The Journal of Economics, Marketing and Management
/
v.9
no.5
/
pp.15-25
/
2021
Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.
Nallathiga, Ramakrishna;Shaikh, Haris D;Shaikh, Tauseef F;Sheik, Farhan A
Journal of Construction Engineering and Project Management
/
v.7
no.4
/
pp.1-12
/
2017
India has accorded a high priority to road infrastructure development through Public-Private Partnership (PPP) and it has set a high target for investment inflows. Yet, it is widely held that road/highway infrastructure has not been developing at required pace and that the road infrastructure projects under PPP have been suffering from several hurdles and delays, thereby affecting project success/failure. This paper is an attempt to analyze the critical success/failure factors of road infrastructure projects under PPP in India. A questionnaire survey was conducted among a sample of the stakeholders of road infrastructure projects to identify the critical success/failure factors during all four major project stages using different approaches. Initially, the critical factors were identified through ranking based on the average/mean score. Later, the conventional RII score was used to identify the critical success/failure factors. Finally, the critical success/failure factors were also identified based on the stakeholder-wise ranking of the factors and their convergence. The assessment revealed that there was a greater convergence across the different methods and also that there was greater consensus among project stakeholder on the critical success/failure factors of road PPP projects.
Journal of the Korean Institute of Rural Architecture
/
v.8
no.3
/
pp.17-26
/
2006
As demands and interests in visiting rural village increases, government authorities are promoting eco and green tour village development project through plural functions of rural village. The purpose of this study is to understand infrastructure improvement direction by researching the case study of general rural villages' changing to eco and green tourism villages. As for the research method, the character of each village was verified, then the case studies of improvement by life infrastructure using the identity of villages were analyzed. Finally, it was found that infrastructure through public facilities improvement and environment improvement project was expanded and relaxative and experiential space was offered by creating tour infrastructure using the identity of villages. Also, it was shown that farming infrastructure creating project was executed to promote the income base of locals.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.322-325
/
2006
The research project evaluates different infrastructure project delivery methods used internationally. The goal is to define the main benefits, deficiencies, and requirements of the project delivery systems for both the short term and long term perspectives. Also, the research attempts to determine alternatives to modify and to promote change in the current infrastructure project delivery methods in order to make the processes more efficient with value added benefits to all participants.
This research aims to find the issues and explore policy agenda of contributed acceptance of urban renewal project. Through the analysis of urban renewal project in Seoul, three isssues was found as follows. Firstly, the ratio of contributed acceptance in each district was quite different. Secondly, the donated land was scattered around whole project area. Thirdly, infrastructures are not constructed until all renewal projects were implemented. For this issues, this research proposed that a proper standard of the ratio of contributed acceptance is needed and land donation should be designated to adjacent lot or block. Also public support should be for developing urban capacity and completing infrastructure.
Several research projects funded by National GIS Master Plan have started to produce several outcomes that need to be applied in the real world situation. To make the project results more useful and to improve upon the current results, it is necessary to integrate the project outcomes produced under various circumstances into a consistent and coherent structure.
International conference on construction engineering and project management
/
2007.03a
/
pp.509-519
/
2007
Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.
International conference on construction engineering and project management
/
2022.06a
/
pp.83-90
/
2022
Public-private partnerships (PPP) projects are becoming popular in both developed and developing countries due to their ability to access new financing sources and transfer certain project risks to the private sector. PPP has been an active research area where the concept of Critical Success Factors (CSF) is often discussed by researchers. This study aims to identify the CSFs for various PPP infrastructure projects that have been explored in previous CSF studies. This article reviewed the literature about CSF in PPP projects from the years 2002 to 2021, compared the findings of studies regarding the identified CSFs, and consolidated the CSFs that can be applied to various PPP infrastructure projects. The results showed that dominant research focused on general infrastructure, where CSFs can be applied to all infrastructure sectors rather than any specific sector. The most identified CSFs from the study are favorable and efficient legal frameworks, appropriate risk allocation and sharing, a robust and reliable private consortium, a competitive and transparent procurement process, and political support and stability. The findings from the study can provide an overview of CSFs that are relevant to specific PPP infrastructure sectors like building infrastructure, transportation, water, etc. as well as for general infrastructure. In addition, the results can also be used for further empirical analysis.
International Journal of Internet, Broadcasting and Communication
/
v.16
no.3
/
pp.274-280
/
2024
The smart factory promotion project is a project that improves the entire management environment system, including the production process, using ICT technology. According to the 2019 Smart Factory Survey and Analysis Research Report of the Ministry of SMEs and Startups, small and medium-sized enterprises that introduced smart factories reported positive effects such as increased productivity, improved quality, and reduced costs on average. On the other hand, the survey results of companies that promoted the project despite positive results showed that there was room for improvement. This study dealt with the contents of the survey conducted on companies by the smart factory promotion agency in 2020 regarding the infrastructure configuration for promoting smart factories. We examined the meaningful contents implied by the data related to the infrastructure configuration. These meaningful survey results can lead to more efficient business promotion in the future when promoting smart factory projects.
Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
International conference on construction engineering and project management
/
2011.02a
/
pp.474-479
/
2011
With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.