• Title/Summary/Keyword: Risk Field

Search Result 1,559, Processing Time 0.024 seconds

A Study on the Risk Level of Work Types in Nuclear Power Plant Construction (원자력발전소 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Lee, Jun Kyung;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

Predicting the Potential Habitat and Risk Assessment of Amaranthus patulus using MaxEnt (Maxent를 활용한 가는털비름(Amaranthus patulus)의 잠재서식지 예측 및 위험도 평가)

  • Lee, Yong Ho;Na, Chea Sun;Hong, Sun Hea;Sohn, Soo In;Kim, Chang Suk;Lee, In Yong;Oh, Young Ju
    • Korean Journal of Environmental Biology
    • /
    • v.36 no.4
    • /
    • pp.672-679
    • /
    • 2018
  • This study was conducted to predict the potential distribution and risk of invasive alien plant, Amaranthus patulus, in an agricultural area of South Korea. We collected 254 presence localities of A. patulus using field survey and literature search and stimulated the potential distribution area of A. patulus using maximum entropy modeling (MaxEnt) with six climatic variables. Two different kinds of agricultural risk index, raster risk index and regional risk index, were estimated. The 'raster risk index' was calculated by multiplying the potential distribution by the field area in $1{\times}1km$ and 'regional risk index' was calculated by multiplying the potential distribution by field area proportion in the total field of South Korea. The predicted potential distribution of A. patulus was almost matched with actual presence data. The annual mean temperature had the highest contribution for distribution modeling of A. patulus. Area under curve (AUC) value of the model was 0.711. The highest regions were Gwangju for potential distribution, Jeju for 'raster risk index' and Gyeongbuk for 'regional risk index'. This different ranks among the index showed the importance about the development of various risk index for evaluating invasive plant risk.

A Study on the Risk Analysis of Construction Method (건축공법 내부 리스크 분석에 관한 연구)

  • 윤여완;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.117-121
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF

A Study on the Risk Analysis of Construction Method (건축공법 내부 리스크 분석에 관한 연구)

  • Yoon, Yer-Wan;Yang, Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.131-135
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

Compatibility for the Typhoon Damages Predicted by Korea Risk Assessment Model Input Data (한국형 재해평가모형(RAM)의 초기입력자료 적합성 평가)

  • Park, Jong-Kil;Lee, Bo-Ram;Jung, Woo-Sik
    • Journal of Environmental Science International
    • /
    • v.24 no.7
    • /
    • pp.865-874
    • /
    • 2015
  • This study was conducted to investigate the correlation between the distribution chart and input data of the predicted 3-second gust and damage cost, by using the forecast field and analysis field of Regional Data Assimilation Prediction System (RDAPS) as initial input data of Korea risk assessment model (RAM) developed in the preceding study. In this study the cases of typhoon Rusa which caused occurred great damage to the Korean peninsula was analyzed to assess the suitability of initial input data. As a result, this study has found out that the distribution chart from the forecast field and analysis field predicted from the point where the effect due to the typhoon began had similarity in both 3-second gust and damage cost with the course of time. As a result of examining the correlation, the 3-second gust had over 0.8, and it means that the forecast field and analysis field show similar results. This study has shown that utilizing the forecast field as initial input data of Korea RAM could suit the purpose of pre-disaster prevention.

Analysis of Job Risk Matrix Exposed to Safety Accidents in Construction Field (건설현장 안전사고의 작업 리스크 매트릭스 분석)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.58-59
    • /
    • 2017
  • As the construction industry has been increasingly complex, aging workers, hard-working avoiding young generation, foreign workers having language problem for the past decades, delivering of construction qualified workers has been a rising problem. This misalignment between the complex jobs and the number of skilled workers will continue to be in issue that the construction industry will face for following decades. Construction field workers who are working outside in uncontrollable condition unlike manufacturing industry are exposed to easily construction safety accident. There are so many efforts to prevent and control the construction accident. However, the relationships between the construction works and construction safety accident has not been well dealt and investigated based on objective accident data except for the qualitative study through interview, delphi and so on. Therefore this study analyzes job risk matrix exposed to safety accidents based on statistic data for 20 years from Korean Occupational Safety & Health Agency in order to prevent the construction field accidents.

  • PDF

A Study of Institutional Status of Risk Management for Radiotherapy in Foreign Country

  • Lee, Soon Sung;Shin, Dong Oh;Ji, Young Hoon;Kim, Dong Wook;An, Sohyoun;Park, Dong-Wook;Cho, Gyu Suk;Kim, Kum-Bae;Koo, Jihye;Oh, Yoon-Jin;Choi, Sang Hyoun
    • Progress in Medical Physics
    • /
    • v.27 no.3
    • /
    • pp.139-145
    • /
    • 2016
  • With the development in field of industry and medicine, new machines and techniques are being launched. Moreover, the complexity of the techniques is associated to an increasing risk of incident. Especially, a small error in radiotherapy can lead to a serious patient-related incident, risk management is necessary in radiotherapy in order to reduce the risk of incident. However, in field of radiotherapy, there are no legally binding clauses for risk management and there is an absence of risk management systems at an institutional level. Therefore, we analyzed institutional status of risk management, reporting & classification systems, and risk assessment & analysis in 31 countries. For risk management and reporting systems, 65% of countries investigated had legislation or regulations; however, only 35% of countries used classification systems. It was found that 43% more countries had legislation for risk management in healthcare than those for radiotherapy; 19% more countries had reporting systems for healthcare than those for radiotherapy. For classification systems, 60% more countries had legislation, recommendation, and guidelines in the field of radiotherapy than those for healthcare. Recently, international institutes have published several reports for risk management and patient safety in radiotherapy, owing to which, countries adopting risk management for radiotherapy will gradually increase. Before adopting risk management in Korea, we should precisely understand the procedures and functions of risk management, in order to increase efficiency of risk management because classification & reporting system and risk assessment & analysis are connected organically, and institutional management is needed for high quality of risk management in Korea.

A Study on the Hazard Factor and Safety Management at Transmission Line During Live Line Works (송전선로 직접활선공법의 위험요인과 안전대책에 관한 연구)

  • Choi, Seung-Dong;Kang, Kyong-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.51-66
    • /
    • 2006
  • This study was attempted to analyze risk factors and suggest accident prevention in live line works for power transmission lines to be developed and applied in Korea. Safety problem cannot but occur at development of live line works and application to the field. With respect to this, problems likely to occur in the field among works adopting methods of works including live line works for power transmission lines were investigated and analyzed through documentary survey and risk assessment method. The results are summarized as follows. A risk assessment method model was suggested. This method enables scientific and systematic development of safety control. That is, the owner may autonomously induce safety control and build risk assessment database by work process to use them as best training data for workers. Also, in the field, it may induce all workers to participate in safety program and secure safety by making workers seek for safety working method under smooth flow from looking at risk factors to accident prevention activities. It is deemed that this humble study will prevent both accident and injury likely to occur in live line works for power transmission lines.

Human Reliability Analysis for Risk Assessment of Nuclear Power Plants (원자력발전소 위험도 평가를 위한 인간신뢰도분석)

  • Jung, Won-Dea;Kim, Jae-Whan
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.1
    • /
    • pp.55-64
    • /
    • 2011
  • Objective: The aim of this paper is to introduce the activities and research trends of human reliability analysis including brief summary about contents and methods of the analysis. Background: Various approaches and methods have been suggested and used to assess human reliability in field of risk assessment of nuclear power plants. However, it has noticed that there is high uncertainty in human reliability analysis which results in a major bottleneck for risk-informed activities of nuclear power plants. Method: First and second generation methods of human reliability analysis are reviewed and a few representative methods are discussed from the risk assessment perspective. The strength and weakness of each method is also examined from the viewpoint of reliability analyst as a user. In addition, new research trends in this field are briefly summarized. Results: Human reliability analysis has become an important tool to support not only risk assessment but also system design of a centralized complex system. Conclusion: Human reliability analysis should be improved by active cooperation with researchers in field of human factors. Application: The trends of human reliability analysis explained in this paper will help researchers to find interest topics to which they could contribute.

Radiotherapy for gastric mucosa-associated lymphoid tissue lymphoma: dosimetric comparison and risk assessment of solid secondary cancer

  • Bae, Sun Hyun;Kim, Dong Wook;Kim, Mi-Sook;Shin, Myung-Hee;Park, Hee Chul;Lim, Do Hoon
    • Radiation Oncology Journal
    • /
    • v.35 no.1
    • /
    • pp.78-89
    • /
    • 2017
  • Purpose: To determine the optimal radiotherapy technique for gastric mucosa-associated lymphoid tissue lymphoma (MALToma), we compared the dosimetric parameters and the risk of solid secondary cancer from scattered doses among anterior-posterior/ posterior-anterior parallel-opposed fields (AP/PA), anterior, posterior, right, and left lateral fields (4_field), 3-dimensional conformal radiotherapy (3D-CRT) using noncoplanar beams, and intensity-modulated radiotherapy composed of 7 coplanar beams (IMRT_co) and 7 coplanar and noncoplanar beams (IMRT_non). Materials and Methods: We retrospectively generated 5 planning techniques for 5 patients with gastric MALToma. Homogeneity index (HI), conformity index (CI), and mean doses of the kidney and liver were calculated from the dose-volume histograms. Applied the Biological Effects of Ionizing Radiation VII report to scattered doses, the lifetime attributable risk (LAR) was calculated to estimate the risk of solid secondary cancer. Results: The best value of CI was obtained with IMRT, although the HI varied among patients. The mean kidney dose was the highest with AP/PA, followed by 4_field, 3D-CRT, IMRT_co, and IMRT_non. On the other hand, the mean liver dose was the highest with 4_field and the lowest with AP/PA. Compared with 4_field, the LAR for 3D-CRT decreased except the lungs, and the LAR for IMRT_co and IMRT_non increased except the lungs. However, the absolute differences were much lower than <1%. Conclusion: Tailored RT techniques seem to be beneficial because it could achieve adjacent organ sparing with very small and clinically irrelevant increase of secondary solid cancer risk compared to the conventional techniques.