Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (NATM 터널의 대심도 풍화대층에서의 지반거동 및 보강방법)

  • Sung, Hwa-Don;An, Jung-Whan;Chun, Byung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1782-1788
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analysis of failure rate and vertical stress ratio show that the tunnel for which the height of the cover(H) was higher than four times the diameter, it can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods were showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than where using Ring-cut split method. In addition the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

  • PDF

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법)

  • Chun, Byung-Sik;Song, Seung-Hoon;An, Jung-Whan
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.87-95
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analyses of failure rate and vertical stress ratio show that the tunnel for which the height of the cover (H) was higher than four times the diameter, can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than that obtained by Ring-cut split method. In addition, the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

A Study on the Quantitative Evaluation of the Load Distribution Factors Considering the Design Conditions of Tunnel Especially for the Ring-cut Excavation Method (터널 설계조건을 고려한 하중분배율의 정량적 산정에 관한 연구 -ring-cut 굴착공법을 중심으로-)

  • 장석부;문현구
    • Geotechnical Engineering
    • /
    • v.14 no.5
    • /
    • pp.5-16
    • /
    • 1998
  • 2-D numerical methods have been applied to analyze the stability of tunnels because of computation efficiency, though the ground around the tunnel under construction shows 3-D reformational behaviour due to the transverse and longitudinal arching effects. Load distribution factors are introduced to the 2-D analysis for the consideration of the effects of the tunnel advance in three dimensions. The load distribution factors influence significantly the ground deformation and the load of primary supports like shotcrete and rockbolts. According to the previous studies for 3-D numerical studies. it was shown that load distribution factors were heavily dependent on the ground deformational properties, tunnel size and the advance length of a tunnel. However, as the quantitative methods evaluating the factors have not been presented yet, constant values have been assigned to the factors for 2-D analysis even if the conditions for tunnel design are different. Accordingly, this paper presents the method to evaluate quantitatively the load distribution factors through the regression analysis of 3-D analysis data on 72 design cases. Also, new modification to the load distribution factors are suggested for the ring-cut excavation method because the conventional 2-D analysis is not able to consider the support effects of the core left on the tunnel face.

  • PDF

An experimental study for the effect of soil plug on the basal heave stability for the vertical shaft excavation in clay (점성토 지반 수직구 굴착 중 히빙 안정성 증가에 대한 관내토 효과에 대한 실험적 연구)

  • Kang, Seok-Jun;Cho, Gye-Chun;Kim, Jung-Tae;Cha, Yohan;Hong, Eun-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.183-195
    • /
    • 2018
  • Recently, the need for research on vertical shaft excavation is increasing with the increase of the demands for the underground and utility tunnels. As a part of the R&D project of the Ministry of Land, Infrastructure and Transport, CUT (center for utility tunnel) has developed "Ring cut method". "Ring cut method" is a method to improve the stability of the ground against the basal heave by excavator wall pre-penetration during vertical shaft excavation. In this study, the basal heave was simulated by centrifugal model test. The basal heave, ground subsidence, and ground deformation of surrounding ground were analyzed by soil plug effect from wall pre-penetration. It was found that the soil plug could control the basal heaving and ground subsidence, and verified that the 'Ring cut method' could be a good countermeasure for the ground stability against the basal heave.

Stability Evaluation for a riverbed tunnel in the Han River at the Fault Zone Crossing (한강 단층대를 통과하는 하저터널의 안정성 확보에 관한 연구)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.225-231
    • /
    • 2001
  • When building tunnels beneath riverbeds where very large quantities of groundwater inflow exist, added to high water head the soil supporting conditions are very poor because the soil consists of sand and silt, etc. It is necessary to have grouting and mini pipe roof installed in the region for ground reinforcement to decrease permeability. According to this result of horizontal boring and laboratory soil testing, ground reinforcement was achieved by L.W grouting for range of 3.0 times the tunnel radius, to increase stability of the tunnel we used the ling-cut method, 0.8m for one step excavation, shotcrete with 25cm thick, steel lib with H-$125{\times}125$. and a temporary shotcrete invert 20cm thick was installed to prevent deformation of the tunnel.

  • PDF

Re-conservation of the Iron Sword with Ring Pommel with Three-Pointed Leaf Decoration Excavated from Tomb No. 55 at the Dalseong Ancient Tomb Complex in Daegu and a Study of Its Production Method (대구 달성 55호분 출토 삼엽문이자태도의 재보존처리와 제작 기법 연구)

  • Lee, Huisung;Huh, Ilkwon;Ro, Jihyun;Park, Seungwon
    • Conservation Science in Museum
    • /
    • v.24
    • /
    • pp.1-16
    • /
    • 2020
  • This paper presents the process of re-conservation and the results of research on the production method of the Iron Sword with Ring Pommel with Three-Pointed Leaf Decoration, one of the excavation findings from Tomb No. 55 in the Dalseong Ancient Tomb Complex in Daegu. This iron sword is a double weapon with two large swords housed within a single sheath. Four smaller swords are attached to the surface of the sheath, two on the upper portion and the other two below. It is the only such two-in-one weapon excavated intact thus far from an ancient Korean tomb. The records show that it underwent conservation treatment twice in the past. In this study, it was subjected to conservation treatment again to replace the stiffener in some cracking areas, and its material, composition, and production method were analyzed by CT, XRF analysis, and stereoscopic microscopy. The sword is mainly made of copper, but the golden component contains both gold and mercury, which suggests that the copper was plated in gold using mercury amalgamation. The examination of the production methods indicates that it was intended more to demonstrate the authority of its owner rather than to serve any practical use. The two upper small swords on the sheath were made in the same manner as the main swords, and the two small lower swords were cut from a single metal sheet. The sheath was made by cutting two metal sheets. Supports were used to attach the two small swords to the upper portion of the sheath, while the lower portion of the sheath was slit to allow the other two small swords to be inserted into it. The ring pommels of the main swords have a three-pointed leaf decoration. As for the other designs, the handle of the main sword features a series of semicircles, the decorative bands on the sheath have waves in dots, and the fish tail of the sheath shows diagonal lines of dots.