• Title/Summary/Keyword: Repair Cost

Search Result 689, Processing Time 0.028 seconds

Further Approximate Optimum Inspection Intervals

  • Leung, Kit-Nam Francis
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.2
    • /
    • pp.123-128
    • /
    • 2005
  • The author derives a general explicit formula and presents an heuristic algorithm for solving Baker’s model. The examples show that this new approximate solution procedure for determining near optimum inspection intervals is more accurate than the ones suggested by Chung (1993) and Vaurio (1994), and is more efficient computationally than the one suggested by Hariga (1996). The construction and solution of the simplest profit model for an exponential failure distribution were presented in Baker (1990), and approximate analytical results were obtained by Chung (1993) and Vaurio (1994). The author will therefore mainly devote the following discussion to the problem of further approximating optimum inspection intervals.

Reinforced Concrete Slabs with Corroded Bars (철근이 부식된 콘크리트 슬래브의 구조성능 평가에 대한 실험적 연구)

  • Jung, Eun-Chul;Lee, Kyoung-Un;Chung, Lan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10a
    • /
    • pp.718-723
    • /
    • 2000
  • Corrosion is a world wide problem effecting a large number of structure. Cost of repair and rehabilitation on reinforcement structure damaged by steel corrosion is expensive. But structural capacity on low level corrosion is increased. So this experimental study was performed to know structural performance on reinforced concrete slabs with low level corroded bars. As in the case of test samples, bond stress and structural capacity increases up to 2% corrosion level.

  • PDF

Proper Decision for Maintenance Intervals of Equipment in Power Stations by Considering Maintenance Replacement Rate and Operation Rate

  • Nakamura, Masatoshi;Suzuki, Yoshihiro;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.157.3-157
    • /
    • 2001
  • In this paper, the optimal maintenance scheduling for turbine with considering maintenance replacement rate was proposed in order to reduce the maintenance cost during the whole period of operation, meanwhile keeping current reliability of turbine. The proposed method is only based on a few limited available data with various factors relating to maintenance replacement and repair of turbine. The proposed method will be adopted by Kyushu Electric Power Co., Inc. from April in 2002 to determine the maintenance schedule of thermal power plants.

  • PDF

Optimum Periodic Preventive Maintenance Time for a System with Imperfect Maintenance (불완전보전을 고려한 시스템의 최적 정기 예방보전 시기)

  • 정영배
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.221-226
    • /
    • 1994
  • Almost preventive maintenance policies assumed that the system after pm has failure rate as before pm with probability p and as good as new with probability 1-p. This paper considers the s-expected cost of the model with imperfect periodic preventive maintenance that increasing minimal repair costs at failure and obtains the optimum periodic preventive maintenance time. Numerical example are shown in which the failure time of the system has gamma distribution.

  • PDF

Tumescent Local Anesthesia for Hand Surgery: Improved Results, Cost Effectiveness, and Wide-Awake Patient Satisfaction

  • Lalonde, Donald;Martin, Alison
    • Archives of Plastic Surgery
    • /
    • v.41 no.4
    • /
    • pp.312-316
    • /
    • 2014
  • This is a review article of the wide-awake approach to hand surgery. More than 95% of all hand surgery can now be performed without a tourniquet. Epinephrine is injected with lidocaine for hemostasis and anesthesia instead of a tourniquet and sedation. This is sedation-free surgery, much like a visit to a dental office. The myth of danger of using epinephrine in the finger is reviewed. The wide awake technique is greatly improving results in tendon repair, tenolysis, and tendon transfer. Here, we will explain its advantages.

Optimal Replacement Policy for Stepdown Warrantied System with Minimal Repair (응급수리(應急修理)가 가능(可能)한 단계별(段階別) 사후보증제품(事後保證製品)의 최적교체정책(最適交替正策))

  • Kim, Won-Jung;Lee, Geun-Hui
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.13 no.2
    • /
    • pp.59-63
    • /
    • 1987
  • An age replacement policy is considered for a system under a stepdown warranty. It is assumed that only minimal repairs are performed for failures occurred before age T.A unique optimal value of T which minimiges the expected cost rate is obtained. The cases of the free replacement warranty, prorata warranty and hybrid warranty are also considered and some numerical examples are given.

  • PDF

Field Performance Evaluation of Preventive Maintenance Methods (예방적 유지보수 공법의 현장 적용성능 평가 연구)

  • Lee, Sang Yum
    • International Journal of Highway Engineering
    • /
    • v.19 no.2
    • /
    • pp.103-112
    • /
    • 2017
  • PURPOSES : In this study, field performance evaluation of crack treatment of pavement and the feasibility of surface treatment of pavement are presented. The performance and cost of preventive maintenance methods have been previously verified, and the methods are being used in many developed countries and cities. However, the performance and cost of the system have not been verified in domestic, field applications. Therefore, in order to improve performance, the field performance is evaluated, and a reasonable cost is proposed. METHODS : Visual Inspection was conducted to evaluate the field application and performance of the preventive maintenance method. In addition, the PCI index was calculated from the results of visual inspection of the application area of the surface treatment method, and the performance life of each method was predicted. For the economic evaluation, life cycle cost analysis was performed using the life cycle cost analysis program. RESULTS :In order to evaluate and quantify the field performance of crack repair material, the residue condition of the pavement surface after crack treatment, rather than the performance of the material, is evaluated. In addition, the crack resistance and performance life of surface treatment methods are evaluated. The cost of currently available treatment methods are compared to the common pavement cut and overlay method, and it is determined that the preventive method is not economical based on life cycle cost analysis. CONCLUSIONS :Because of the characteristics of cracking, it is necessary to conduct the evaluation of currently applied methods and the analysis of the cause of damage, by visual inspection. Moreover, in order to evaluate the performance and economic suitability of the currently applied surface treatment methods, it is necessary to acquire information on application sections by monitoring their long-term conditions and performance.

A Study on Structural Maintenance of 'Old Wall' Designated as National Registered Cultural Heritage (국가등록문화재로 지정된 옛 담장의 정비 양상)

  • So, Hyun-Su;Jeong, Myeong-Seok
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.21-34
    • /
    • 2023
  • This study identified the materials and construction methods of 'Old Wall' in 13 villages which were designated as National Registered Cultural Heritage at the time of designation and examined the their structural changes based on field survey. The results are as follows: First, the 'Old Wall' consisted of 10 Soil-Stone Wall and 5 Stone Wall. At the time of designation, Stone Wall, which was built irregularly by dry-construction of natural stones, is similar in shape, but Soil-Stone Wall showed difference by the construction method of making used stones, joints, and faces. Second, the study extracted the changes of 'Old Wall' by repair and examined the changes of construction methods as well as the substitution and addition of materials of structure. The wall-roof was built with cement roof-tile and asbestos slate which have the advantage improve durability and cost-effectiveness. In addition, tile-mouth soil was added to korean traditional roof-tile to prevent rainwater from flowing in. Besides, to improve constructional convenience, the natural stone of the wall-body was replaced with blast stone, float stone and cut stone. Cement block, cement brick and cement mortar were frequently used to repair as well. As Soil-Stone Wall was transformed from irregular pattern-construction to comb pattern-construction and wet-construction was changed to dry-construction, it caused landscape and structural problems. Also, the layer of cement mortar applied to wall-foundation blocked the flow of rainwater that was induced by dry-construction of natural stones. Third, the study regarded that the problem with the repair of 'Old Wall' may occur as it is located in living space, because the owner of the wall could repair for the minor damages without technical knowledge. In addition, it is difficult for repair companies in charge of maintenance of Cultural Heritage to supply local materials, and it is differential construction specifications are not applied.

Reliabilty of a System with Standbys and Spares

  • Park, Kyung-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.3 no.2
    • /
    • pp.83-91
    • /
    • 1977
  • This paper investigates the reliability characteristics of a system consisting of a unit operating on-line and backed by n spares among which m units are kept "warm" as standbys ready to go on-line. The on-line unit has an arbitrary lifetime distribution, while the warm standbys have exponential failure time distributions. The Failed units are repaired and brought back to service. The cold spares do not fail while in storage. Solution of this extremely complicated queuing problem using a "renewal counting" approach is presented and extended to the situation where the warming-up takes non-negligible time. Finally, an approach to the economic system management is discussed, considering the long-run availability, cost of keeping spares and repair facility, and the associated cost of restarting the system, after a system failure. The model presented in this paper will have many applications including the determination of the spares inventory and the number of field spares to be "carried".

  • PDF

Trenchless Repairing-Reinforcing Process of Underground Pipes with Advanced Composite Materials (신소재 복합재료를 이용한 비굴착 지하매설관 보수-보강공법)

  • 진우석;권재욱;이대길;유애권
    • Proceedings of the Korean Society For Composite Materials Conference
    • /
    • 2001.10a
    • /
    • pp.43-48
    • /
    • 2001
  • To overcome the disadvantages of conventional excavation technology, various trenchless (or excavation free, or no-dig) repair-reinforcement technologies have been developed and tried. But trenchless technologies so fat developed have some brawbacks such as high cost and inconvenience of operation. In this study, a repairing-reinforcing process for underground pipes with glass fiber fabric polymer composites using VARTM(Vacuum Assisted Resin Transfer Molding) has been developed. The developed process requires shorter operation time and lower cost with smaller and simpler operating equipments than those of the conventional trenchless technologies. For the reliable operation of the developed method, a simple method to apply pressure and vacuum to the reinforcement was devised and flexible mold technology was tried. Also, resin filling and cure status during RTM process were monitored with a commercial dielectrometry cure monitoring system, LACOMCURE. From the investigation, it has been found that the developed repairing-reinforcing technology with appropriate process variables and on-line cure monitoring has many advantages over conventional methods.

  • PDF