• Title/Summary/Keyword: Risk사전관리

Search Result 239, Processing Time 0.026 seconds

A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects (개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구)

  • Kim, Han;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

  • PDF

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

Risk Governance Models Seen from the STS Perspectives: Risk Analysis Framework and the Precautionary Principles (STS 관점에서 본 위험 거버넌스 모델: 위험분석과 사전주의 원칙을 중심으로)

  • Hyun, Jaehwan;Hong, Sungook
    • Journal of Science and Technology Studies
    • /
    • v.15 no.1
    • /
    • pp.281-325
    • /
    • 2015
  • In this paper, we continue our previous study on the differences, similarities and interfaces between the various models of scientific governance discussed in STS and those in risk governance developed by risk studies. In the previous paper we illuminated that theoretical differences among STS scholars on scientific governance and public participation goes back to the 1970s and 1980s, during which they first laid down the conceptual basis of STS. In this paper we investigate how these divergent positions among STS scholars influenced their evaluations of precautionary principle and the framework of risk analysis (especially the separation between risk assessment and risk management), which are the two main paradigms in the area of risk regulation. By doing that, this paper will show divergent positions of STS scholars on risk analysis and precautionary principle. Further, we will suggest some theoretical and practical interfaces between STS and risk governance models.

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

A Development of the Risk Factor Dictionary for the Private Finance Construction Project (민간투자 건설사업 위험요인사전 개발)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.152-160
    • /
    • 2007
  • Recently, the government is very active to secure the financial resources by inducement of the private investment in fulfilling an extension of the SOC facilities. One of the reasons that the private investors hesitate to put money into the private finance projects, however, is the lack of knowledges about various risks to be possibly incurred during the project execution. This research was performed as one of the preparation works in order for a A engineering company to act as a prime contractor of the project management service in the private finance project, and finally developed the risk factor dictionary as a new concept to satisfy the requirement of a A company and overcome a limit of the existing risk checklists. Although the risk factor dictionary looks like the only simplified table to be the risk factors identified in three dimensions, the impacts and response strategies expressed in narrative and multi-items, and the responsible parties indicated, it has great meanings to get a lot of direct and indirect accomplishments over the simplified table during the development process.

A Study on the Mutual Risk Management Between Container Terminal Operator and Shipping Company in Gwangyang Port (광양항의 컨테이너터미널 운영사와 해운선사간의 상호리스크 관리방안 연구)

  • Choi, Yong-Seok;Park, Sung-Su
    • Journal of Korea Port Economic Association
    • /
    • v.26 no.4
    • /
    • pp.168-187
    • /
    • 2010
  • The mutual risk management in port is really important for operating the enterprise between container terminals who provide port service and shipping liners who use the port service. This study is performed to contribute to obtain the competitive power of domestic shipping and harbor industry by getting solution of mutual risk management which can make Win-Win strategy on each other as an alternative idea. We suggested two kinds of management models to promote common benefits between container terminals and shipping liners. It is necessary to push positive support and cooperation from government and belonging related organizations for activating the Gwangyang port. In this study, we presented the efficient method to manage mutual risks between container terminals and shipping liners.

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (건설사업의 효율적인 리스크관리를 위한 RBES 분석기법과 적용에 대한 연구)

  • Park, Jaeil;Kim, Dongjin;Kim, Gyeonghyun;Lim, Jongkwon;Lee, Minjaee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.125-133
    • /
    • 2016
  • The Project Risk Management is intended to result in the effective management by identifying in advance and mitigating all significant risks including project risks and opportunities during the entire project life cycle - from project inception to completion of construction. It is impossible to predict an exact budget and construction duration before finishing a project. So, Washington Department of Transportation mandates that workshop-based risk management is conducted for projects over specific cost. However, the domestic construction sites have depended on numerical risk analysis without any workshop and efficient risk management have not made. Therefore, in this study, we propose the effective risk management using the RBES program which is very useful for workshop-based risk management and pre & post mitigation, by workshop-based risk management techniques. This proposed risk management approach is applied to a domestic 'A' river recovery project. It is concluded that we may expect the effect to mitigate the total cost overrun problem and the construction duration delay effect in the project by identifying significant risks and by preparing effective risk mitigation strategies.

Applicability and Utility of the Precautionary Principle in Developing Measures for CCS Risk Management (탄소 포집 및 저장(CCS) 위험 관리 방안 수립 시 사전예방원칙 적용 필요성과 유용성)

  • Yim, Hyosook
    • Journal of Environmental Policy
    • /
    • v.13 no.1
    • /
    • pp.3-23
    • /
    • 2014
  • TThe CCS, gathering attention as a practical measure against climate change, has various potential risks within itself. Identifying those risks and developing proper countermeasures for each one, therefore, is essential. Failure to take proper measures against such risks may result in significant damages and accidents, causing social anxiety and unwillingness to accept CCS. This study proposes the precautionary principle as a fundamental principle for CCS risk management. While the justifications for the precautionary principle are acceptable, there have been criticisms on its limitations including its impracticality. The purpose of this study was, therefore, to identify detailed application strategies to overcome those limitations. The risk factors related to CCS consist of quantifiable risk domains as well as a number of those with high uncertainty and ambiguity. Thus, there is a need to develop differentiated coping measures, meaning that the precautionary principle should be applied. The risk assessment and management applying the precautionary principle has implication of social appraisal based on wide participation and communication among the interested parties, which may be a useful approach for expanding social applicability.

  • PDF

Is the Precautionary Principle Unscientific?: 'Rationality' of the Precautionary Principle and its Conflicts with Risk Analysis Framework (사전주의의 원칙은 비과학적인가?: 위험 분석과의 논쟁을 통해 본 사전주의 원칙의 '합리성')

  • Ha, Dae-Cheong
    • Journal of Science and Technology Studies
    • /
    • v.10 no.2
    • /
    • pp.143-174
    • /
    • 2010
  • How can a regulatory policy to address potential hazards be made legitimate in the face of scientific uncertainty? The precautionary principle has been gradually regarded as the most persuasive answer to this intricate question in Europe since the 1970s and generally recognized as a guiding principle in international environmental law. This principle, however, has often been subject to diverse concerns and criticisms due to its vague definition. This article tries to elaborate the precautionary principle while reviewing both the validity and unreasonableness of these criticisms over this principle. Then, this article explores the policy relevance of this principle by applying this elaborated definition to the concrete case of risk governance such as the risk assesment of food safety. In the end, this paper emphasizes the fact that the precautionary principle can be applied in the field of risk governance, refuting the argument that the precautionary principle is only a moral attitude or a political position.

  • PDF