• Title/Summary/Keyword: Requirements Management System

Search Result 1,637, Processing Time 0.029 seconds

Development of Airworthiness Database System with Validation Process for Design Programs of General Aviation Aircraft

  • Lwin, Tun;Lee, Jae Woo;Kim, Sangho;Lee, Hyojin
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.13 no.4
    • /
    • pp.435-445
    • /
    • 2012
  • In this paper, a design process is established by integrating aviation safety requirements for the development of general aviation aircraft. An Airworthiness-Design Integration System, which integrates certification requirements with the entire design/analysis process, is developed and presented. For the proposed system, KAS 23/FAR 23/AC 23/CS 23 certification regulations are analyzed to determine design constraints and system compliance checks and to construct an ER&G (Engineering Requirement and Guide) and a Design-Certification Related Table (DCRT). Furthermore, through building a DB (Data Base), the management of design and certification related resources for developing a FAR 23 class aircraft are made. Certification tools and resources are also efficiently managed by the DB. The connection between the certification requirements and the detailed design process is proposed in this system. Tracking of this proposed method is validated by configuring a USE CASE and a system. The Airworthiness-Design Integration system will be constructed based on the system's design plan, certification system, and usage scenarios.

Development of Managing Security Services System Protection Profile (보안관제시스템 보호프로파일 개발)

  • Son, Seung-Wan;Kim, Kwang-Seok;Choi, Jung-Won;Lee, Gang-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.2
    • /
    • pp.345-353
    • /
    • 2015
  • Security Management System is a system which operates in the security control center for security control. All living things across the Internet in recent years, with the rapid increase in the subscriber base has increased the need for network security dramatically depending on yirueojim through web services, thus cyber security sheriff, I have a big issue to build a security management system, each agency and perform control tasks. But the security functional requirements for security management system would not specified exactly, in developing a security management system to build and design a situation that PP's needs require a lot of trouble. In this paper, we develop a Managed Security System Protection Profile for the security functional requirements specification of the security management system.

A Study on Functional Requirements of Records Management Systems for Government-Affiliated Organizations to respond to Immediate Disclosure of Original Official Documents (체계적인 원문정보공개를 위한 정부산하공공기관 기록관리시스템 기능요건 연구)

  • Hwang, Jin-hyun;Yim, Jin-hee
    • The Korean Journal of Archival Studies
    • /
    • no.46
    • /
    • pp.325-363
    • /
    • 2015
  • The object of this study is to help the government-affiliated public institutions, which are ahead of the Immediate Disclosure of Original Official Documents in 2016, to conduct a systematic disclosure of the original official documents on the basis of records management. As of now, many government-affiliated public institutions are facing difficulties in systematically conducting the immediate disclosure of original official documents as they lack specialists in records managements, let alone a system for carrying out the procedures. In this situation, the study induces insights on this matter by inspecting former cases of the Ministry of Government Administration and Home Affairs, and of Seoul Metropolitan Government. Moreover, the study examines the examples of three government-affiliated public institutions, which are establishing a records management system to better cope with the immediate disclosure of original official documents. The institutions are in the beginning stages of building up a system for records management and immediate disclosure of original official documents. Therefore, the characteristics of these institutions must be considered in working out the strategy for immediate disclosure of original official documents. For this reason, this study reflected the attributes of each institute in establishing a self-developed records management system; in which, the disclosure of original documents based on registrars and records management system is made possible. This study also suggests functional requirements that must be included in coping with the immediate disclosure of original official documents.

A Development and Evaluation of Nursing KMS using QFD in Outpatient Departments (품질기능전개(Quality Function Deployment)를 활용한 외래 간호지식경영 시스템의 개발과 평가)

  • Lee, Han Na;Yun, Eun Kyoung
    • Journal of Korean Academy of Nursing
    • /
    • v.44 no.1
    • /
    • pp.64-74
    • /
    • 2014
  • Purpose: This study was done to develop and implement the Nursing KMS (knowledge management system) in order to improve knowledge sharing and creation among clinical nurses in outpatient departments. Methods: This study was a methodological research using the 'System Development Life Cycle': consisting of planning, analyzing, design, implementation, and evaluation. Quality Function Deployment (QFD) was applied to establish nurse requirements and to identify important design requirements. Participants were 32 nurses and for evaluation data were collected pre and post intervention at K Hospital in Seoul, a tertiary hospital with over 1,000 beds. Results: The Nursing KMS was built using a Linux-based operating system, Oracle DBMS, and Java 1.6 web programming tools. The system was implemented as a sub-system of the hospital information system. There was statistically significant differences in the sharing of knowledge but creating of knowledge was no statistically meaningful difference observed. In terms of satisfaction with the system, system efficiency ranked first followed by system convenience, information suitability and information usefulness. Conclusion: The results indicate that the use of Nursing KMS increases nurses' knowledge sharing and can contribute to increased quality of nursing knowledge and provide more opportunities for nurses to gain expertise from knowledge shared among nurses.

Automated Prioritization of Construction Project Requirements using Machine Learning and Fuzzy Logic System

  • Hassan, Fahad ul;Le, Tuyen;Le, Chau;Shrestha, K. Joseph
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.304-311
    • /
    • 2022
  • Construction inspection is a crucial stage that ensures that all contractual requirements of a construction project are verified. The construction inspection capabilities among state highway agencies have been greatly affected due to budget reduction. As a result, efficient inspection practices such as risk-based inspection are required to optimize the use of limited resources without compromising inspection quality. Automated prioritization of textual requirements according to their criticality would be extremely helpful since contractual requirements are typically presented in an unstructured natural language in voluminous text documents. The current study introduces a novel model for predicting the risk level of requirements using machine learning (ML) algorithms. The ML algorithms tested in this study included naïve Bayes, support vector machines, logistic regression, and random forest. The training data includes sequences of requirement texts which were labeled with risk levels (such as very low, low, medium, high, very high) using the fuzzy logic systems. The fuzzy model treats the three risk factors (severity, probability, detectability) as fuzzy input variables, and implements the fuzzy inference rules to determine the labels of requirements. The performance of the model was examined on labeled dataset created by fuzzy inference rules and three different membership functions. The developed requirement risk prediction model yielded a precision, recall, and f-score of 78.18%, 77.75%, and 75.82%, respectively. The proposed model is expected to provide construction inspectors with a means for the automated prioritization of voluminous requirements by their importance, thus help to maximize the effectiveness of inspection activities under resource constraints.

  • PDF

Multi-Criteria Decision-Making Model Using Quality Function Deployment (QFD) Method for the Most Suitable Temporary Earth Retaining System

  • Jung, Bae Yu;Byung, Cho Han;Jin, Han Sang;Won, Kwon;Ho, Jo Jae;Youl, Chun Jae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.620-621
    • /
    • 2015
  • In this study, the multi-criteria decision-making model based on Quality Function Deployment Method is proposed. Multicriteria decision-making is an attempt to link QFD method with the TOPSIS. By this effort, a model that makes client's decision-making more rational and objective in design phase is suggested. The multi-criteria decisionmaking model confirming to the Owner's requirements will improve the productivity of the construction industry and the satisfaction of the customer. Further study extending the range of the requirements, not only the Owner's requirement will be necessary to cover the various factors as much as possible. And then, finally as a flexible platform to achieve a sustainable quality management, web-based multi-criteria decision-making model can be utilized by the relevant stakeholders simultaneously with the feed-back and sharing the necessary informations.

  • PDF

A Study on the Link between the Severe Accident Punishment Act and ISO 45001 of SMEs (중소기업의 「중대재해처벌법」과 ISO 45001의 연계방안 연구)

  • Woo, Sang-Sun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.333-342
    • /
    • 2022
  • Purpose: This study proposes a plan for linking the Severe Accident Punishment Act and the Occupational Health and Safety Management System so that SMEs can meet the requirements of the Severe Accident Punishment Act only by maintaining and implementing the Occupational Health and Safety Management System. Method: Conduct a theoretical approach, such as a literature review. First, as a theoretical approach, the safety and health management system of the Serious Accidents Punishment Act was examined, the requirements of ISO 45001 were analyzed, and the statistics of small and medium-sized enterprises (SMEs) from 5 to 49 to which the 2024 Serious Accidents Punishment Act was applied and the number of accident deaths were investigated. Result: No problems were found in linking with the Serious Accident Punishment Act when constructing Occupational health and safety management systems (ISO 45001). Conclusion: It is judged that the establishment of Occupational health and safety management systems (ISO 45001) and management of implementation performance will be able to satisfy the Act on the Punishment of Serious Disasters.

A QoS Prediction Management System in Distributed Multimedia Networks

  • Ueno, Yoshito
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 1996.06b
    • /
    • pp.95-100
    • /
    • 1996
  • User's qualities of services (QoS) are the basic requirements involved in distributed multimedia systems. Considering ATM network, ATM adapter cannot control the end-to-end connection satisfying the user's QoS. This paper describes the new concept of a QoS prediction management system in the distributed network and the configuration of it's QoS prediction management architecture and also discusses it's algorithm.

  • PDF

A Study on Publishing Distribution System Application for RFID System (출판유통 RFID 적용에 관한 연구)

  • 안종윤;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.6 no.1
    • /
    • pp.125-133
    • /
    • 2004
  • Greeting the globalization and information period of 21C, the improvement of the distributional system structure and modernization of publishing distribution are the seriously required periodic assignments for the publishing industry that is a national knowledge and culture industry to be equipped with the core competitiveness. First, it is to found a large distributional organization that is able to provide total logistics services in time that is essential to the publishing company and bookstore. Second, it is to have a logistics service to act up to the variable requirements of customers such as publishing companies and bookstores under the rapidly changing distribution environment. Third, it is to provide the standardized information of publishing distribution. It is needed to establish a total distributional center in collaboration to satisfy the requirements of publishing industry as above. By doing this work, structure of the publishing distribution system can be improved and its constitution can be strengthen, and it is possible not only to construct a stable supply system but also to realize an information-based system in the publishing industry with the construction of information system and its utilization. Furthermore, the application of RFID in the publishing distribution is essentially required to provide the symbolic model and logistics infrastructure into the 'Paju publishing culture information industrial complex'. It could be possible by growing the international recognition regarding distribution environment and strengthening the international competitiveness in the period of the ""Open door".

On the Project Management utilizing the Systems Engineering Management Plan in the Railroad Safety Technology R&D Program (철도종합안전기술개발사업에서 SEMP의 활용을 통한 프로젝트 관리방안)

  • Kim, Jae-Chul;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Am;Han, Soon-Woo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1798-1805
    • /
    • 2010
  • The Railroad Safety Technology R&D Program has been supported by the Ministry of Land, Transport and Maritime Affairs. The Program consists of dozen or more projects and thus is quite complex, which requires effective project management. This paper is discussing how to effectively manage the railroad safety technology R&D program based on systems engineering management plan (SEMP). The key issues dealt in this paper include the SE management, requirements management, verification and validation, integrated data base management, and traceability management. To achieve the goal, we first defined an appropriate SE process to be adopted in the program and the result was documented in the systems engineering management plan. According to the process defined, we set up the environmental frame in database. Using the database and SEMP, each project of the program was verified with respect to the corresponding requirements utilizing the traceability. All these efforts were carried out using a computer-aided SE tool, which enables efficient management of complex database.

  • PDF