results: Human reliability analysis has become an important tool to support not only risk assessment but also system design of a centralized complex system. Conclusion: Human reliability analysis should be improved by active cooperation with researchers in field of human factors. Application: The trends of human reliability analysis explained in this paper will help researchers to find interest topics to which they could contribute.
Bae, Sun Hyun;Kim, Dong Wook;Kim, Mi-Sook;Shin, Myung-Hee;Park, Hee Chul;Lim, Do Hoon
Radiation Oncology Journal
/
v.35
no.1
/
pp.78-89
/
2017
Purpose: To determine the optimal radiotherapy technique for gastric mucosa-associated lymphoid tissue lymphoma (MALToma), we compared the dosimetric parameters and the risk of solid secondary cancer from scattered doses among anterior-posterior/ posterior-anterior parallel-opposed fields (AP/PA), anterior, posterior, right, and left lateral fields (4_field), 3-dimensional conformal radiotherapy (3D-CRT) using noncoplanar beams, and intensity-modulated radiotherapy composed of 7 coplanar beams (IMRT_co) and 7 coplanar and noncoplanar beams (IMRT_non). Materials and Methods: We retrospectively generated 5 planning techniques for 5 patients with gastric MALToma. Homogeneity index (HI), conformity index (CI), and mean doses of the kidney and liver were calculated from the dose-volume histograms. Applied the Biological Effects of Ionizing Radiation VII report to scattered doses, the lifetime attributable risk (LAR) was calculated to estimate the risk of solid secondary cancer. Results: The best value of CI was obtained with IMRT, although the HI varied among patients. The mean kidney dose was the highest with AP/PA, followed by 4_field, 3D-CRT, IMRT_co, and IMRT_non. On the other hand, the mean liver dose was the highest with 4_field and the lowest with AP/PA. Compared with 4_field, the LAR for 3D-CRT decreased except the lungs, and the LAR for IMRT_co and IMRT_non increased except the lungs. However, the absolute differences were much lower than <1%. Conclusion: Tailored RT techniques seem to be beneficial because it could achieve adjacent organ sparing with very small and clinically irrelevant increase of secondary solid cancer risk compared to the conventional techniques.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.