• 제목/요약/키워드: Repair Cost

검색결과 693건 처리시간 0.035초

Fatigue Behavior of Cracked Al 6061-T6 Alloy Structures Repaired with Composite Patch

  • Yoon, Young-Ki;Park, Jong-Joon;Kim, Guk-Gi;Yoon, Hi-Seak
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제2권3호
    • /
    • pp.5-10
    • /
    • 2001
  • Due to the development of high-strength fibers and adhesives, it is now possible to repair cracked metallic plates by bonding reinforced patches to the plate over the crack. In this study, pre-cracked aluminum 6061-T6 alloy plates repaired with bonded carbon/epoxy composite patch are applied to investigate the effect of various patch shapes on the tensile strength and the fatigue behavior of the structure. A non-patch-boned cased and 2 type-50$\times$50, 40$\times$20 mm-composite patch-bonded cases were tested to obtain fracture loads and fatigue crack growth rate. The results showed that the patch-bonded repair improves the static strength by 17% and the fatigue life by 200% compared to non-repaired case. It means that patch-boned repair is more effective in the fatigue life. It was also revealed that the patching method along crack growth direction is more efficient in cost and weight reduction. By observing the fractography, patch-bonded repair specimens demonstrated zigzag fracture patterns compared with the non-patched specimens, which shows a typical ductile fracture.

  • PDF

DEVELOPMENT AND REPAIR OF LAMINATE TOOLS BY JOINING PROCESS

  • Yoon, Suk-Hwan;Na, Suck-Joo
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2002년도 Proceedings of the International Welding/Joining Conference-Korea
    • /
    • pp.402-407
    • /
    • 2002
  • Laminate tooling process is a fast and simple method to make metal tools directly for various molding processes such as injection molding in rapid prototyping field. Metal sheets are usually cut, stacked, aligned and joined with brazing or soldering. Through the joining process, all of the metal sheet layers should be rigidly joined. When joining process parameters are not appropriate, there would be defects in the layers. Among various types of defects, non-bonded gaps of the tool surface are of great importance, because they directly affect the surface quality and dimensional accuracy of the final products. If a laminate tool with defects has to be abandoned, it could lead to great loss of time and cost. Therefore a repair method for non-bonded gaps of the surface is essential and has important meaning for rapid prototyping. In this study, a rapid laminate tooling system composed of a CO2 laser, a furnace, and a milling machine was developed. Metal sheets were joined by furnace brazing, dip soldering and adhesive bonding. Joined laminate tools were machined by a high-speed milling machine to improve surface quality. Also, repair brazing and soldering methods of the laminates using the $CO_2$ laser system have been investigated. ill laser repair process, the beam duration, beam power and beam profile were of great importance, and their effects were simulated by [mite element methods. The simulation results were compared with the experimental ones, and optimal parameters for laser repair process were investigated.

  • PDF

Reliability analysis of a complex system, attended by two repairmen with vacation under marked process with the application of copula

  • Tiwari, N.;Singh, S.B.;Ram, M.
    • International Journal of Reliability and Applications
    • /
    • 제11권2호
    • /
    • pp.107-122
    • /
    • 2010
  • This paper deals with the reliability analysis of a complex system, which consists of two subsystems A and B connected in series. Subsystem A has only one unit and B has two units $B_1$ and $B_2$. Marked process has been applied to model the complex system. Present reliability model incorporated two repairmen: supervisor and novice to repair the failed units. Supervisor is always there and the novice remains in vacation and is called for repair as per demand. The repair rates for supervisor and novice follow general and exponential distributions respectively and the failure time for both the subsystems follows exponential distribution. The model is analyzed under "Head of line repair discipline". By employing supplementary variable technique, Laplace transformation and Gumbel-Hougaard family of copula various transition state probabilities, reliability, availability and cost analysis have been obtained along with the steady state behaviour of the system. At the end some special cases of the system have been taken.

  • PDF

Antifuse Circuits and Their Applicatoins to Post-Package of DRAMs

  • Wee, Jae-Kyung;Kook, Jeong-Hoon;Kim, Se-Jun;Hong, Sang-Hoon;Ahn, Jin-Hong
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제1권4호
    • /
    • pp.216-231
    • /
    • 2001
  • Several methods for improving device yields and characteristics have been studied by IC manufacturers, as the options for programming components become diversified through the introduction of novel processes. Especially, the sequential repair steps on wafer level and package level are essentially required in DRAMs to improve the yield. Several repair methods for DRAMs are reviewed in this paper. They include the optical methods (laser-fuse, laser-antifuse) and the electrical methods (electrical-fuse, ONO-antifuse). Theses methods can also be categorized into the wafer-level(on wafer) and the package-level(post-package) repair methods. Although the wafer-level laser-fuse repair method is the most widely used up to now, the package-level antifuse repair method is becoming an essential auxiliary technique for its advantage in terms of cost and design efficiency. The advantages of the package-level antifuse method are discussed in this paper with the measured data of manufactured devices. With devices based on several processes, it was verified that the antifuse repair method can improve the net yield by more than 2%~3%. Finally, as an illustration of the usefulness of the package-level antifuse repair method, the repair method was applied to the replica delay circuit of DLL to get the decrease of clock skew from 55ps to 9ps.

  • PDF

Right Ventricular Strain Is Associated With Increased Length of Stay After Tetralogy of Fallot Repair

  • Ranjini Srinivasan;Jennifer A. Faerber;Grace DeCost;Xuemei Zhang;Michael DiLorenzo;Elizabeth Goldmuntz;Mark Fogel;Laura Mercer-Rosa
    • Journal of Cardiovascular Imaging
    • /
    • 제30권1호
    • /
    • pp.50-58
    • /
    • 2022
  • BACKGROUND: Little is known regarding right ventricular (RV) remodeling immediately after Tetralogy of Fallot (TOF) repair. We sought to describe myocardial deformation by cardiac magnetic resonance imaging (CMR) after TOF repair and investigate associations between these parameters and early post-operative outcomes. METHODS: Fifteen infants underwent CMR without sedation as part of a prospective pilot study after undergoing complete TOF repair, prior to hospital discharge. RV deformation (strain) was measured using tissue tracking, in addition to RV ejection fraction (EF), volumes, and pulmonary regurgitant fraction. Pearson correlation coefficients were used to determine associations between both strain and CMR measures/clinical outcomes. RESULTS: Most patients were male (11/15, 73%), with median age at TOF repair 53 days (interquartile range, 13,131). Most patients had pulmonary stenosis (vs. atresia) (11/15, 73%) and 7 (47%) received a transannular patch as part of their repair. RV function was overall preserved with mean RV EF of 62% (standard deviation [SD], 9.8). Peak radial and longitudinal strain were overall diminished (mean ± SD, 33.80 ± 18.30% and -15.50 ± 6.40%, respectively). Longer hospital length of stay after TOF repair was associated with worse RV peak radial ventricular strain (correlation coefficient (r), -0.54; p = 0.04). Greater pulmonary regurgitant fraction was associated with shorter time to peak radial RV strain (r = -0.55, p = 0.03). CONCLUSIONS: In this small study, our findings suggest presence of early decrease in RV strain after TOF repair and its association with hospital stay when changes in EF and RV size are not yet apparent.

식도 재건 수술후 발생한 합병증 치험 (Treatment of the complications of the esophageal reconstructive procedures)

  • 이두연;윤치순;홍승록
    • Journal of Chest Surgery
    • /
    • 제24권5호
    • /
    • pp.463-469
    • /
    • 1991
  • Post-anastomotic leakage and stenoses remain major complications and are still responsible for many mortalities after esophageal reconstructive procedures. If the hand-suture is used, anastomotic leaks developed frequently than stenoses. But post-anastomotic leakages are more critical than post-anastomotic stenoses. If the stapler is used, anastomotic stenoses will develop frequently and not critical than anastomotic leakages. The stapler suture method is easier and quicker than the hand suture method in the esophageal anastomotic procedures. But the disadvantages of the stapler suture method is that there is not reachable site with anastomotic stapler the thoracic inlet region and the cost is expensive. We have treated 44 cases of the surgical complications after esophageal reconstructive procedure with conservative and surgical treatment for 10 years from January, 1980 to December, 1989. The anastomotic site stenoses were 8 cases in the hand-suture methods and 4 cases in the stapler-suture methods. The anastomotic leaks were 8 cases in hand-suture methods and 5 cases in stapler-suture methods. There were one death in the surgical repair of four post-operative anastomotic stenoses and two deaths in the surgical repair of three post-operative anastomotic leakages. Ever though we consider that there is more anastomotic leakage than stenoses after the hand-suture methods in esophageal reconstructive procedures. the cost with long stay in the intensive care unit to treat anastomotic leakage after the hand-suture, would be more expensive than-the cost of the treatment of the anastomotic stenoses after auto-suture.

  • PDF

공동주택 재건축시기 산정연구(II) - 유지관리 비용을 이용한 열화도 분석을 중심으로 - (A Study on the Rebuilding-Time in terms of the Apartment Housing - Focused on the Deterioration Analysis with the Maintenance Cost -)

  • 이강희;박근수;채창우
    • KIEAE Journal
    • /
    • 제11권6호
    • /
    • pp.13-18
    • /
    • 2011
  • Building is different from the general commodities and needs to maintain the function and performance to get the living condition. Building deterioration occurs naturally with time elapse. Deterioration reasons are various. These are physical, functional, social and second physical aspect. Building would inevitably be deteriorated and need to repair various building part and materials. It gets to arrive at repair or rebuilding time until any management activity is meaningless. It is important to decide the rebuilding time in a management cost. In this paper, it aimed at analyzing the management annual cost and provide a rebuilding time of a apartment housing with a deterioration curve model. Results of this study are as follows : Most of the building has started to deteriorate in 40 years when the performance of building downgrades to 20%. After it past about 40 years, the deterioration rate is faster than the earlier 40 years. Fourth, the rebuilding time of an apartment housing is recommended about 45 years if the building service life has 60 years.

정기교체 및 최소수리를 고려한 작업주기 횟수 최적화 (Optimal Working Cycles for Minimal Repair Policy)

  • 이진표
    • 품질경영학회지
    • /
    • 제48권1호
    • /
    • pp.201-214
    • /
    • 2020
  • Purpose: The purpose of this paper is to determine an optimal number of cycle times for the replacement under the circumstance where the system is replaced at the periodic time and the multiple number of working cycles whichever occurs first and the system is minimally repaired between the replacements if it fails. Methods: The system is replaced at periodic time () or cycle time, whichever occurs first, and is repaired minimally when it fails between successive replacements. To determine the optimal number of cycle times, the expected total cost rate is optimized with respect to the number of cycle times, where the expected total cost rate is defined as the ratio of the expected total cost between replacements to the expected time between replacements. Results: In this paper, we conduct a sensitivity analysis to find the following results. First, when the expected number of failures per unit time increases, the optimal number of cycle times decreases. Second, when the periodic time for replacement becomes longer, the optimal number of cycle times decreases. Third, when the expected value for exponential distribution of the cycle time increases, the optimal number of cycle times increases. Conclusion: A mathematical model is suggested to find the optimal number of cycle times and numerical examples are provided through the sensitivity analysis on the model parameters to see the patterns for changes of the optimal number of cycle times.

보도용 블록포장 유지보수 공사 원가산정기준 개정 연구 (A Study on the Revision of the Cost accountingfor Sidewalk Block Pavement Maintenance and Repair Work)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.271-272
    • /
    • 2021
  • The maintenance and repair work of sidewalk block pavement is a construction that requires a large amount of budget to be invested every year. It is important to establish an appropriate standards for estimating construction cost to ensure proper budgeting and quality. In this study, the standards for estimating the cost of maintenance and construction work for sidewalk blocks that can be applied to the construction volume classified according to the site conditions, construction type, and equipment use differentiated from new construction was established. As a result, the daily construction volume was presented by reflecting excavator and truck as equipment in the combination of paver and common worker. The re-installation was applied by separating the construction volume of sections with general blocks and induction/raised blocks based on the installation of sidewalk blocks after demolition. Generally if block cutting is necessary, the precision construction conditions using a cutting machine were taken into consideration to secure the construction quality. In addition, it has been revised to apply classified construction volume into A and B-Type depending on the park and site conditions.

  • PDF

Steel Box교와 PSC Box교의 LCC 분석에 관한 사례연구 (A Case Study on the Life Cycle Cost Analysis of Steel Box Girder and Prestressed Concrete Box Girder Bridge)

  • 안장원;차강석;김용수
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.59-67
    • /
    • 2001
  • 본 연구는 사례연구를 통해서 강박스교와 PSC박스교의 생애주기비용(LCC)을 분석하여 경제성을 평가하는데 목적이 있다. 본 연구에서는 유지관리비를 산출하기 위해 보수 및 교체주기에 대한 설문조사를 실시하였으며, 교량 형식별 LCC 분석 및 비교에는 현재가치 법을 이용하였다. 본 연구의 수행 결과를 요약하면 다음과 같다. (1) 사례 연구를 통해 강박스교와 PSC박스교의 LCC 분석모델을 제시하였다. (2) 설문조사를 실시하여 강박스교와 PSC박스교 부속물의 보수 및 교체주기를 산정하였다. (3) LCC 사례 연구 결과, PSC박스교가 강박스교보다 경제적인 것으로 분석 되었다.

  • PDF