Lifting Work Process Optimization Method in High-rise Building Construction Through Improvement of CYCLONE Modeling Method (CYCLONE 모델링 기법 개선을 통한 초고층 공사의 자재 양중 작업 프로세스 최적화 연구)

  • Hawng, Doowon;Kwon, Okyung;Choi, Yoonki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.58-70
    • /
    • 2017
  • The planning for material lifting operations is one of the key processes in high-rise building construction. Several previous studies have used rough calculations by referring to existing practices or establishing a target value for lifting cycle time or operating rate. Therefore, the purpose of this study is to propose a material lifting process optimization method for reducing the lifting cycle time and increasing the operating rate. In this study, we improve the cyclic operation network (CYCLONE) modeling method that considers the duration and zone information of each work task. This method can be used to hand over work tasks to another crew group in the work process. According to this methodology, this study optimizes the material lifting process, performs a sensitivity analysis, and evaluates the field applicability of the proposed material lifting process optimization method. Therefore, the optimized process was then applied to a high-rise building construction site. The lifting work process time and operating rate for the simulated as - is lifting process data, optimized process data, and field application result data were compared for each lifting height. From this comparison, the effectiveness of the optimization methodology was confirmed.

Analysis on Inundation Impacts of Sea Level Rise Using System Dynamics-GIS Model (System Dynamics-GIS 모델을 이용한 해수면 상승 침수 영향 분석)

  • KIM, Ji-Sook;KIM, Ho-Yong;LEE, Sung-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.18 no.2
    • /
    • pp.92-104
    • /
    • 2015
  • In order to analyze the impacts of climate change, a time and space integrated model was developed in this study using system dynamics and GIS. The model built was used to carry out a simulation on the inundation impact on A-gu of Busan Metropolitan city resulting from the sea level rise scenario of IPCC and storm surge, which is the worst case. Through this, the flooded area and population until 2100 were predicted. Also, the result and significance of each alternative was reviewed improving the model by establishing alternative scenarios of protection, accommodation and retreat as plans of reaction to sea level rise. The combination of system dynamics and GIS has advantages of how the diverse variables change until the target year can be traced and, accordingly, not only the results but also the processes of spatial change can be examined by calculating the value of change process at each time step. The synergy of this model presumed to be a foothold for solving problems which are becoming difficult to predict due to increase in uncertainty and complexity such as the support for decision making for urban resilience to natural disasters.

Selecting the Optimal Research Time for Forest Birds Census in Each Season (산새류의 계절별 적정 조사시간 선정 연구)

  • Kim, Mi-Jeong;Lee, Soo-Dong;Kim, Ji-Suk
    • Korean Journal of Environment and Ecology
    • /
    • v.27 no.2
    • /
    • pp.219-229
    • /
    • 2013
  • This research is performed in order to suggest seasonal effective research time that is applied to wild birds research which lives in a forest. The subject area of this research is Mulgun-ri village forest in Samdong-Myeon, Namhe-gun. To investigate suitability of the project, existing land-use, existing vegetation, vegetational structure, and etc. of the subject and whole area are figured out. To suggest adequate research time, based on seasonal sun rise and set time for 3days, repetitive research is performed at hourly intervals. The subject area is connected with a forest and is possible for forest wild birds to flows in and provides various habitats and feeding areas. And also the subject area is a appropriate area for wild birds research and is like a natural forest in that a layer structure development of the forest itself, a distribution of Zelkova serrata and Aphananthe aspera and so on. 105 species which is observed in subject area are categorized and mountain birds are classified. After time-based peak value is selected in each season, hourly species richness, diversity, and index of similarity are analyzed as compared with the appearing number of species and individual bird. As a result, 7~11 hour is the most effective time in spring, and 8~9 hour is the best time. In summer, 6~9 hour is the most appropriate time when whole appearing species are similar to species structure. In fall, 7~11(30~60 minutes after sun rise) when wild birds movements are vigorous is analyzed easy to observe and 8~9 hour is the most appropriate research time because each analysis shows the best values. In winter, 7~12 hour is the most effective time although 10~11 hour is the best time but it is decided that similar results are drawn because hourly deviation is not so big except 1 hour before sun rise. In every four season, it is decided that 30~60 minutes after sun rise is appropriate to research a group of wild birds in the subject area.

Evaluation on Flotation Efficiency of Bubble-floc Agglomerates and Operation Characteristics of Hydraulic Loading Rate Using Population Balance in DAF Process (DAF공정에서 개체군 수지를 이용한 기포-플록 응집체의 부상효율과 수리학적 부하율의 운전특성 평가)

  • Kwak, Dong-Heui
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.5
    • /
    • pp.531-540
    • /
    • 2008
  • The main advantage of dissolved air flotation (DAF) in water treatment process is the small dimension compared with conventional gravity sedimentation and it can be basically reduced by the separation zone performed with the short solid-liquid separation time. Fine bubbles make such a short time possible to carry out solid from liquid separation as a collector on the course of water treatment. Therefore, the dimension of separation zone in DAF process is practically determined by the rise velocity of the bubble-floc agglomerates, which is a floc attached with several bubbles. To improve flotation velocity and particle removal efficiency in DAF process, many researchers have tried to attach bubbles as much as possible to flocs. Therefore, the maximum number of attached bubble on a floc and the rise velocity of bubble-floc agglomerates considered as the most important factor to design the separation zone of flotation tank in DAF process was simulated based on the population balance theory. According to the simulation results of this study, the size and volume concentration of bubble influenced on the possible number of attached bubble on a floc. The agglomerates attached with smaller bubble was more sensitive to hydraulic loading rate in the separation zone of DAF process. For the design of a high rate DAF process applied over surface loading 40 m/hr. it is required a precise further study on the variation of bubble property and behavior including in terms of bubble size distribution.

Wind induced internal pressure overshoot in buildings with opening

  • Guha, T.K.;Sharma, R.N.;Richards, P.J.
    • Wind and Structures
    • /
    • v.16 no.1
    • /
    • pp.1-23
    • /
    • 2013
  • The wind-induced transient response of internal pressure following the creation of a sudden dominant opening during the occurrence of high external pressure, in low-rise residential and industrial buildings was numerically investigated. The values of the ill-defined parameters namely the flow contraction coefficient, loss coefficient and the effective slug length were calibrated by matching the analytical response with the computational fluid dynamics predictions. The effect of a sudden i.e., "instantaneously created" windward opening in the Texas Technical University (TTU) test building envelope was studied for two different envelope flexibility-leakage combinations namely: (1) a quasi-statically flexible and non-porous envelope and (2) a quasi-statically flexible and porous envelope. The responses forced by creating the openings at different time leads/lags with respect to the occurrence of the peak external pressure showed that for cases where the openings are created in close temporal proximity to the peak pressure, the transient overshoot values of internal pressure could be higher than the peak values of internal pressure in the pre-sequent or subsequent resonant response. In addition, the influence of time taken for opening creation on the level of overshoot was also investigated for the TTU building for the two different envelope characteristics. Non-dimensional overshoot factors are presented for a variety of cavity volume-opening area combinations for (1) buildings with rigid/quasi-statically flexible non-porous envelope, and (2) buildings with rigid/quasi-statically flexible and porous envelope (representing most low rise residential and industrial buildings). While the factors appear slightly on the high side due to conservative assumptions made in the analysis, a careful consideration regarding the implication of the timing and magnitude of such overshoots during strong gusts, in relation to the steady state internal pressure response in cyclonic regions, is warranted.

Downtown Area Cadastral Boundary Surveying Using Real-time GPS/GLONASS Combination

  • Seo, Dong-Ju;Kim, Sung-Hwan;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.73-79
    • /
    • 2003
  • To manage national territory and cadastral data efficiently, accuracy and cost-efficiency in cadastral boundary surveying is inevitable. The efficient management of cadastral data is a very important element in national land management. Survey techniques are being introduced. Recently, improvements in survey techniques have been made with the development of satellite surveying, Allowing accurate and fast surveys. If we can calculate the output accurately in real-time in survey fields, it will open a new method in cadastral detail surveying. According to the classification on Law of cadastral surveying, Cadastral surveying can be divided into cadastral control point surveying and cadastral detail surveying. The control point survey can be divided into cadastral triangulation surveying and cadastral traverse surveying. The detailed survey is usually perform by plane surveying. Among these, cadastral detail surveying will be reviewed in this study. In this study, the combination of the satellites, such as US managed GPS and Russian managed GLONASS was used. In the satellite survey in downtown, data interruption symptoms arose(according to the mask angle of the satellite). Therefore; we combined the satellites to get date more accurately. A block of Haewoondae New City in Busan, Korea, which has Numerical Cadastral Law was selected as the sample area for this study. Block II and III are surrounded by high rise apartments. One side of Block I and IV is level ground and the other side is full of high rise apartments. Especially, Block II is surrounded by high rise apartment houses with 20 meters width. In the results of the study Block II did not satisfy the allowable precision, while Block I, II and IV satisfied the allowable precision of the enforcement regulations of Cadastral Law. Therefore, it is judged that the traditionally used Total Station method should be used for supplementary survey on Block II, in stead.

  • PDF

A Study on the Operating Characteristics of Molded Case Circuit Breakers according to Temperature Rise (온도상승에 따른 배선용 차단기의 동작특성에 관한 연구)

  • Jung, Da-Woon;Kim, Jae-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.8-13
    • /
    • 2015
  • Molded Case Circuit Breakers (MCCBs) are typically used to provide over current protection for electrical safety caused by short circuit faults and overloads in indoor low voltage power systems. The MCCB automatically connects and disconnects loads from the electrical source when the current reaches a value and duration that will cause an excessive. However, the MCCB sometimes is not interrupted due to a malfunction, nuisance tripping, or in a fire. Ensuring electrical safety is very important in a indoor low voltage power system. This paper presents the operating characteristics of MCCBs according to a temperature rise from room temperature to 160 degrees Celsius delivered by a radiant panel heater. The ABS 54c(rated current: 30A) of the hydraulic magnetic trip type was used in the experiments. The signals of temperature, voltage, and current were measured using the high accuracy Signal Conditioning Extensions for Instrumentation (SCXI) measurement system with the LabVIEW program manufactured by National Instruments. The operating characteristics were measured as functions of current amplitude and ramp-up rate. The MCCB tripping time decreased as a result of increasing current amplitude and ramp-up rate under a temperature rise condition, because the temperature and level of the current are directly proportional to the tripping time. Additionally, an instantaneous operation was observed after 8 times of the rated current, and the MCCB began to melt a surface temperature of around 300 degrees Celsius of. The experimental results coincided well with the operating curve.

Design and Fabrication of a Surge Impedance Meter (서지임피던스 측정기의 설계 및 제작)

  • Kil, Gyung-Suk;Rhyu, Keel-Soo;Kim, Il-Kwon;Moon, Byung-Doo;Kim, Hwang-Kuk;Park, Chan-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.645-649
    • /
    • 2007
  • Ground systems flow fault currents into the ground, and suppress Ground Potential Rise (GPR) by the current. In this paper, we designed and fabricated a surge impedance meter to analyze the ground impedance in wide frequency ranges. The meter consists of a surge generator, a high speed sample/hold (S/H) circuit and an associated electronics. The surge generator produces surge voltage up to 5kV in ranges of $50\sim500ns$. Field tests were carried out to evaluate the surge impedance meter at a driven-rod ground system. The results showed that surge impedance of ground systems should be measured by various fast surge waveforms, since the impedance increases as the rise time of applied voltage increases.

Efficient Three Dimensional Analysis of High-Rise Shear Wall Building with Openings (개구부가 있는 고층 벽식 구조물의 효율적인 3차원 해석)

  • 김현수;남궁계홍;이동근
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.15 no.2
    • /
    • pp.351-365
    • /
    • 2002
  • The box system that is composed only of reinforced concrete walls and slabs we adopted on many high-rise apartment buildings recently constructed in Korea. And the framed structure with shear wall core that can effectively resist horizontal forces is frequently adopted for the structural system for high-rise building structures. In these structures, a shear wall may have one or more openings for functional reasons. It is necessary to use subdivided finite elements for accurate analysis of the shear wall with openings. But it would take significant amount of computational time and memory if the entire building structure is subdivided into a finer mesh. An efficient analysis method that can be used regardless of the number, size and location of openings is proposed in this study. The analysis method uses super element, substructure, matrix condensation technique and fictitious beam technique. Three-dimensional analyses of the box system and the framed structure with shear wall core having various types of openings were performed to verify the efficiency of the proposed method. It was confirmed that the proposed method have outstanding accuracy with drastically reduced time and computer memory from the analyses of example structures.

Models for Predicting Hoisting Times of Tower Crane in the High-rise Building Construction (고층건축공사 타워크레인 양중시간 예측모델)

  • Lee Jong-Ryou;Jeon Yong-Seok;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.472-475
    • /
    • 2004
  • The objective of this study is to develope reasonably accurate prediction models to assess hoisting times of tower cranes in the high-rise building construction. The efficient use of the tower crane is critical to achieving the Planned floor cycle time. This research describes the derivation of mathematical models to predict the hoisting times in using a tower crane. 28 factors such as nature of load, characteristics of tower cranes, hoisting movements, operation of cranes, weather conditions and so on is considered to influence hoisting times. In order to develop the predicting hoisting times Correctly, it is divided hoisting upward and downward. Then multiple regression models for predicting supply and return hoisting times have been built up separately.