Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

Research on the Production of Risk Maps on Cut Slope Using Weather Information and Adaboost Model (기상정보와 Adaboost 모델을 이용한 깎기비탈면 위험도 지도 개발 연구)

  • Woo, Yonghoon;Kim, Seung-Hyun;Kim, Jin uk;Park, GwangHae
    • The Journal of Engineering Geology
    • /
    • v.30 no.4
    • /
    • pp.663-671
    • /
    • 2020
  • Recently, there have been many natural disasters in Korea, not only in forest areas but also in urban areas, and the national requirements for them are increasing. In particular, there is no pre-disaster information system that can systematically manage the collapse of the slope of the national highway. In this study, big data analysis was conducted on the factors causing slope collapse based on the detailed investigation report on the slope collapse of national roads in Gangwon-do and Gyeongsang-do areas managed by the Cut Slope Management System (CSMS) and the basic survey of slope failures. Based on the analysis results, a slope collapse risk prediction model was established through Adaboost, a classification-based machine learning model, reflecting the collapse slope location and weather information. It also developed a visualization map for the risk of slope collapse, which is a visualization program, to show that it can be used for preemptive disaster prevention measures by identifying the risk of slope due to changes in weather conditions.

Hazardous Material Process Risk Evaluation Using HAZOP and Bow-tie (HAZOP 및 BOW-TIE를 이용한 위험물질 취급공정의 위험성평가)

  • Min-Seo Nam;Byung-Tae Yoo
    • Journal of the Korean Institute of Gas
    • /
    • v.28 no.1
    • /
    • pp.35-43
    • /
    • 2024
  • With continuous advancements in industry, science, and technology, there is a steady increase in the number and utilization of new chemicals. The growing societal emphasis on chemical safety management is paralleled by an increasing public demand for robust safety measures. While various ministries at the government level oversee the safety management of chemical substances, the occurrence of accidents related to chemical substances remains frequent each year due to problems such as aging facilities and careless handling. Upon analyzing domestic chemical accident cases, incidents occurred predominantly in the sequence of leakage, explosion, fire, and others. The main causes of these accidents were examined, revealing facility defects and non-compliance with safety management as the primary contributing factors. In this study, Hazard and Operability Analysis (HAZOP) was employed to identify hazardous risk factors associated with the handling of hydrofluoric acid in workplaces, and a risk assessment was performed using Bow-Tie method. Based on the results of this study, it is expected to enhance safety management plans aimed at preventing chemical accidents in workplaces dealing with similar facilities. Ultimately, these insights contribute to the development of an advanced chemical safety management system, capable of proactively preventing potential chemical accidents.

Development of a Risk Management Information System(RMIS) for the LPG refueling station by utilizing GIS (지리정보시스템(GIS)을 이용한 LPG 충전소 위험관리정보시스템 개발에 관한 연구)

  • Ham, Eun-Gu;Roh, Sam-Kew
    • 한국가스학회:학술대회논문집
    • /
    • 2007.04a
    • /
    • pp.195-200
    • /
    • 2007
  • 본 연구는 도심지에 위치한 LPG 충전소를 연구범위로 하여 공간정보의 활용이 가장 많이 요구되는 안전관리 분야의 업무를 중심으로 공간정보를 효율적으로 구축 활용하기 위하여 데이터베이스를 중심으로 위험관리정보 시스템을 개발하였다. 이를 바탕으로 정량적 위험성 평가의 자동화를 통해 나타난 위험성을 실시간에 제어하기 위한 필요조건을 표준화하여 기초 정보자료로 구축, 이를 지리정보기능과 연동하여 LPG 충전소의 안전검사의 효율화, 사전 위험성 평가, 사고대응 판단의 효과적인 의사결정을 유도 할 수 있는 기반을 제공한다. 위험관리정보시스템(RMIS, Risk Management Information System) 개발절차는 다음과 같다 첫째, 도심지에 위치한 LPG 충전소 위험성 평가를 수행함에 있어서 기본적인 데이터인 부지내(On-site) 관련 자료와 부지 외(Off-site) 관련 자료를 관계형 데이터베이스(RDB, Relational Database)로 개발하였다. 둘째, Visual Basic을 이용하여 사용자가 효과적으로 위험을 관리 제어 할 수 있는 위험관리 통합 데이터베이스 시스템 개발하였다. 셋째, 위험관리 통합 데이터베이스 시스템과 지리정보시스템에 연동을 통한 의사결정 방안 제시하였다. 위험관리정보시스템(RMIS) 프로그램을 개발을 통하여 다음과 같은 결과를 도출하였다. 첫째, 위험관리 데이터 이용하여 사용자와 검사자가 효과적으로 위험을 사전관리 할 수 있는 공유정보를 구축하였다. 둘째, 위험 관리를 부지 내와 부지 외로 나누어 관리함으로서 시설 내부 뿐 만 아니라 시설외부에 미치는 영향을 모두 고려하여 구축하므로 서, 중대사고에 대응 할 수 있는 종합적인 안전관리 기반을 조성하였다. 셋째, 사용자 인터페이스를 바탕으로 비상사태 발생시에 신속하고 정확한 의사결정을 할 수 있는 기반을 조성하였다. 제공하여 응용GIS 구축의 생산성 및 품질 향상에 기여할 뿐만 아니라 우리의 최종목표인 GIS 소프트웨어 자동 생산에도 크게 기여할 것으로 사료된다. 등)을 교통망상에 표시할 수 있음으로서 의사결정에 보다 많은 도움을 줄 수 있을 것이다. 비트율의 증가와 화질 열화는 각각 최대 1.32%와 최대 0.11dB로 무시할 수 있을 정도로 작음을 확인 하였다.을 알 수 있었다. 현지관측에 비해 막대한 비용과 시간을 절약할 수 있는 위성영상해석방법을 이용한 방법은 해양수질파악이 가능할 것으로 판단되며, GIS를 이용하여 다양하고 복잡한 자료를 데이터베이스화함으로써 가시화하고, 이를 기초로 공간분석을 실시함으로써 환경요소별 공간분포에 대한 파악을 통해 수치모형실험을 이용한 각종 환경영향의 평가 및 예측을 위한 기초자료로 이용이 가능할 것으로 사료된다.염총량관리 기본계획 시 구축된 모형 매개변수를 바탕으로 분석을 수행하였다. 일차오차분석을 이용하여 수리매개변수와 수질매개변수의 수질항목별 상대적 기여도를 파악해 본 결과, 수리매개변수는 DO, BOD, 유기질소, 유기인 모든 항목에 일정 정도의 상대적 기여도를 가지고 있는 것을 알 수 있었다. 이로부터 수질 모형의 적용 시 수리 매개변수 또한 수질 매개변수의 추정 시와 같이 보다 세심한 주의를 기울여 추정할 필요가 있을 것으로 판단된다.변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간은 24개월이하의 중단기가 적합함을 발견하였다. 이상의 행태적 측면과 투자성과측면의 실증결과를 통하여 한국주식시장에 있어서 시장수익률을 평균적으로 초과할 수 있는 거래전략은 존재하므로 이러한 전략을 개발 및 활용할 수 있으며, 특히, 한국주

  • PDF

Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase (플랜트 시설물 시공단계의 4M기법을 활용한 전문가 인식조사에 의한 안전관리요인 분석)

  • Kim, Kyujin;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.18-27
    • /
    • 2016
  • The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.

Strategy for Information Merging and Utilization for Comprehensive Risk Analysis on Regional Societal Disasters (지역 사회재난 위험분석을 위한 정보 융합 및 활용 방안)

  • Shin, Hee-Young;Cha, Areum;Kim, Kyoungjun;Jeong, Jae-Hak
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.148-149
    • /
    • 2022
  • 본 논문에서는 지역별로 발생 양상이 다른 사회재난의 종합적 위험분석을 위한 정보활용 방안 및 전략을 제안한다. 사회재난은 재난유형이 매우 다양하며, 각기 다른 발생 및 전파양상을 가지고 있어 전문성을 기반으로 관계하고 있는 개별부처에서 각각 관리되고 있다. 재난이 발생 후 대응, 수습 및 복구에 이르는 활동은 대표적인 현장대응 부처인 행정안전부, 경찰청, 소방청 등에서 주로 담당하고 있으나, 예방 및 대비 활동은 각 부처에서 개별법령에 의한 제도 및 정책에 의해 위험요소를 저감하기 위한 활동으로 진행된다. 예를 들어 화학사고의 경우 화학사고예방관리계획서, 장외영향평가, 화재는 방화지구, 화재경계지구, 산불은 산불취약지수 등 각각의 물리적 매커니즘을 적정히 고려하는 이론적 근거의 의해 사전에 그 위험을 평가하고 있으나 재난관리 예방을 담당하는 부처에 까지 연속성을 가지고 그 결과들이 적극적으로 활용되고 있지 못하고 있다. 이에 본 연구에서는 각 부처에서 개별법령에 의해 평가되는 공신력 있는 자료들의 융합적 해석에 근거한 종합위험 평가 개념을 정립하고 실제 활용 가능성에 대해 논하고자 한다.

  • PDF

An Exploratory Research on Quantitative Risk Assessment Methodology Throughout Success Factor Analysis in Project Financing (PF 개발사업의 성공요인 분석을 통한 리스크 평가체계 구축을 위한 기초연구)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.92-102
    • /
    • 2013
  • A Project Financing (PF) is a form of project delivery system that is carried out for the purpose of trying to give help to the development of national economy and the construction industry in order attract private investment. However, in the case of Korea, many PF projects are only taking into account the aspect of maximizing development benefits, and the proliferation of PF results in project failure. In addition, the interruption of business has been one after another in the aftermath of the recent financial crisis. These major cause is the result of efforts to block the potential risk of objectively quantifying operations. Nowadays, PF risk analysis in terms of various factors is insufficient. The purpose of this study is to identify and quantify the extensive risk elements to classify the cause of affecting the success of the project PF study prior to propose a methodology for evaluating the integrity of the project PF based on this and to provide a quantitative system that can evaluate the business risk. This study identified the factors that affect the PF business success and failure and establish the metrics that can be quantified through existing research and expert interviews. Factors influencing the success of the PF obtained as a result of surveys and interviews in assessing the soundness of the PF development conditions in the future be able to take advantage of, as well as an objective assessment tool to be able to take advantage of the development is expected.

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

Approach to Method of Process Failure Mode and Effect Analysis for Construction Industry (건설업에서의 시공FMEA적용 방안 연구)

  • Kim Yoon-Sung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.271-274
    • /
    • 2002
  • The aim of FMEA method which is already generalized in the industry engineering is to grasp a possibility that defect forms will appear. And it is a means of prevention step to let person remove obstacles which have an influence on customers beforehand in order. The two parts of FMEA are Design FMEA which we prepare in an early stage and Process FMEA which we prepare in time previous to mass production. This Study apply Process FMEA to execution fields of the construction industry.