• 제목/요약/키워드: Risk Estimation and Determination

검색결과 22건 처리시간 0.026초

A TIME DETERMINATION MODEL INCORPORATING RISK MANAGEMENT BASED ON MALAYSIAN CASE STUDIES

  • Sim Nee Ting;Chung Thing Chong
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.642-648
    • /
    • 2009
  • Determining the total duration for a construction project is an integral part of project management in the construction industry. This is to ensure the project and all its associated activities can be carried out and completed within the time frame stipulated. There are several commonly used scheduling methods and techniques in project management, some of which involves manual calculation while others involve computer software. This paper looks into the various time determination methods, extracting out their differences and similarities. It also seeks to draw out the problems when determining time for projects, especially those encountered of case studies. Based on the results from the case studies, there were delays on certain projects even though time determination had been carried out rigorously prior to the commencement of the projects. This paper seeks to develop a time determination model, which incorporates risk management techniques into the calculations in order to improve the method for time estimation to minimize the chances of project delay.

  • PDF

공급사슬경영에서의 협업적 리스크 관리의 최적화 (Optimization of collaborative risk management in supply chain management)

  • 정장화;이영해;정정우
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.456-463
    • /
    • 2002
  • Nowadays. risk management in the enterprise is considered as the important activity. Risk management ran be defined as the activity which is the analysis of risk factors related to damages, the estimation of the magnitude of risk, and the determination of investment to protect damage in a company. Initially, risk management was originated in financial areas. But the concept of risk has been expanded in the enterprise. Most companies have extended their activities in various areas. In this tendency, most activities must be considered in supply chain So, risk management must be ronsidered as the concept in the viewpoint of supply chain. The framework of risk management in supply chain and the related mathematical model are represented in this paper. Risk management in supply chain ran provide a positive opportunity not only to protect various damages, but also to improve the relationship between partners.

  • PDF

경제적(經濟的) 환율노출관리(換率露出管理)와 송장통화결정(送狀通貨決定) (Economic FX Rate Exposure Management and Invoicing Currency Determination)

  • 문창권;임춘호
    • 통상정보연구
    • /
    • 제9권4호
    • /
    • pp.107-125
    • /
    • 2007
  • With the rapidly increasing of Korean enterprises, the importance of foreign exchange(FX) risk management for the future operation generated from FDI contract is becoming the critical problem of international business. This type of FX risk, called as "economic exposure risk", requires us of the unique risk management principles and techniques. In this paper, we identify the properties of economic exchange rate exposure, analyze the identification and measurement processes of risk sources and strength, and perform the estimation of the main determinants and its profile effects of the invoicing currency for the efficient management of economic FX exposure.

  • PDF

Kano 모델 기반 건설프로젝트 핵심 리스크관리 요인 도출 (Estimation of Key Risk Management Factors for Construction Projects Based on Kano Model)

  • 조진호;김병수
    • 대한토목학회논문집
    • /
    • 제42권2호
    • /
    • pp.239-248
    • /
    • 2022
  • 최근 건설환경의 변화에 따른 건설프로젝트에서 리스크는 현저하게 증가하고 있다. 리스크를 기회로 인식하는 적극적인 리스크관리가 요구된다. 본 연구의 목적은 Kano 모델, Timko CSC (Customer Satisfaction Coefficient), ASC (Average Satisfaction Coefficient)를 활용한 비교 분석을 통해 중요도 결정 방법의 리스크관리 모델을 제안하는 것이다. 선행연구를 바탕으로 델파이기법을 활용하여 실무자 면담을 통해 Kano 모델을 수정한 설문지를 통해 리스크관리 요인 결정의 타당성을 검토한다. 이를 통해 국내 건설프로젝트 실무자가 인식하는 핵심 리스크관리 요인을 선정하여 적합한 리스크관리 모델을 제시한다. 연구 결과, 건설프로젝트 리스크관리 검증을 위해 개발된 Kano 모델은 실무자의 리스크관리를 검증하는데 유효한 것으로 평가되었다. 본 연구에서 제시한 Kano 모델이 건설프로젝트 리스크관리의 중요도를 검증하는 데에 적극적으로 활용되기를 기대한다.

미생물 위해성 평가 방법을 이용한 살모넬라 발생수 추정 (Estimation of the Number of Salmonellosis Using Microbial Risk Assessment Methodology)

  • 최은영;박경진
    • 한국지역사회생활과학회지
    • /
    • 제15권2호
    • /
    • pp.167-177
    • /
    • 2004
  • 미생물 위해성 평가 방법론을 이용하여 살모넬라 발생 수를 추정하고, 기존의 연구 결과와 비교하여 그 활용 가능성에 대해 알아보았다. 살모넬라균의 오염수준은 국내에 발표된 각종 문헌(1997∼2000)과 관련 기관의 모니터링 자료(1999∼2001)를 수집하여 추정하였고, 식품 섭취 량은 2001 국민건강영양조사, 용량-반응 모델은 외국에서 발표된 연구 결과를 이용하였다. 각 변수를 시뮬레이션을 통해 추정한 결과 1년 동안 국내에서 발생 가능한 살모넬라 환자 수는 753,368명으로 나타났는데, 이는 보고된 환자수의 약 115배로 WHO의 추정배수보다는 낮은 결과를 보였다. 이상의 결과를 볼 때, 미생물 위해성 평가 방법은 식중독 발생 환자 수를 추정하고 식중독 관리에 있어서의 우선순위를 결정하는 데 이용이 가능한 것으로 보인다. 그러나 아직까지 검증 방법이 확립되어 있지 않고, 식중독균의 오염농도, 식품 섭취량, 용량-반응 관계, 유통ㆍ보관ㆍ조리 등의 실태에 관한 연구가 좀더 필요할 것으로 생각된다.

  • PDF

노후 상수관망 개량 우선순위 결정을 위한 구역별 위험도 분석 (Risk analysis of the old pipe networks for priority determination of renovation)

  • 이재현;이상목;박병수;권혁재
    • 한국수자원학회논문집
    • /
    • 제55권spc1호
    • /
    • pp.1167-1175
    • /
    • 2022
  • 본 연구에서는 노후도를 보다 간단히 평가할 수 있는 운영지수 분석법을 개발하였고 이를 기존의 노후도 분석법과 비교 분석하였다. 청주시 상수관망에 적용하여 노후도를 비교 분석하였으며 사용성을 입증하였다. 기존의 간접평가법 분석결과, 율량동(구시가지), 내덕1동, 용암2동 상수관망의 노후도가 가장 높은 것으로 분석되었으며, 신뢰성해석을 통한 안전도 분석 결과 내덕1동 상수관망이 직경 200 mm, 300 mm 강관 모두 파괴확률 3.21%, 4.65%로 안전도가 가장 취약한 것으로 분석되었다. 운영지수 분석법의 경우, 내덕1동 상수관망이 직경 200 mm, 300 mm 강관 모두 위험도 0.2609, 0.2644로 가장 높은 것으로 분석되었으며, 개량 우선순위는 비슷한 것으로 나타났다. 따라서 향후 운영지수 분석법을 통해 상수도관을 보다 간단하게 노후도를 분석하여 상수관망의 운영관리에 활용이 가능할 것으로 판단된다.

Parametric survival model based on the Lévy distribution

  • Valencia-Orozco, Andrea;Tovar-Cuevas, Jose R.
    • Communications for Statistical Applications and Methods
    • /
    • 제26권5호
    • /
    • pp.445-461
    • /
    • 2019
  • It is possible that data are not always fitted with sufficient precision by the existing distributions; therefore this article presents a methodology that enables the use of families of asymmetric distributions as alternative probabilistic models for survival analysis, with censorship on the right, different from those usually studied (the Exponential, Gamma, Weibull, and Lognormal distributions). We use a more flexible parametric model in terms of density behavior, assuming that data can be fit by a distribution of stable distribution families considered unconventional in the analyses of survival data that are appropriate when extreme values occur, with small probabilities that should not be ignored. In the methodology, the determination of the analytical expression of the risk function h(t) of the $L{\acute{e}}vy$ distribution is included, as it is not usually reported in the literature. A simulation was conducted to evaluate the performance of the candidate distribution when modeling survival times, including the estimation of parameters via the maximum likelihood method, survival function ${\hat{S}}$(t) and Kaplan-Meier estimator. The obtained estimates did not exhibit significant changes for different sample sizes and censorship fractions in the sample. To illustrate the usefulness of the proposed methodology, an application with real data, regarding the survival times of patients with colon cancer, was considered.

연구실 위험성평가방법 개선에 관한 연구 (A Study on the Improvement of Risk Assessment Method in Laboratory)

  • 김수태
    • 한국재난정보학회 논문집
    • /
    • 제18권3호
    • /
    • pp.444-456
    • /
    • 2022
  • 연구목적: 연구실험실에는 사전유해인자위험분석을 실시하도록 하고 있으나 실행하지 않는 연구실험실이 많다. 연구실험실의 안전을 확보하기 위한 목적으로 좀 더 쉽게 위험성평가를 적용 할 수 있도록 개선점을 찾고자 한다. 연구방법: 선행논문 및 과학기술정보통신부 연구실 안전관리 실태조사 보고서 자료를 활용하였다. 사전유해인자위험분석과 산업안전보건법에 의한 위험성평가를 비교하여 연구하였다. 연구결과: 연구실험실에 대한 위험성을 평가할 수 있는 기법을 제시하였다. 연구실험실 위험성평가시 가능성(빈도)과 중대성(강도)의 크기를 추정할 수 있도록 방법을 제시하였다. 결론: 연구실험실에서 쉽게 적용할 수 있도록 체크리스트 형태의 위험성평가 기법을 제시하였고, 실제 평가해 보았다. 연구실험실에서 위험성평가를 통한 개선을 실시하여 안전사고 예방에 도움이 될 것으로 기대한다.

퍼지이론과 전문가 시스템을 이용한 철도 전력 설비의 고장률 평가와 유지보수 우선순위의 결정 (Estimation for Failure Rate of Railway Power Facility and Determination of Maintenance Priority Order using Fuzzy Theory and Expert System)

  • 이윤성;권기량;김진오;김형철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.495-504
    • /
    • 2009
  • As the Reliability Centered Maintenance(RCM) is being studied, maintenance tasks can be performed effectively through the Risk Priority Number(RPN) evaluation about the components in the system. The RPN is usually calculated through arithmetical operations of three values, Severity, Occurrence, and Detection for each facility. This RPN provides information that includes risk level of the facility and the priority order of maintenance tasks for facility. However, if there is no sufficient historical failure data, it is difficult to calculate the RPN. In this case, historical failure data from other sources can be used and apply this data to korean railway system. In this paper, it is proposed that a new methodology to model the failure rate as a fuzzy membership function. This method is based on failure data from other sources by means of the fuzzy theory and the expert opinion system. And considering assessment tendency of each expert, distortions that happened when the failure rate of facilities is estimated were minimized. This results determine Occurrence values of facilities. Taking advantage of this result., the RPN can be calculated with Severity and Detection of facilities by using the fuzzy operation. The proposed method is applied the rail-way power substation.

  • PDF

WLAN 환경에서 효율적인 실내측위 결정을 위한 혼합 SVM/ANN 알고리즘 (Hybrid SVM/ANN Algorithm for Efficient Indoor Positioning Determination in WLAN Environment)

  • 권용만;이장재
    • 통합자연과학논문집
    • /
    • 제4권3호
    • /
    • pp.238-242
    • /
    • 2011
  • For any pattern matching based algorithm in WLAN environment, the characteristics of signal to noise ratio(SNR) to multiple access points(APs) are utilized to establish database in the training phase, and in the estimation phase, the actual two dimensional coordinates of mobile unit(MU) are estimated based on the comparison between the new recorded SNR and fingerprints stored in database. The system that uses the artificial neural network(ANN) falls in a local minima when it learns many nonlinear data, and its classification accuracy ratio becomes low. To make up for this risk, the SVM/ANN hybrid algorithm is proposed in this paper. The proposed algorithm is the method that ANN learns selectively after clustering the SNR data by SVM, then more improved performance estimation can be obtained than using ANN only and The proposed algorithm can make the higher classification accuracy by decreasing the nonlinearity of the massive data during the training procedure. Experimental results indicate that the proposed SVM/ANN hybrid algorithm generally outperforms ANN algorithm.