A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects

개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구

  • 김한 (강원대학교 일반대학원 건축공학과) ;
  • 김선규 (강원대학교 건축학부)
  • Published : 2008.11.07

Abstract

The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

최근 국내에서 대두되고 있는 도시재생 개발사업은 신도시 및 기존 시가지를 중심으로 공공기관의 주도하에 이루어지고 있다. 이러한 개발사업들은 사전 평가 단계에서의 위험요인 관리가 사업의 성공과 부가가치 창출에 중요한 요인임에도 불구하고 안전관리 수준에서 머물고 있다. 이는 위험요인들을 분석할 수 있는 다양한 위험 분석 기법들에 대한 부정확한 이해 및 그 중요도를 파악하지 못하고 있으며, 단계별 적절한 분석 기법의 적용이 미흡하기 때문이다. 따라서 본 연구에서는 개발 사업에 대한 전반적인 이해와 개발 사업 사전평가 단계에서의 구성 및 정의, 사전평가 단계에서 적용될 수 있는 위험분석기법들에 대한 정의 및 분석을 통해 사전평가 단계에서 나타날 수 있는 다양한 위험요인들을 보다 효과적으로 관리할 수 있는 위험분석기법들을 마련하고자 한다.

Keywords