• Title/Summary/Keyword: Requirements Management System

Search Result 1,637, Processing Time 0.029 seconds

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.13 no.1
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

A Fundamental Concept of Risk-Based Thinking and Risk Management for ISO 9001:2015 Certification (ISO 9001:2015 인증을 위한 리스크 기반 사고의 개념과 리스크 관리)

  • Kim, Ho Gyun;Kang, Byung Hwan;Park, Dong Joon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.3
    • /
    • pp.38-48
    • /
    • 2017
  • ISO 9001 Quality Management Systems-Requirements has been revised in 2015. It has been updated four times since its publication in 1987. It is the most widely used International Standard in the world. There are over one million companies and organizations in over 170 countries certified to ISO 9001 from an ISO survey. Organizations are supposed to be certified to this new version by late 2018. The key changes in ISO 9001:2015 are to establish a High Level Structure (HLS) and focus on Risk-Based Thinking (RBT). Risk-Based Thinking means the process approach to decide how risk is addressed in establishing the processes to improve process outputs and prevent undesirable results. It pursues process planning and controls based on risks so that organizations can improve the effectiveness of the quality management system. It maintains and manages a Quality Management System that inherently addresses risks and meets objectives. In this article we firstly attempt to explain how to understand the fundamental concept of Risk-Based Thinking which is a systematic approach to consider risks rather than treating prevention as a separate component of a Quality Management System. We comment on the detailed requirements that contain risks in ISO 9001:2015 clauses. We also summarize recent advances on the risk assessment and management in line with ISO 31000:2009 Risk Management-Principles and Guidelines. We finally propose the practical risk management procedures for implementing ISO 9001:2015 with an emphasis on RBT. This article would contribute to help quality managers and practitioners convert to ISO 9001:2015.

Development of a Multi-Layered Workflow Management System for Product Development Processes (제품 개발 프로세스 관리를 위한 다층 통합 워크플로우 시스템 개발)

  • 강석호;김영호;김동수;배준수;배혜림
    • Korean Management Science Review
    • /
    • v.16 no.1
    • /
    • pp.187-201
    • /
    • 1999
  • In this paper, we propose a multi-layered architecture of workflow management systems based on CORBA (Common Object Request Broker Architecture). The system aims to support product development processes in distributed environment. Many companies have started to adopt workflow management systems to manage and support their business processes. However, there are many problems in direct application of those systems to product development environments. These mainly resulted from the dynamic features of product development processes. It is strongly required to support dynamic processes as well as static and procedural ones in an integrated and consistent manner. To meet these requirements, a basic workflow management system has been developed as the core component of the integrated architecture. This performs the basic functions of workflow management system. Second, a dynamic workflow management system based on a bidding mechanism has been developed to manage processes that cannot be easily defined or are likely to be modified, Finally, an SGML workflow management system, which is the third layer in the architecture, has been developed to manage documents processing workflows by integration SGML documents contents and process information into the structured SGML document.

  • PDF

A Study on the Link between the Serious Accidents Punishment Act and the Enterprise Disaster Management Standard: Focused on the Serious Industrial Accidents (중대재해처벌법과 재해경감활동관리체계 연계방안 연구 - 중대산업재해 중심)

  • Lee, Byoung-Lim;Kim, Sang-Duk;Choi, Jae-Wook
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.3
    • /
    • pp.660-671
    • /
    • 2022
  • Purpose: This study is intended to confirm the business disruptive risk in the Serious Accidents, and propose a plan to comply with the Serious Accidents Punishment Act through the Disaster Mitigation Activity Management System. Method: Through literature review and case studies, the requirements and characteristics of each of the Serious Accidents Punishment Act, the Disaster Mitigation Activity Management System, and ISO 45001 were compared and analyzed, and implications were derived. Result: The business disruption and financial adverse effects caused by industrial accidents were identified. Based on this and by using the Disaster Mitigation Activity Management System, measures to link the documentation requirements of the the Serious Accidents Punishment Act to the Disaster Mitigation Activity Management System, and to manage the implementation records of the Serious Accidents Punishment Act's duty were derived. Conclusion: When establishing and operating the Disaster Mitigation Activity Management System, it can not only comply with the Serious Accidents Punishment Act but also contribute to maintaining business continuity and ESG management through the prevention of various disasters and the minimization of secondary damage, etc.

Developing a Real-time Cashflow Management System for National R&D Management (국가 연구 개발 프로젝트 실시간 자금 관리 시스템 개발에 관한 연구)

  • Han, Seung-Youp;Lee, Hyejung;Lee, Jungwoo
    • Journal of Information Technology Services
    • /
    • v.13 no.3
    • /
    • pp.343-357
    • /
    • 2014
  • As science and technology infiltrates every aspects of modern society in terms of economic and social growth and development, funding for research and development (R&D) is growing rapidly. Republic of Korea is not an exception in this trend and the R&D funding in Korea has been grown about 10% every year, recently. However, as the scope and size of funding grows exponentially, need for monitoring and managing these R&D projects becoming more and more imminent. Though different types of project management systems were developed by a variety of agencies and departments and used in monitoring and managing, these systems were developed as standalone silo type systems. These systems are not connected to each other while the same researchers may involved in different projects across agencies and department. Also, these management systems are not linked to the banking systems in which real transactions of funding occurs, such as cost reimbursement and financial audit of each R&D accounts. Historically, a few fraud and malappropriation cases were found and indicted. However, as the number of these incidents grows along with the growth of R&D funding, a large scale integration/linking of project management systems and banking systems. Realizing the importance of systems integration among agencies as well as with the banking systems, situational requirements analyses were conducted concerning the current state of R&D management system. As a results, a Real-time Case Management System (RCMS) was proposed as a solution to current problems. In this paper, the collected systems requirements were documents with analyses of the situation, the architecture of the integrated systems with more user-friendly technological alternatives. This large scale linkage requires interface standardization as well as modularization of interfaces. Proposed systems architecture is introduced here with technical details of Jex Framework used,, followed by resulting technical and economic performance of the Realtime Cashflow Management System (RCMS).

Design of the Procurement Engineering Support System : A Case Study (구매엔지니어링 관리지원시스템 상세 설계 사례 연구)

  • Kim, Jinil;Yeom, Choongsub;Shin, Joonguk;Salim, Shelly
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.2
    • /
    • pp.33-40
    • /
    • 2018
  • This paper is based on the interim result of ongoing research and development project to develop a software system which support procurement activities, namely PeMSS (Procurement Engineering Management Support System). PeMSS is a system that enables development requirements for each equipment and help designing equipment meeting the purchase requirements. Procurement at EPC (Engineering Procurement and Construction) and operational stage of a plant is an important area that determines the integrity and profitability of the plant. Procurement of unsuitable equipment due to selection of suppliers that do not meet or omit critical requirements in purchase specification can result in enormous cost increase due to such as delay in EPC project, unsatisfactory performance and reduced plant operation time. In spite of the importance of the procurement engineering, there is a lack of support system for systematic preparation of purchase specification, so development of the procurement specification is basically relying on the experience of the engineers in charge. Accordingly, it is needed to develop the PeMSS to help procurement engineers develop procurement specification based on systems engineering approach. This paper introduces the design of the PeMSS.

A study on application plan of access control requirements in ERMS Standard (ERMS 표준에 나타난 접근통제 요건의 적용방안에 관한 연구)

  • Cheon, Kwon-Ju
    • The Korean Journal of Archival Studies
    • /
    • no.18
    • /
    • pp.179-220
    • /
    • 2008
  • Under the physical records management system, both the records and users could be controlled and secured by closing the door of Archives or using permitted records which is used only approved users. According to the electronic records management system and the concept of service on the basis of users, we have to give up the classical manner. As an alternative, we have to consider the electronic access control system. To accomplish this purpose, functional requirements of ERMS that is issued by UK, EU, U.S and Australia must be compared and analyzed. On the basis of U.K ERMS which is more detailed, 'common access control functional requirements' are arranged. As the access control functional requirements is applied in the records classification scheme, we could find out how the access control is executed in ERMS.

Strategies for Information Requirements Analysis for Agricultural Management Information System Developments (농업 정보 시스템 개발을 위한 정보 요구 분석 전략)

  • Choe, Young-Chan;Moon, Jung-Hoon
    • Journal of Agricultural Extension & Community Development
    • /
    • v.10 no.1
    • /
    • pp.1-14
    • /
    • 2003
  • This study proposes strategies for information requirements analysis (IRA) for successful agricultural management information system (MIS) development. The study frist defines IRA based on literature review and emphasizes the importance of IRA by its position in SDLC (System Developments Life Cycle). Then, the study reviews fifteen cases of agricultural MIS development projects appeared in the report of all the MIS related ARPC(Agricultural R&D Promotion Center) projects from 1995 to 1998 and finds that IRA is not properly performed in most of the projects. Finally, this study proposes seven strategies for IRA for successful agricultural MIS development based on the finding of this study and those from the literature related to IRA methods.

  • PDF

An Establishment of the Process System for Software Requirements Engineering (소프트웨어 요구공학에 대한 처리 시스템 정립)

  • Lee, Sang-Un;Choi, Myeong-Bok
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.1
    • /
    • pp.37-49
    • /
    • 2014
  • This paper proposes a optimal process after analyzing the existing papers of software requirements engineering process. In analyzing it examines requirement pursuit management and origin, and considers a variety of starting points that draw requirement documents. Also, this paper considers carefully the multiple methods of stakeholder needs, problem analysis, processing priority of business modeling. From the analyzed result this paper proposes the best method that draws systematically the requirement documents. The proposed method can minimize the requirement changes, draw the higher project success ratio, and satisfy the customer.

A study on the strategy of concerned parties with regard to the performance standards and implementation schedule of ballast water treatment systems (평형수처리장치 성능기준 및 시행시기 차이에 의한 관련 당사자들의 대응전략 연구)

  • Kim, Kyong-Min;Kim, Hoi-Jun;Ha, Weon-Jae
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.3
    • /
    • pp.325-332
    • /
    • 2014
  • In installing ballast water treatment system, the cost of the system is high and many technical aspects are to be considered and also it takes significant time to retro-fitting on the existing ships. In addition, in the current circumstance which the Ballast Water Management Convention has not been entered into force, the 28th IMO Assembly adopted a resolution to mediate the implementation schedule of the treatment systems. In the mean time, California State and New York State have declared more stringent discharge requirements of ballast water and are planning to implement them earlier than the schedule of the Convention. In these circumstances, the implication in the difference between ballast water treatment system manufacturers and ship owners need to be considered. In this study, through the review on the considerations when installing the system onboard, stringent requirements of United States of America, and determent or mediated implementation schedules of Convention and California and New York States, the author would like to suggest the strategy of concerned parties for anticipated entrry into force of the Convention and implementation of the stringent requirements of United States of America.