Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.11 no.1
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.

A Developmental Methodology of Environmental Impact Assessment: Application of Health Risk Assessment (환경영향평가에 있어서 건강위해성평가 기법의 활용방안에 관한 연구)

  • Koo, J.K.;Chung, Y.
    • Journal of Environmental Impact Assessment
    • /
    • v.1 no.1
    • /
    • pp.51-59
    • /
    • 1992
  • Environmental Impact Assessment(EIA) is defined as an activity designed to identify and predict the impact on the environment. In the process of an EIA, the quantitative evaluation is generally performed for the air and water quality which have the national environmental quality standards. But the predicted values for the air and water quality are simply compared to the environmental standards. At present, the EIA process of Korea has no consideration for the possible human health risk resulting from the development projects. Environmental Health Impact Assessment(EHIA) is an applied methodology of EIA to estimate the acceptable health risk caused by a specified level of environmental pollutants. Estimating the excessive lifetime risk that is a possibility of dying of a certain disease by environmental contaminants, is useful as an evaluation technique of EHIA. It is recommanded the decision-makers to make efficient use of EHIA not only the development projects but also legislative proposals, policies and programmes in future.

  • PDF

Development of an Accident Sequence Precursor Methodology and its Application to Significant Accident Precursors

  • Jang, Seunghyun;Park, Sunghyun;Jae, Moosung
    • Nuclear Engineering and Technology
    • /
    • v.49 no.2
    • /
    • pp.313-326
    • /
    • 2017
  • The systematic management of plant risk is crucial for enhancing the safety of nuclear power plants and for designing new nuclear power plants. Accident sequence precursor (ASP) analysis may be able to provide risk significance of operational experience by using probabilistic risk assessment to evaluate an operational event quantitatively in terms of its impact on core damage. In this study, an ASP methodology for two operation mode, full power and low power/shutdown operation, has been developed and applied to significant accident precursors that may occur during the operation of nuclear power plants. Two operational events, loss of feedwater and steam generator tube rupture, are identified as ASPs. Therefore, the ASP methodology developed in this study may contribute to identifying plant risk significance as well as to enhancing the safety of nuclear power plants by applying this methodology systematically.

Radiological Risk Assessment for the Public Under the Loss of Medium and Large Sources Using Bayesian Methodology (베이지안 기법에 의거한 중대형 방사선원의 분실 시 일반인에 대한 방사선 위험도의 평가)

  • Kim, Joo-Yeon;Jang, Han-Ki;Lee, Jai-Ki
    • Journal of Radiation Protection and Research
    • /
    • v.30 no.2
    • /
    • pp.91-97
    • /
    • 2005
  • Bayesian methodology is appropriated for use in PRA because subjective knowledges as well as objective data are applied to assessment. In this study, radiological risk based on Bayesian methodology is assessed for the loss of source in field radiography. The exposure scenario for the lost source presented in U.S. NRC is reconstructed by considering the domestic situation and Bayes theorem is applied to updating of failure probabilities of safety functions. In case of updating of failure probabilities, it shows that 5 % Bayes credible intervals using Jeffreys prior distribution are lower than ones using vague prior distribution. It is noted that Jeffreys prior distribution is appropriated in risk assessment for systems having very low failure probabilities. And, it shows that the mean of the expected annual dose for the public based on Bayesian methodology is higher than the dose based on classical methodology because the means of the updated probabilities are higher than classical probabilities. The database for radiological risk assessment are sparse in domestic. It summarizes that Bayesian methodology can be applied as an useful alternative lot risk assessment and the study on risk assessment will be contributed to risk-informed regulation in the field of radiation safety.

Construction Risk Assessment Methodology Using Site Risk Influence Factors (건설현장 위험영향요소 기반의 위험도 산정 방법론)

  • Lee, Hyun-Soo;Kim, Hyun-Soo;Park, Moon-Seo;Lee, Kwang-Pyo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Considering variable and changeable characteristics of construction site, risk of same trade can be different by combination of inherent characteristics. But established safety management has performed like other industries not reflecting characteristics of construction. So, to suggest risk assessment methodology considering risk influence factors in construction site, this study extracts risk influence factors by literature reviews and surveys, builds the weighting system for classification of factors. And risk of trade is calculated based on frequency and severity of risk. Risk assessment methodology is suggested by integrating risk influence factors and risk of trade. From this, risk considering the conditions of construction sites can be derived and based on the derived risk, safety management can be performed more effectively. This study has meaning for assessing the risk which can reflect characteristics of construction site considering risk influence factors.

A Study on the Risk Assessment Methodology and Application for International Plants Construction (해외 플랜트 공사 리스크 평가 방안 및 적용에 관한 연구)

  • An, Sung-Hoon;Lee, Young-Nam;Jo, Ho-Kyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.134-142
    • /
    • 2008
  • Recently, international plants construction markets are expending. Specially, oil/gas plants constructions in Middle-East are booming. However, international plants construction projects are high risky. So a risk assessments and managements methodology for international plants construction is needed. In this study, the risk assessment methodology for international plants construction is proposed on the basis of the literature review in the international construction risk assessment methods and the knowledge of experts explored by interview. In addition, case study in Middle East was applied for reviewing these risk assessments and managements methodology for international plants construction.

The Study of Risk Matrix Development for Urban Metro EMU (도시철도차량 적용을 위한 위험도 매트릭스 개발에 관한 연구)

  • Kim, Young-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.6
    • /
    • pp.111-117
    • /
    • 2011
  • Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.

Comparative Analysis of Risk Assessment Tools for Infectious Diseases (국외 감염병 위험도 평가체계의 비교분석)

  • Choi, Eunmi;Woo, Darae;Choe, YoungJune;Yeh, Jungyong;Park, Sangshin
    • Health Policy and Management
    • /
    • v.32 no.4
    • /
    • pp.380-388
    • /
    • 2022
  • Background: Emerging infectious diseases, such as Middle East respiratory syndrome or coronavirus disease 2019, pose a continuous threat to public health, making a risk assessment necessary for infectious disease control and prevention. Therefore, we aimed to investigate the risk assessment methods for infectious diseases used by major foreign countries and organizations. Methods: We conducted an investigation and comparative analysis of risk assessment and risk determination methods for infectious diseases. The risk assessment tools included the strategic toolkit for assessing risks, influenza risk assessment tool, pandemic severity assessment framework, and rapid risk assessment methodology. Results: The most frequently reported risk elements were disease severity, antiviral treatment, attack rate, population immunity, and basic productive ratio. The risk evaluation method was evaluated quantitatively and qualitatively by the stakeholders at each institution. Additionally, the final risk level was visualized in a matrix, framework, and x and y-axis. Conclusion: Considering the risk assessment tools, the risk element was classified based on the duplicate of each indicator, and risk evaluation and level of risk assessment were analyzed.

Integrated Level 1-Level 2 decommissioning probabilistic risk assessment for boiling water reactors

  • Mercurio, Davide;Andersen, Vincent M.;Wagner, Kenneth C.
    • Nuclear Engineering and Technology
    • /
    • v.50 no.5
    • /
    • pp.627-638
    • /
    • 2018
  • This article describes an integrated Level 1-Level 2 probabilistic risk assessment (PRA) methodology to evaluate the radiological risk during postulated accident scenarios initiated during the decommissioning phase of a typical Mark I containment boiling water reactor. The fuel damage scenarios include those initiated while the reactor is permanently shut down, defueled, and the spent fuel is located into the spent fuel storage pool. This article focuses on the integrated Level 1-Level 2 PRA aspects of the analysis, from the beginning of the accident to the radiological release into the environment. The integrated Level 1-Level 2 decommissioning PRA uses event trees and fault trees that assess the accident progression until and after fuel damage. Detailed deterministic severe accident analyses are performed to support the fault tree/event tree development and to provide source term information for the various pieces of the Level 1-Level 2 model. Source terms information is collected from accidents occurring in both the reactor pressure vessel and the spent fuel pool, including simultaneous accidents. The Level 1-Level 2 PRA model evaluates the temporal and physical changes in plant conditions including consideration of major uncertainties. The goal of this article is to provide a methodology framework to perform a decommissioning Probabilistic Risk Assessment (PRA), and an application to a real case study is provided to show the use of the methodology. Results will be derived from the integrated Level 1-Level 2 decommissioning PSA event tree in terms of fuel damage frequency, large release frequency, and large early release frequency, including uncertainties.

Risk Management and Assessment Methodology in System Design (위험관리 프로세서와 평가의 새로운 접근)

  • 조희근;박영원
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.2 no.2
    • /
    • pp.197-208
    • /
    • 1999
  • Recently, risk management is a very important issue in many industrial applications. This paper describes a general structure for risk management and suggests a new risk assessment methodology. In risk management applications of financial or insurance industries, there are many methodologies developed for practical use. However, areas for improvement exist to facilitate the application of the methods. Two major risk assessment methodologies have been developed and widely applied in system engineering. One is in its original development application from aerospace and defense industry, and the other was developed in applied software engineering. In a large and complicated system development application, an effective risk management can reduce total development cost as well as uncertainty in achieving project goals of schedule and performance.

  • PDF