• 제목/요약/키워드: Repair Cost

검색결과 693건 처리시간 0.027초

신소재 복합재료를 이용한 비굴착 지하매설관 보수-보강공법 (Trenchless Repairing-Reinforcing Process of Underground Pipes with Advanced Composite Materials)

  • 진우석;권재욱;이대길;유애권
    • 한국복합재료학회:학술대회논문집
    • /
    • 한국복합재료학회 2001년도 추계학술발표대회 논문집
    • /
    • pp.43-48
    • /
    • 2001
  • To overcome the disadvantages of conventional excavation technology, various trenchless (or excavation free, or no-dig) repair-reinforcement technologies have been developed and tried. But trenchless technologies so fat developed have some brawbacks such as high cost and inconvenience of operation. In this study, a repairing-reinforcing process for underground pipes with glass fiber fabric polymer composites using VARTM(Vacuum Assisted Resin Transfer Molding) has been developed. The developed process requires shorter operation time and lower cost with smaller and simpler operating equipments than those of the conventional trenchless technologies. For the reliable operation of the developed method, a simple method to apply pressure and vacuum to the reinforcement was devised and flexible mold technology was tried. Also, resin filling and cure status during RTM process were monitored with a commercial dielectrometry cure monitoring system, LACOMCURE. From the investigation, it has been found that the developed repairing-reinforcing technology with appropriate process variables and on-line cure monitoring has many advantages over conventional methods.

  • PDF

확률 시평에서 잔존가치를 고려한 최적의 교체 주기 (Optimum Replacement Intervals Considering Salvage Values In Random Time Horizon)

  • Park, Chung-Hyeon;Lee, Dong-Hoon
    • 한국군사과학기술학회지
    • /
    • 제4권1호
    • /
    • pp.170-176
    • /
    • 2001
  • An optimization problem to obtain the optimal replacement interval considering the salvage values is studied. The system is minimally repaired at failure and is replaced by new one at age T(periodic replacement policy with minimal repair of Barlow and Hunter〔2〕). Our model assumes that the time horizon associated with the number of replacements is random The total expected cost considering the salvage values with random time horizon is obtained and the optimal replacement interval minimizing the cost is found by numerical methods. Comparisons between non-considered salvage values and this case are made by a numerical example.

  • PDF

두 가지 고장형태를 고려한 생산 및 예방보전 정책 (A Production and Preventive Maintenance Policy with Two Types of Failures)

  • 김호균;조형수
    • 품질경영학회지
    • /
    • 제30권3호
    • /
    • pp.53-65
    • /
    • 2002
  • This paper studies an economic manufacturing quantity (EMQ) model with two types of failures and planned preventive maintenance of the production facility. One is a type I (major) failure which should be corrected by a failure maintenance and the other is a type H (minor) failure which can be minimally repaired without interrupting the production run. The objective is to determine the lot size and preventive replacement policy minimizing the long-run expected cost per unit time. We consider a control policy with a constant production lot size and preventive maintenance after completing n production runs. It is assumed that both preventive and failure maintenance times are random and the demand arriving during a stock-out period is lost. An expression for the expected cost per unit time is obtained in the general case. A special case is discussed and numerical results are provided.

Phase-Type 분포를 이용한 보증서비스 비용 분석 (Warranty Servicing Cost Analysis Using Phase-Type Lifetime Distributions)

  • 김호균;백천현;조형수
    • 한국경영과학회지
    • /
    • 제25권3호
    • /
    • pp.41-48
    • /
    • 2000
  • We consider the question of warranties for repairable items. During the warranty period, each time an item fails the manufacturer has the obligation to restore the item to operational condition either by repairing the item or by replacing it by a new item. In this paper, we consider a warranty policy for making this decision based on the condition of the failed item. For products with phase-type lifetime distributions where the phases represent the condition of the item, we develop algorithms to determine the expected cost of servicing a warranty and use it in making the repair/replacement decision. illustrative numerical examples are presented.

  • PDF

V-METRIC 관련연구들에 관한 고찰 (Review of Studies on V-METRIC Related Models)

  • 김윤화;이성용
    • 시스템엔지니어링학술지
    • /
    • 제12권2호
    • /
    • pp.47-57
    • /
    • 2016
  • As the inventory costs of repairable items in military logistics continue to increase, many studies for optimal inventory level of these items are being carried out in advanced countries, including the US, to reduce these costs. Research on inventory level optimization for repairable items aimed to achieve the availability goal of a system with a MIME(Multi Indenture Multi Echelon) repair policy structure first began with Sherbrooke's METRIC and developed into various types. This research is to analyze and compare recent V-METRIC related studies to search for another variation in this field. This paper mainly looks at how to determine optimum inventory level for each repairable item to achieve a specific availability target within a limited budget, and also how to minimize inventory cost while achieving its availability target by determining optimal inventory level of each repairable item.

신뢰성 성장 개발단계에서 지연수정과 개발시험비용을 고려한 신뢰성 성장관리 (Reliability growth management for the delayed fixes and development cost in the reliability growth development phase)

  • 김준홍;정원
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제5권3호
    • /
    • pp.381-391
    • /
    • 2005
  • The level of reliability attained largely depends upon the investment in reliability growth programs during development phase. In order to find the relationship between reliability growth test time and BRTE(basic reliability tasks effectiveness) in a reliability improvement program that minimizes LCC in which contains the reliability growth cost, repair and replacement costs, and spare parts ordering costs in service with given service rate in management policy, the growth rate has been suggested proper LCC versus growth rate. This model employs the reliability growth projection with delayed fixes in avionic equipment based on AMSAA.

  • PDF

AHP 기법을 이용한 교량상부구조의 VE 검토

  • 박장호;신영석;안예준;이광균
    • 건설안전기술
    • /
    • 통권52호
    • /
    • pp.58-66
    • /
    • 2011
  • This study presents an algorithm to select the best alternative plane among various bridge superstructure types (Steel box girder, Rational girder, PSC-I girder) using Value Engineering (VE). Economical efficiency, landscape, constructability, maintenance, stability, function of bridge superstructure were taken into consideration in the designing of bridge. Economical efficiency was evaluated for each alternative plan with optimal design considering Life Cycle Cost (LCC), Repair and rehabilitation histories and some factors were set to get reasonable results. In the application of Analytic Hierarchy Process (AHP), consistency of Pairwise Comparisons Matrix was evaluated and the best plan was determined.

  • PDF

사무소 리모델링의 실내환경요소에 대한 선호도 분석 -수요자와 공급자 측면 비교를 중심으로- (An Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling)

  • 최진혁;박태은;이정복;김소연;이경회
    • KIEAE Journal
    • /
    • 제2권4호
    • /
    • pp.57-64
    • /
    • 2002
  • Nowadays the importance of Building Remodeling as a means to create an architectural environment capable of responding to the social, economic changes has increased more than before. After long time pass, the aged building have faced the need for the overall repair of the structure and function. Remodeling is much more saving the time and cost than new construction in the office building. This study was focused in functional and efficient evaluation. Based on these points, we developed the evaluation factors, and verified a validity of evaluation factors through a survey. The purpose of this study was focused on the Analysis for Recognizing the priority of Indoor Environmental Factors in office Remodeling. This study provides us the competitive guidance of remodeling. The owners and tenants take the maximum efficiency with the minimum cost.

Periodic PM Policy for Repairable System with RCW or NCW

  • Jung, Gi-Mum;Kim, Dae-Kyung;Park, Dong-Ho
    • International Journal of Reliability and Applications
    • /
    • 제3권3호
    • /
    • pp.113-124
    • /
    • 2002
  • This paper suggests the optimal periodic preventive maintenance policies after the combination warranty is expired. After the combination warranty is expired, a repairable system undergoes PM periodically and is minimally repaired at each failure. And also the system is replaced by a new system at the N th PM. In this case, we derive the mathematical formula for the expected cost rate per unit time. The optimal number and period for the periodic PM that minimize the expected cost rate per unit time are obtained. Some numerical examples are presented for illustrate purpose.

  • PDF

Performance Analysis of a Parallel System Having a Cold Standby Unit

  • Sharma, S.C.;Bae, S.;Baek, J.B.;Singh, K.P.
    • International Journal of Reliability and Applications
    • /
    • 제8권1호
    • /
    • pp.67-82
    • /
    • 2007
  • This paper deals with the effectiveness analysis of an engineering system, which has two units of different strengths in parallel and one unit as a cold standby unit. Failure times for all the units have negative exponential distribution whereas their repair times have general distribution. Single server caters the need for the system. The effectiveness analysis of the system is done by using regenerative point technique. The different measures of effectiveness such as mean sojourn time, mean time to system failure, availability, busy period, etc, are derived. Cost factors also taken into consideration.

  • PDF